CBAP IIBA Practice Test Questions and Exam Dumps
Question No 1:
After a solution has been successfully implemented and is running in production, what term is used to describe the total cost incurred throughout its lifespan, including all ongoing costs associated with its maintenance, operations, and support?
A. Total ownership costing
B. Lifecycle maintenance fees
C. Sustainability fees
D. Total cost of ownership
Correct Answer:
D. Total cost of ownership
When considering the costs associated with a solution that has been implemented into production, it is important to account for the complete set of expenses throughout the solution’s lifecycle. These costs go beyond the initial purchase or development cost and include ongoing expenditures for maintenance, updates, support, and other operational expenses. The Total Cost of Ownership (TCO) is the comprehensive measure used to capture all these costs over time.
Let's examine the different options:
While this option seems relevant, it is not the standard term used in the industry. The term Total Cost of Ownership (TCO) is more widely recognized and precisely refers to the overall cost incurred during the entire lifecycle of an asset, including both direct and indirect costs. "Total ownership costing" is not a commonly used term in this context.
This option focuses only on the maintenance aspect of the solution's costs. Lifecycle maintenance fees would refer to the recurring costs related to keeping the system running, such as software patches, hardware servicing, and technical support. However, this is just a subset of the broader concept of the Total Cost of Ownership, which includes not only maintenance costs but also installation, training, energy consumption, operational costs, and depreciation.
This term is more closely associated with the ongoing costs and efforts related to environmental sustainability and ensuring that the solution complies with green practices. It’s not a general term for the total cost of running a solution and doesn't fully encompass the broad scope of expenses involved in maintaining and supporting a system throughout its lifecycle.
The Total Cost of Ownership (TCO) is the industry-standard term that describes the complete cost of a solution or asset throughout its entire lifecycle, from acquisition to disposal. TCO includes initial purchase costs, ongoing operating costs (such as energy, licensing, support), training, maintenance, and even future upgrades. It is a comprehensive and holistic view of all expenses associated with an IT solution or any enterprise system.
Total Cost of Ownership (TCO) is the correct term to use when discussing the full financial impact of a solution after it has been implemented. It accounts for the total expenditures, both upfront and ongoing, that an organization will incur throughout the solution’s lifecycle. Understanding TCO helps organizations make informed decisions and manage their budgets effectively.
Question No 2:
In enterprise analysis, there are five key outputs generated during the process. Which one of the following is considered an output of the enterprise analysis tasks?
A. Assumptions and constraints
B. Stakeholder concerns
C. Solution performance assessment
D. Solution approach
Correct Answer:
D. Solution approach
Enterprise analysis is a critical part of business analysis and involves understanding the organization’s needs, goals, and constraints. This phase is crucial for laying the groundwork for project success by defining the scope, objectives, and potential solutions. The enterprise analysis tasks focus on identifying business problems, opportunities, and solutions at a high level, and they typically lead to the development of several outputs that guide decision-making for the organization.
Let’s look at each option to understand which one is an output of the enterprise analysis tasks:
While assumptions and constraints are important factors that need to be considered during enterprise analysis, they are not outputs of the process. Rather, they are aspects that need to be addressed and documented during the analysis to ensure that the planning and execution of a solution are realistic and achievable. These elements often shape the decision-making process but are not direct outputs of enterprise analysis.
Stakeholder concerns are also crucial to identify and understand during enterprise analysis. They are typically gathered during stakeholder analysis and engagement. While these concerns may be considered when evaluating potential solutions, they are not typically an explicit output of the enterprise analysis phase itself. The goal of enterprise analysis is to align the needs of the business with the solutions that will be implemented, so while stakeholder concerns are important, they don’t form a direct "output" from the analysis tasks.
Solution performance assessment typically occurs after the solution has been implemented and is being evaluated for effectiveness. It is not an output of the enterprise analysis process, as this step occurs later in the project lifecycle when the actual solution is in use. Enterprise analysis is concerned with identifying the needs and defining potential solutions rather than assessing how those solutions perform in practice.
The solution approach is one of the five key outputs of enterprise analysis. This output involves defining the recommended course of action to address the identified business need. It outlines the general direction for the solution, including strategic goals, business objectives, and the nature of the approach that will best meet the organization’s needs. The solution approach is a high-level recommendation that serves as the foundation for further analysis and project development.
The solution approach is the correct output of the enterprise analysis process. It lays the groundwork for identifying specific solutions that align with the organization’s needs and goals. By defining the strategic approach, enterprise analysis helps ensure that all subsequent efforts are aligned with the business objectives and stakeholder expectations.
