100% Latest & Updated CompTIA SY0-701 Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!
Question 230
A company must retire failed solid-state drives that stored unencrypted confidential customer contracts. Their controllers no longer respond to supported sanitize or cryptographic-erase commands, and the retirement policy requires proof that data cannot be recovered. Which TWO actions are justified for these devices? Choose TWO.
- Use an approved physical-destruction process appropriate to the SSD media and obtain verifiable destruction evidence.
- Run an ordinary operating-system quick format and assume remapped flash cells are inaccessible.
- Send the untracked failed drives to general electronic recycling because they cannot be mounted.
- Record each drive serial number, custody transfers, destruction method and verification or certificate in the disposition register.
- Keep an asset-inventory entry and shipping receipt for the recycler but obtain no validated destruction record for the actual SSD media.
Explanation
Correct Answers
A:If firmware-based erase cannot execute and plaintext customer data may remain in remapped cells, a certified destructive method matched to the flash media removes the reliance on inaccessible controller commands. Verify actual destruction of the relevant storage components, not merely transport to a recycler.
D:Serialized custody and a destruction record connect each physical SSD to the approved process and resulting evidence. This is jointly needed with physical destruction: an impressive certificate is insufficient if the company cannot show that the actual contract-bearing devices were handled.
Incorrect Answers
B:Quick formatting usually changes logical metadata rather than every underlying flash cell. It cannot prove that remapped or inaccessible pages holding contracts were overwritten, especially when the controller has already failed. The required irrecoverability cannot be inferred from an OS command returning success.
C:Failure to mount a drive does not mean its flash chips are unrecoverable through specialized examination. General recycling without serialized custody creates an unnecessary disclosure path before destruction is completed. Each drive must remain traceable until evidence shows its media was destroyed under the approved procedure.
E:An inventory and shipment trail helps show where devices were sent, yet shipment is not equivalent to destroying recoverable flash contents. The drives stored unencrypted customer contracts and their controllers cannot execute logical sanitize commands. The organization needs approved physical destruction and proof tying each SSD serial number to the completed destruction process.
Question 231
A litigation hold applies to several contract files. The ordinary records schedule says they should expire this week. What exception to disposal must be applied?
- Preserve the held files and prevent scheduled deletion until legal counsel lifts the hold.
- Publish the contracts publicly as a substitute for retaining them internally.
- Move the contracts to a separate archive location but leave the standard automated deletion schedule active there.
- Delete the files because the general retention clock reached its end.
Explanation
Correct Answer
A:Binding legal preservation overrides routine expiry for the specifically identified records. The legal hold applies to identified records and suspends ordinary expiry until an authorized release. Protect their integrity and access, document the preservation scope, and ensure scheduled deletion rules explicitly exclude held files during the active proceeding.
Incorrect Answers
B:Disclosure is not required to preserve evidence and may introduce confidentiality breaches. Public release of confidential contracts is not a preservation mechanism and could trigger an unrelated privacy or trade-secret breach. The files should remain under authorized custody while still available to legal representatives and auditors.
C:Archiving may reduce accidental editing and can be part of records-management operations, so the proposal sounds like a preservation step. It does not satisfy the legal hold if the moved files still expire on the ordinary schedule this week. A defensible hold needs explicit suspension of disposition for the covered records and controlled release by legal counsel.
D:Ordinary expiry cannot override an active, communicated duty to preserve evidence. Normal retention expiry governs records not subject to a continuing preservation duty. Deleting the identified files while a litigation hold is active could destroy required evidence even if the original retention date has passed.
Question 232
An old router has been physically disconnected, but its configuration exports still contain active VPN credentials and shared management secrets. Which retirement step closes residual access risk?
- Invalidate retired router credentials and document how its configuration copies were sanitized or protected.
- Change the router's physical shelf location and call it decommissioned.
- Keep every active tunnel key forever to simplify emergency restoration.
- Remove the router from monitoring while preserving its passwords unchanged.
Explanation
Correct Answer
A:Secrets may remain usable against other systems even after the original appliance is powered off. A powered-off router cannot initiate new sessions, but credentials in its configuration exports may still authenticate to other devices or shared services. Revoke or rotate those secrets and protect or sanitize archived exports under a documented decommissioning decision.
Incorrect Answers
B:Location alone does not remove cryptographic credentials or access authorizations. Moving equipment changes physical custody but cannot invalidate VPN keys copied from its configuration. Attackers obtaining that export could use the credentials elsewhere without ever switching the retired router on.
