Question 290
A two-controller array arrives for a rack with only one power distribution unit and marginal cooling headroom. The integration committee must approve a coherent, supportable implementation rather than unrelated quick fixes. Which 2 recommendations are defensible for the stated requirements? Choose TWO.
- Disable TLS validation when a device enrollment fails due to certificate trust
- Expose the administrative console to user desktop networks to improve access
- Record complete power, cable and component-readiness evidence before setup
- Provide independent supported power feeds and confirm thermal capacity before installation
- Use identical shared superuser credentials across all automation integrations
Explanation
Correct Answers
C:A successful boot may hide invalid resilience or cooling design.
D:Two power supplies on one PDU share a single failure domain.
Incorrect Answers
A:The correct response is to repair trust, naming or time, not remove authentication.
B:Broader management reachability raises credential and privileged control risk.
E:Shared privileges prevent least-privilege scoping and reliable audit attribution.
Question 291
A new Fibre Channel SAN has two fabrics, but both array ports are patched to the same switch. The architect is reviewing host presentation, path safety, and access boundaries. Which technical conclusion should be recorded?
- Repatch target ports to two independent documented FC fabrics
- Treat two cables to one switch as independent SAN fabrics
- Skip I/O failover tests because both target ports appear in inventory
- Conclude SAN connectivity is correct from a ping to the array management IP
Explanation
Correct Answer
A:Placing both ports on one switch leaves a common switch failure.
Incorrect Answers
B:One switch loss interrupts both cables when they share that fault domain.
C:Enumeration alone cannot show whether host multipathing survives a path outage.
D:FC target login and volume presentation are independent of an IP management GUI.
Question 292
A new Fibre Channel SAN has two fabrics, but both array ports are patched to the same switch. An implementation proposal is being challenged for host presentation, path safety, and access boundaries. Which action is most defensible?
- Confirm each host and array port has correct fabric-specific zoning
- Treat FC switch zoning as a replacement for the storage array's LUN masking
- Change LUN export first without checking whether the initiator has fabric login
- Treat a green switch port LED as proof of authorized host-to-volume access
Explanation
Correct Answer
A:Redundancy requires separate reachable initiator-target paths.
Incorrect Answers
B:Zoning controls fabric reachability; masking controls which volumes initiators may see.
C:A host not logged into the fabric cannot reach a target regardless of masking changes.
D:A physical link does not establish fabric name-server visibility or LUN export.
Question 293
A new Fibre Channel SAN has two fabrics, but both array ports are patched to the same switch. An operations engineer must address host presentation, path safety, and access boundaries without introducing a new risk. Which decision fits this environment?
- Open a broad all-initiators zone to fix one missing host target
- Avoid expanding all-zones membership to work around the missing second fabric
- Assume a WWPN remains unchanged after replacing a Fibre Channel HBA
- Treat FC switch zoning as a replacement for the storage array's LUN masking
Explanation
Correct Answer
B:Broad zoning increases exposure without solving the physical single point of failure.
Incorrect Answers
A:This expands visibility and can expose unrelated host-to-storage paths unnecessarily.
C:A replacement adapter normally has a different identity that may need zone updates.
D:Zoning controls fabric reachability; masking controls which volumes initiators may see.
Question 294
A new Fibre Channel SAN has two fabrics, but both array ports are patched to the same switch. Before sign-off, the team must collect acceptance evidence relating to application-facing performance and bottleneck evidence. Which approach is justified?
- Treat a green switch port LED as proof of authorized host-to-volume access
- Treat two cables to one switch as independent SAN fabrics
- Take down both SAN fabrics simultaneously to investigate a degraded path
- Lose one switch deliberately and confirm surviving application storage I/O
Explanation
Correct Answer
D:Counting two cables does not establish independent fabric survival.
Incorrect Answers
A:A physical link does not establish fabric name-server visibility or LUN export.
B:One switch loss interrupts both cables when they share that fault domain.
C:This removes the remaining production path and can interrupt all application I/O.
Question 295
A new Fibre Channel SAN has two fabrics, but both array ports are patched to the same switch. The integration committee must approve a coherent, supportable implementation rather than unrelated quick fixes. Which 3 recommendations are defensible for the stated requirements? Choose THREE.