Question No 3:
All of the following stakeholders typically participate in the prioritization of requirements, except for which one?
A. Implementation subject matter expert
B. Project team
C. Domain subject matter expert
D. Project manager
Correct Answer:
A. Implementation subject matter expert
In any project, particularly those involving business analysis and requirements gathering, the prioritization of requirements is a critical task. Prioritizing requirements ensures that the most important and valuable features or aspects of the project are implemented first. Several stakeholders play important roles in the process of prioritization, but not all stakeholders are equally involved in every step. Let’s review each stakeholder's role and why one of them does not typically participate in the prioritization of requirements.
An Implementation Subject Matter Expert (SME) typically provides expertise on the technical aspects of implementing a solution. While they are important during the design and implementation phases of the project, they are not usually directly involved in the prioritization of requirements. The implementation SME focuses on ensuring that the solution is built and deployed effectively according to the technical requirements, but prioritizing business or user requirements is generally outside their scope. They may provide input on the feasibility of certain requirements but do not directly influence the ranking or prioritization of those requirements.
The Project team is often involved in the prioritization of requirements because they are directly engaged in the execution of the project. They provide insights into the technical and logistical aspects of meeting the requirements, and their input helps ensure that realistic priorities are established based on project constraints like resources, timelines, and technical capabilities. Their involvement ensures that the prioritization process reflects the project’s capacity for successful delivery.
The Domain Subject Matter Expert (SME) has deep knowledge of the business area that the project addresses. They are crucial to the requirements gathering and prioritization process, as they understand the business needs, processes, and challenges. Their expertise ensures that the requirements that are most critical to the organization’s success are given appropriate priority.
The Project Manager plays a key role in prioritizing requirements. As the person responsible for overseeing the successful completion of the project, the Project Manager works with stakeholders to ensure that the prioritized requirements align with project goals, timelines, and resource constraints. They facilitate discussions to ensure that the most critical requirements are addressed first, balancing scope, schedule, and cost considerations.
While all stakeholders listed are critical in different stages of the project, the Implementation Subject Matter Expert (Option A) typically does not have a direct role in the prioritization of requirements. Their focus is more on the technical feasibility of implementing the solution, rather than determining which requirements are most important to stakeholders and the business. Therefore, the correct answer is A. Implementation subject matter expert.
Question No 4:
You are the business analyst for your organization. Management has asked you to create a model of the requirements to help stakeholders better understand the project and its overall scope. Which of the following statements best describes what a model is?
A. Models are slices of the project solution.
B. Models simplify the requirements for common stakeholders.
C. Models are statistics for the return on investment, time saved, and other mathematical factors.
D. Models abstract and simplify reality.
Correct Answer:
D. Models abstract and simplify reality.
In the context of business analysis and project management, a model is a tool or representation that simplifies complex information or systems, helping stakeholders better understand the requirements and the overall project. Let’s go over the four options to explain why D. Models abstract and simplify reality is the correct answer.
This statement is inaccurate. While models may represent different aspects or components of a solution, the term “slices” is not an accurate description of what a model is in business analysis. A model typically represents a broader, abstract view of the project requirements, not a limited “slice” or specific portion of the solution. Instead, it serves to represent or simulate how different parts of the system work together in a simplified manner.
While it is true that models help simplify requirements, the term "common stakeholders" is too limiting. A well-designed model aims to provide value to all stakeholders, not just the “common” ones. It’s used to represent and communicate requirements, solutions, processes, or systems to a wide variety of stakeholders (e.g., business users, technical teams, project managers, etc.), and it serves to clarify complex concepts for all of them, not just a subset.
This statement is also incorrect. While models may include statistical elements or metrics to help assess the effectiveness of a solution, they are not confined to quantitative aspects like ROI or time saved. A model in business analysis generally focuses on abstracting and simplifying systems, processes, and requirements, rather than focusing solely on mathematical or financial metrics. Financial analysis could be part of a model, but it doesn't fully encompass what a model is.
This statement is correct. A model in business analysis is a simplified, abstract representation of a system, process, or set of requirements. Models are used to help stakeholders understand complex ideas by breaking them down into more digestible forms. For instance, process flow diagrams, wireframes, use case diagrams, or prototypes are all examples of models used in business analysis to help illustrate and simplify the reality of what is being built or implemented.
The purpose of a model is to abstract and simplify reality, making it easier for stakeholders to grasp complex ideas and requirements. By creating models, business analysts bridge the gap between complex technical systems and the business stakeholders, ensuring everyone has a clear understanding of the project and its goals. Therefore, the correct answer is D. Models abstract and simplify reality.