C:Retired credentials can continue granting unauthorized network access if an archive is exposed. Preserving retired tunnel keys indefinitely retains an unnecessary authorization path into surviving infrastructure. Store only justified forensic records with appropriately redacted secrets, and replace shared keys before the appliance leaves service.
D:Visibility changes do not invalidate leaked keys stored in backups. Removing a device from monitoring lowers visibility without preventing credentials stored in backup exports from being reused. Decommissioning is complete only after relevant trust relationships, accounts and keys are invalidated or safely transferred.
Question 233
Network discovery identifies five running devices with no registered owners, change tickets or approved VLAN placement. Which asset-management response should precede unconditional trust?
- Quarantine unknown devices until their owner and authorization are verified and recorded.
- Turn off discovery agents so the devices stop appearing as findings.
- Assign the devices automatically to the most privileged production VLAN.
- Trust every discovered device because it is already on the LAN.
Explanation
Correct Answer
A:Unattributed active equipment is a possible unmanaged entry point requiring ownership before broad access. An unknown attached device may be an unmanaged test box, rogue access point or abandoned supplier appliance. Isolate it in a limited network until its procurement, custodian, configuration and permitted access are verified and recorded.
Incorrect Answers
B:Hiding observations does not make unrecorded network devices authorized or secure. Discovery suppression removes the warning but does not disconnect unknown equipment. Without identification or quarantine, it can continue exchanging traffic with internal services while remaining outside patch and asset-management processes.
C:Unknown ownership gives no basis for access to sensitive systems. The most privileged VLAN should require stronger authorization than ordinary access. Assigning unidentified devices there creates direct paths to sensitive systems before anyone has established that the devices belong to the organization.
D:Presence on an internal wire is not proof of approved procurement, configuration or custody. Physical presence on an internal cable can result from unauthorized connection or forgotten hardware. Network location is not an identity claim, and an asset must meet registration and policy checks before it receives normal trust.
Question 234
The monthly vulnerability report includes perimeter routers but omits Kubernetes workloads launched last quarter. Which scanning change addresses the blind spot?
- Declare the whole company secure because router scans passed.
- Disable workload inventory to reduce the number of reported vulnerabilities.
- Add the container and orchestration assets to an approved scan plan with suitable coverage.
- Increase the router scan frequency without inspecting containers.
Explanation
Correct Answer
C:Unscanned new workloads may harbor reachable flaws despite clean results on the older router inventory. Include cluster control planes, worker nodes, container images and reachable services using methods appropriate to their lifecycles. Confirm authenticated or image-based visibility and report coverage gaps separately from actual discovered vulnerabilities.
Incorrect Answers
A:Results for one asset class cannot demonstrate security of omitted containers. Clean router results prove only that the scanned router hosts had no detected findings under the selected tests. Containers launched last quarter are a separate attack surface that remains completely absent from the assessment population.
B:Suppressed discovery hides the actual coverage gap and prevents targeted remediation. Turning off workload inventory creates a false appearance of fewer vulnerabilities by hiding systems, not by fixing flaws. The scan plan must explicitly include discovered ephemeral workloads and their supporting orchestration components.
D:More checks of already covered devices still leave the newly launched workloads unassessed. Scanning the same routers more often may improve their freshness but cannot discover image-layer packages or container runtime settings. New asset classes need their own scope and evidence, not additional repetitions of the original scan.
Question 235
A remote scan reports Linux hosts as healthy, but its scanner account cannot inspect installed packages or privileged configuration files. How should scanning confidence be improved?
- Suppress all access to scan reports until the next annual review.
- Mark the uninspected packages compliant simply because the port list looks normal.
- Perform credentialed scans with narrowly protected service accounts and documented local checks.
- Embed a root password directly in a public scanner script.
Explanation
Correct Answer
C:Authenticated inspection can observe package versions and configuration details invisible to unauthenticated probes. Use a constrained service identity with controlled privileges to inspect installed packages, missing updates and security configurations. Protect the credentials, log their use, and validate that the authenticated scan truly collected the local evidence the uncredentialed result lacked.
Incorrect Answers
A:Delayed reporting leaves the assessment blind spot unresolved without adding local evidence. Delay of report access prevents owners from reacting but does not grant the scanner insight into installed packages. The current 'healthy' result is potentially misleading because privileged configuration and library versions were never inspected.
B:An external port list describes listeners visible from the scanner’s network position, not every installed library or internal configuration on the host. The packages at issue have not been examined, so even a small attack surface cannot establish their versions or whether a dangerous local dependency remains. Confirm compliance from inventory, package evidence and targeted checks, rather than inferring it from ports.