Question No 5:
Which plan describes the stakeholder groups, communication needs, and the appropriate level of formality required for communicating requirements?
A. Requirements management plan
B. Project management plan
C. Scope management plan
D. Business analysis communication plan
Correct Answer:
D. Business analysis communication plan
In the context of business analysis and project management, the Business Analysis Communication Plan is the document that outlines how communication about the requirements will be managed throughout the project. It specifies the stakeholders involved, their communication needs, and the level of formality required for the communication, making it the correct choice in this scenario.
While the Requirements Management Plan does play a crucial role in defining how the project’s requirements will be managed and tracked, it does not directly address the specifics of stakeholder communication. It focuses on activities such as requirement gathering, documentation, validation, and traceability. The communication aspect is typically included in the broader communication plan, not solely in the requirements management plan. Therefore, this is not the most suitable option for describing stakeholder groups, communication needs, and formality levels for requirements.
The Project Management Plan is a comprehensive document that covers the overall planning and execution of the entire project, including timelines, resources, risks, and quality management. Although it may include some communication elements, such as stakeholder engagement, it is not specifically focused on how requirements will be communicated. The communication plan related to requirements, and other aspects of business analysis, is more detailed in the Business Analysis Communication Plan. Thus, this option is broader and not specific to business analysis needs.
The Scope Management Plan defines how the scope of the project will be managed, including how changes will be handled and how the scope will be controlled. While communication about scope is part of the project, it does not delve into the specifics of how requirements and their communication needs will be handled. This plan is more concerned with defining and managing the boundaries of the project, not the communication strategies around requirements.
The Business Analysis Communication Plan is the most specific and relevant plan for this situation. It provides detailed guidance on how requirements will be communicated to stakeholders, including:
Identifying different stakeholder groups (e.g., business users, technical teams, project sponsors, etc.).
Defining the communication needs of each stakeholder group (e.g., regular updates, detailed documentation, informal discussions).
Specifying the level of formality appropriate for different types of communication (e.g., formal reports, informal meetings, emails, presentations).
This plan ensures that all stakeholders receive the right information at the right time, in the right format, to make informed decisions about the requirements.
The Business Analysis Communication Plan is the key document for ensuring that communication about requirements is clear, effective, and aligned with the needs of stakeholders. It addresses the specifics of stakeholder groups, their communication needs, and the level of formality necessary for sharing requirements. Therefore, the correct answer is D. Business analysis communication plan.
Question No 6:
You are the business analyst for a smaller project with only a few requirements. Management still wants you to establish a method for tracing these requirements throughout the project. Which type of matrix would be most suitable for this purpose?
A. Roles and responsibility matrix
B. RACI matrix
C. Coverage matrix
D. Requirements traceability matrix
Correct Answer:
D. Requirements traceability matrix
In project management and business analysis, traceability is essential to ensure that each requirement is accounted for, validated, and implemented correctly. It helps stakeholders track the status of requirements throughout the project lifecycle. The most appropriate tool for tracing requirements in this scenario is the Requirements Traceability Matrix (RTM).
The Roles and Responsibility Matrix is typically used to define and allocate roles and responsibilities within a project or a team. While it is an important tool for clarifying who is responsible for what, it does not provide the ability to trace or track requirements. This matrix is more focused on task allocation rather than tracking requirements, making it unsuitable for this context.
The RACI Matrix is a specific type of responsibility assignment matrix that clarifies roles by identifying who is Responsible, Accountable, Consulted, and Informed for each task or deliverable. While it is valuable for defining accountability within a team, it is not intended for tracking requirements over time. Like the Roles and Responsibility Matrix, the RACI Matrix is a tool for managing people, not for tracking the lifecycle of individual requirements.
A Coverage Matrix is used to map the requirements to various elements like business goals, tests, or system components to ensure all areas are covered. While this is a useful tool, especially for validation and testing, it is not specifically designed to trace requirements through their lifecycle. It is more about ensuring comprehensive coverage rather than tracking the progress of individual requirements.
The Requirements Traceability Matrix (RTM) is specifically designed for the purpose described in the question. It is used to track the origin, progress, and validation of each requirement throughout the project lifecycle. It links the requirements to test cases, deliverables, and project milestones to ensure that each requirement is fully implemented and verified. In a smaller project with fewer requirements, the RTM allows for a simple yet effective way to track the fulfillment of each requirement, from inception to implementation. Even though there are fewer requirements, it still provides a structured way to ensure that no requirements are overlooked.
For a smaller project where only a few requirements are involved, the Requirements Traceability Matrix (RTM) is the most suitable option. It allows the business analyst and stakeholders to trace each requirement through the project lifecycle, ensuring that all requirements are properly implemented, validated, and aligned with the project's objectives. Therefore, the correct answer is D. Requirements traceability matrix.
Question No 7:
You are the business analyst for your organization and have identified multiple solutions to a particular problem. You need a method to quickly and fairly assess which solution is the best fit for your organization. Which approach would be most effective in helping you determine the top-rated solutions?
A. Scoring system
B. Acceptance and evaluation criteria
C. Vendor assessment
D. Voting system
Correct Answer:
A. Scoring system
In a scenario where multiple solutions are available to address a problem, a business analyst needs a structured and objective approach to determine which solution is the most suitable. The most effective method in this case is the scoring system, as it provides a quantitative way to compare and rank the potential solutions based on predefined criteria.
A scoring system is a decision-making tool that assigns numerical scores to different solutions based on a set of criteria. These criteria could include factors such as cost, ease of implementation, scalability, risk, alignment with business objectives, and technical compatibility. By evaluating each solution against these criteria, the scoring system provides an objective means of comparing solutions and determining the top-rated ones. This method ensures that each solution is assessed in a structured way and allows for an easy comparison across multiple dimensions. The result is a clear ranking of solutions, making it easier to select the most appropriate one for the organization.
While acceptance and evaluation criteria are important for assessing whether a solution meets specific requirements or standards, they are not as effective in comparing multiple solutions in a structured, quantitative manner. These criteria help evaluate individual aspects of a solution’s performance or compliance but do not provide a comprehensive framework for ranking or choosing the best solution. Therefore, this option is more useful once the solution is selected, rather than for comparing different solutions.
Vendor assessments focus on evaluating the qualifications, capabilities, and reputability of the vendor providing a solution. While this is crucial for ensuring that the organization chooses a reliable vendor, it is not specifically designed to compare multiple solutions in terms of their fit for the organization’s needs. Vendor assessment is often one part of the overall decision-making process but does not directly help in ranking the solutions themselves.
A voting system could be a way to involve key stakeholders in the decision-making process, but it lacks the structured and objective approach necessary for a fair comparison. Voting may be subjective and could be influenced by individual preferences rather than a comprehensive evaluation of the solutions' merits.
The scoring system is the most effective and fair way to compare multiple solutions to a problem, as it allows the business analyst to objectively assess and rank solutions based on specific, predefined criteria. Therefore, the correct answer is A. Scoring system.
Question No 8:
In an organization that is using a change-driven approach to business analysis, how is communication typically managed?
A. Communications in a change-driven approach focus more on the frequency of communication.
B. Communications in a change-driven approach typically use face-to-face channels.
C. Communications in a change-driven approach focus more on formal communications.
D. Communications in a change-driven approach are all ad hoc.
Correct Answer:
B. Communications in a change-driven approach typically use face-to-face channels.
In business analysis, a change-driven approach focuses on adapting to evolving requirements and adjusting the project as new information becomes available. This approach is more flexible and responsive to the needs of the business, which influences how communication is managed during the process.
While frequency of communication is important in any business analysis approach, the primary focus of a change-driven approach is not necessarily on how often communication occurs, but on the quality and clarity of communication as the project evolves. Change-driven environments often require adjustments based on feedback and insights, so it's more about ensuring that relevant stakeholders are updated when changes are happening rather than simply increasing communication frequency.
Face-to-face communication is a hallmark of a change-driven approach. This method fosters real-time collaboration and ensures that all stakeholders have the opportunity to ask questions, clarify doubts, and understand the reasons behind changes. In a change-driven environment, there is often a need for quick feedback loops and direct, personal communication to address evolving needs and uncertainties. Face-to-face channels—such as meetings or workshops—allow for immediate interaction, idea exchange, and decision-making, which supports the agile and flexible nature of the change-driven methodology.
While formal communication can play a role in any approach, a change-driven methodology emphasizes adaptability, which often leads to more informal and flexible communication channels. In a change-driven environment, informal communication (such as daily stand-ups, quick check-ins, or casual discussions) tends to be more common. These informal interactions support faster responses to emerging issues, as they allow for immediate clarification and adjustments.
Although a change-driven approach values flexibility, it does not mean that communication is entirely ad hoc. While the environment may be more dynamic, it still requires structured communication methods to ensure that the necessary stakeholders are informed and aligned. Ad hoc communication could lead to confusion and inefficiency, making it impractical for managing the business analysis process.
The key to managing communications in a change-driven approach is utilizing face-to-face communication. It allows for efficient collaboration and provides the real-time adjustments necessary when dealing with frequent changes and evolving requirements. Therefore, the correct answer is B. Communications in a change-driven approach typically use face-to-face channels.