D:Exposed powerful credentials create another security risk rather than a controlled scan identity. A root secret embedded in a public script is a transferable privileged credential that any reader can misuse. Credible authenticated scanning requires secret storage, rotation and minimum necessary read access rather than insecure shortcuts.
Question 236
A scanner marks a library as vulnerable even though the host's signed package inventory shows a different nonaffected release. What review should precede a confirmed finding?
- Lower severity scores without investigating which package actually exists.
- Inspect the package evidence and reproduce the indicator under controlled conditions.
- Dismiss the finding based solely on the signed package manifest, without checking the loaded component or recreating the scanner condition.
- Reinstall the whole operating system on every scanner warning without confirmation.
Explanation
Correct Answer
B:Version and observed behavior checks can distinguish a mistaken signature match from an exploitable installed dependency. Compare installed package names, backported security fixes and release provenance against the scanner signature; where safe, reproduce the identifying condition in a controlled environment. Distinguish package-version string ambiguity from genuine vulnerable code before finalizing the finding.
Incorrect Answers
A:Cosmetic scoring changes do not determine whether the component is installed or vulnerable. Lowering the severity label changes prioritization without verifying whether the flagged library is present. The correct next step is to reconcile the scanner's identifier with the signed package evidence and actual vulnerable behavior.
C:A signed inventory is credible evidence that may identify a false positive caused by an incorrect version match. It does not by itself prove that the running service lacks a separately loaded copy or an affected reachable path. The review needs controlled reproduction and effective runtime/package verification before the result is confidently closed.
D:Unnecessary destructive remediation can cause outages for false positives. Reinstalling an operating system is disruptive and may not even remove a true vulnerability if the same affected package returns. Evidence-based triage should precede remediation to avoid operational damage from a false alert.
Question 237
Two vulnerabilities both carry a high scanner score, but one affects an exposed payroll service and the other an isolated lab VM. Which prioritization is sound?
- Prioritize by real exploitability and business consequence, not scanner score alone.
- Apply payroll-service firewall hardening only, without determining whether the vulnerable application remains exposed through allowed paths.
- Order remediation solely by the two scanner severity scores and apply the same deadline to both assets without checking their network exposure.
- Patch the isolated lab VM first because it is easier to schedule, leaving the exposed payroll finding untriaged.
Explanation
Correct Answer
A:A reachable payroll weakness can cause greater practical harm than a similar score on an isolated disposable lab host. Business risk depends on reachable exploit paths, privilege obtained, data at stake and likely attacker behavior. The public-facing payroll system may need urgent attention even if an isolated disposable lab VM has an identical scanner number.
Incorrect Answers
B:Reducing network reachability around an exposed payroll service can mitigate exploitation if the firewall actually blocks the vulnerable entry point. The question asks how to prioritize two findings, not how to implement an isolated compensating control. A blanket firewall change without testing actual exposure, exploitation likelihood and business consequence does not establish a defensible relative remediation priority.
C:The vulnerability score gives a useful technical starting point, but the two equally scored cases have different operational risk. A payroll service reachable from untrusted networks presents more immediate business exposure than an isolated lab VM. Risk-based prioritization needs exploitability, system exposure and business impact rather than identical deadlines based only on the score.
D:Quickly closing a lab finding can improve a scanner dashboard and may be operationally convenient. But remediation order should account for reachable attack paths and payroll business impact, not simply the easiest available window. If the payroll finding is exploitable from the internet, deferring its triage for a low-exposure VM can preserve the higher consequential risk.
Question 238
A water utility must assess legacy PLC firmware for known security weaknesses. The plant has recorded controller resets after active network probes, and pumping cannot be interrupted. The OT owner prohibits intrusive scanning on running controllers. What assessment approach provides actionable vulnerability evidence while respecting that restriction?
- Run a low-rate credentialed vulnerability scanner directly against every production PLC, assuming throttling makes active queries harmless.
- Defer all vulnerability discovery until the next full replacement cycle because production probing is prohibited.
- Identify models and firmware passively, match verified vendor advisories, qualify intrusive tests on representative offline equipment, and seek OT approval before any production testing window.
- Use the perimeter firewall connection log as proof that installed PLC firmware has no known vulnerabilities, without identifying its release.
Explanation
Correct Answer
C:Passive asset identification and vendor advisory matching can reveal likely vulnerable firmware without injecting test traffic into safety-sensitive control paths. Trials against a representative offline PLC establish what scans do before approval for a controlled maintenance window. This produces risk evidence while respecting the owner’s explicit continuity restriction; it does not claim passive data proves every vulnerability absent.
Incorrect Answers
A:A throttled scanner can still send unexpected protocol requests or malformed sequences to an old PLC. The plant has actual evidence of controller resets, so a low packet rate is not a safety guarantee. Test the scanner against representative hardware under nonproduction conditions and obtain OT-owner approval before any controlled live use.
B:A prohibition on intrusive production probes does not eliminate passive observation, firmware inventory or comparisons with published vendor advisories. Deferring every assessment would leave known exposure unidentified for years. The utility can collect model and software evidence now while planning a safe, authorized evaluation of techniques that could affect pump control.
D:Firewall logs show which network sessions traversed a boundary and may help assess reachability, but they do not disclose every embedded firmware release or prove a vendor patch is installed. A controller can have a known vulnerability while sending ordinary control traffic. Version-aware inventory and vendor advisories are needed in addition to traffic observations.
Question 239
An industrial mixer controller has an exploitable management service and cannot be rebooted until a certified maintenance procedure exists. Production engineering cannot yet authorize a patch outage. Which interim technical measure best reduces the reachable attack surface without interrupting the process-control traffic it needs?
- Permit only explicitly required process-control flows to the controller, block unneeded management ingress at the industrial boundary, and test that approved control messages still pass.
- Reboot the controller on the ordinary office workstation patch schedule regardless of plant safety conditions.
- Leave all management paths reachable because a vulnerability record has been created in the risk register.
- Disable plant process monitoring while keeping the vulnerable service reachable to every contractor network.
Explanation
Correct Answer
A:The vulnerable management service does not need to be reachable from every network for the mixer to continue its defined control exchanges. Restrict management ingress by source and protocol, preserve the explicitly required industrial flows, and test both denial and control-system continuity with plant operators. Track the residual issue until an approved patch becomes feasible.
Incorrect Answers
B:A desktop patch cadence ignores process safety and the controller’s certified downtime requirements. Restarting during production could interrupt a critical mixing sequence. The situation calls for an interim exposure reduction that does not require an unapproved outage, not a faster reboot window.
C:A risk-register entry improves accountability but does not change packets reaching the insecure management listener. Attackers would retain the same network route and exploit surface. The mitigation must be enforced at the network boundary and verified against actual controller traffic.
D:Turning off monitoring would reduce the plant team’s visibility of both safety events and suspicious management attempts. It does not prevent adversaries from using the vulnerable service. Safe interim containment must narrow ingress while preserving authorized telemetry and operational communication.
Question 240
A payment gateway must keep an older administrative listener temporarily because a supported patch cannot be installed until its next certified change window. An attacker has been probing the listener from untrusted networks, and even authorized support hosts may be compromised. Which TWO complementary protections directly reduce the listener’s exposure until the patch? Choose TWO.
- Restrict the listener to explicitly authorized jump-host source paths and verify that public and contractor segments cannot establish sessions.
- Mark the vulnerability resolved immediately once the temporary network rule has been written in a change ticket.
- Expose the management listener broadly to vendor networks to simplify troubleshooting while the patch is delayed.
- Disable connection and security logs to reduce noise from blocked connection attempts.
- Deploy and test a protocol-aware intrusion-prevention rule for the known exploit pattern on traffic permitted from the approved support path, with monitoring for rule bypass.
Explanation
Correct Answers
A:Source restrictions reduce who can connect to the vulnerable listener and should be tested from both trusted and untrusted segments. This removes broad unsolicited access but does not eliminate risk from a compromised authorized jump host, so it is only one part of the stated interim protection.
E:Inspection on the remaining approved support path addresses the weakness that segmentation alone leaves: a malicious payload can originate from a compromised trusted host. A tested IPS signature or equivalent validated detection-and-block rule adds exploit-specific enforcement while the permanent patch is pending.
Incorrect Answers
B:A ticket or configuration request documents intent, not the absence of the exploitable service. The gateway remains vulnerable until the patch is deployed and technically verified. Closing the record would conceal residual exposure rather than enforce a working compensating control.
C:Allowing every vendor network to reach the administrative service broadens the attacker’s possible entry points, especially if a partner endpoint is compromised. The temporary condition calls for least-privilege management reachability while operational access is maintained through designated paths.
D:Suppressing connection logs removes evidence of ongoing probes and would make it harder to tell whether a compensating rule is being bypassed. The gateway needs active visibility and restrictive enforcement while its code remains unpatched, not reduced security telemetry.
CompTIA Security+ (SY0-701) Practice Tests