Question No 9:
You are the business analyst for your organization. Management has asked you to create a method for storing the project requirements, including those that are under development, under review, and those that have been approved. What is management asking you to create?
A. A change management system
B. A repository
C. A project scope statement
D. A requirements register
Correct Answer:
D. A requirements register
In the context of business analysis, requirements management is crucial for ensuring that the project stays on track, and that all requirements are well-documented, reviewed, and approved. The question revolves around how to store and track requirements through various stages of their lifecycle, from development to approval.
While a change management system is essential for tracking changes to the project’s scope, schedule, and other elements, it is not specifically used to store and track project requirements. Change management systems typically focus on how changes are processed and communicated across the project lifecycle. Though it may be involved in managing requirements changes, it is not designed specifically for storing and tracking requirements in their development, review, and approval stages.
A repository is a broad term that can refer to any storage system. While it could potentially be used to store project requirements, it does not explicitly convey the structured management of requirements throughout their lifecycle. A repository can store files and documents but does not inherently track the status of requirements (e.g., whether they are under review, in development, or approved). This makes it less precise for the purpose described in the question.
The project scope statement defines the boundaries of the project—what is and isn’t included in the project scope. While it outlines the project objectives and deliverables, it does not serve as a tool for tracking and storing the requirements throughout their lifecycle. The scope statement is a high-level document that provides an overview, whereas a requirements tracking method needs to be more granular and dynamic, capturing the various stages and statuses of each requirement.
A requirements register is a structured document or tool used to track the status of requirements. It includes details about the requirements, such as their description, owner, priority, status (under development, under review, approved), and any other relevant information. This register serves as a living document that tracks the progress of requirements through the stages of a project, making it the most appropriate tool for the task described in the question. A requirements register ensures that all requirements are organized, and their current status is clear to all stakeholders.
Management is asking you to create a requirements register to track the project requirements through all stages of development, review, and approval. This tool is essential for managing the requirements efficiently and ensuring that the project stays aligned with its objectives. Therefore, the correct answer is D. A requirements register.
Question No 10:
You are the business analyst for your organization and are working with Tim to identify the assumptions within the business solution. Which one of the following is an assumption?
A. The vendor believes the hardware should arrive by December 1.
B. The software must be compatible with Windows Vista.
C. The software must cost less than $99 per license.
D. The hardware must cost less than $450 per unit.
Correct Answer:
A. The vendor believes the hardware should arrive by December 1.
In business analysis, identifying assumptions is a critical part of understanding the underlying factors that affect a project’s success. Assumptions are factors that are considered true for the purpose of planning and analysis, even though they may not be verified or certain. Assumptions are made in the absence of concrete evidence, and they help guide decisions and strategies throughout the project lifecycle.
Option A: The vendor believes the hardware should arrive by December 1.
This is an assumption. It represents a belief or expectation from the vendor that the hardware will arrive by a specific date. While the vendor has provided this expectation, it is not guaranteed or verified, making it an assumption. The date of delivery is important for project planning, but it is uncertain and should be tracked as a risk in case it does not materialize.
Option B: The software must be compatible with Windows Vista.
This is a requirement, not an assumption. It is a clear and explicit specification about what the software must be able to do. The statement is definitive and can be verified, unlike an assumption, which is based on a belief or expected outcome. Requirements typically define what needs to be achieved, and in this case, it is about compatibility.
Option C: The software must cost less than $99 per license.
This is also a requirement. The price per license is a defined condition that the software must meet. Like Option B, it is a verifiable statement that sets a boundary on the cost but does not represent an uncertain belief or factor.
Option D: The hardware must cost less than $450 per unit.
This is another requirement. It specifies a maximum price for the hardware units, which is a clear and measurable condition that must be satisfied for the solution to be acceptable.
In this case, Option A is the correct answer. It describes a belief or expectation that the hardware will arrive by December 1, which, while important for planning purposes, is not a verified fact at the moment. This belief represents an assumption that has been made by the vendor and must be managed and monitored to ensure the project progresses smoothly. Therefore, A. The vendor believes the hardware should arrive by December 1 is the best example of an assumption.
Top Training Courses
LIMITED OFFER: GET 30% Discount
This is ONE TIME OFFER
A confirmation link will be sent to this email address to verify your login. *We value your privacy. We will not rent or sell your email address.
Download Free Demo of VCE Exam Simulator
Experience Avanset VCE Exam Simulator for yourself.
Simply submit your e-mail address below to get started with our interactive software demo of your free trial.