- Avoid expanding all-zones membership to work around the missing second fabric
- Treat two cables to one switch as independent SAN fabrics
- Count configured paths as healthy without checking link and target states
- Lose one switch deliberately and confirm surviving application storage I/O
- Repatch target ports to two independent documented FC fabrics
- Skip I/O failover tests because both target ports appear in inventory
Explanation
Correct Answers
A:Broad zoning increases exposure without solving the physical single point of failure.
D:Counting two cables does not establish independent fabric survival.
E:Placing both ports on one switch leaves a common switch failure.
Incorrect Answers
B:One switch loss interrupts both cables when they share that fault domain.
C:Offline paths contribute no actual resilience during a component failure.
F:Enumeration alone cannot show whether host multipathing survives a path outage.
Question 296
An HBA was replaced and a previously working host cannot log in to a zoned Fibre Channel fabric. The architect is reviewing host presentation, path safety, and access boundaries. Which technical conclusion should be recorded?
- Update the zone member for the HBA's replacement WWPN
- Assume a working host proves every other cluster member sees the identical device
- Assume a WWPN remains unchanged after replacing a Fibre Channel HBA
- Change LUN export first without checking whether the initiator has fabric login
Explanation
Correct Answer
A:FC access policy may still reference the removed adapter's initiator identity.
Incorrect Answers
B:Host-set mappings, WWIDs and paths can differ across cluster nodes.
C:A replacement adapter normally has a different identity that may need zone updates.
D:A host not logged into the fabric cannot reach a target regardless of masking changes.
Question 297
An HBA was replaced and a previously working host cannot log in to a zoned Fibre Channel fabric. An implementation proposal is being challenged for host presentation, path safety, and access boundaries. Which action is most defensible?
- Assume a WWPN remains unchanged after replacing a Fibre Channel HBA
- Treat FC switch zoning as a replacement for the storage array's LUN masking
- Treat a green switch port LED as proof of authorized host-to-volume access
- Verify name-server visibility and switch login before changing LUN masking
Explanation
Correct Answer
D:The failure can occur before host-to-volume presentation is evaluated.
Incorrect Answers
A:A replacement adapter normally has a different identity that may need zone updates.
B:Zoning controls fabric reachability; masking controls which volumes initiators may see.
C:A physical link does not establish fabric name-server visibility or LUN export.
Question 298
An HBA was replaced and a previously working host cannot log in to a zoned Fibre Channel fabric. An operations engineer must address host presentation, path safety, and access boundaries without introducing a new risk. Which decision fits this environment?
- Open a broad all-initiators zone to fix one missing host target
- Reapply the intended narrow initiator-target zoning rather than universal access
- Assume a WWPN remains unchanged after replacing a Fibre Channel HBA
- Present a shared cluster volume with inconsistent LUN identity to each member
Explanation
Correct Answer
B:An open zone is an unsafe workaround for a stale WWPN entry.
Incorrect Answers
A:This expands visibility and can expose unrelated host-to-storage paths unnecessarily.
C:A replacement adapter normally has a different identity that may need zone updates.
D:Cluster hosts need consistent access and device identity for safe shared storage.
Question 299
An HBA was replaced and a previously working host cannot log in to a zoned Fibre Channel fabric. Before sign-off, the team must collect acceptance evidence relating to fabric and host storage identity. Which approach is justified?
- Rescan and verify all approved paths after the replacement
- Change LUN export first without checking whether the initiator has fabric login
- Disregard supported multipath policy and force all controller paths to equal priority
- Treat a green switch port LED as proof of authorized host-to-volume access
Explanation
Correct Answer
A:Correcting one port's membership does not establish redundant operation.
Incorrect Answers
B:A host not logged into the fabric cannot reach a target regardless of masking changes.
C:Optimized and nonoptimized paths may have different recommended traffic handling.
D:A physical link does not establish fabric name-server visibility or LUN export.
Question 300
An HBA was replaced and a previously working host cannot log in to a zoned Fibre Channel fabric. The integration committee must approve a coherent, supportable implementation rather than unrelated quick fixes. Which 2 recommendations are defensible for the stated requirements? Choose TWO.
- Assume a WWPN remains unchanged after replacing a Fibre Channel HBA
- Update the zone member for the HBA's replacement WWPN
- Assume a working host proves every other cluster member sees the identical device
- Reapply the intended narrow initiator-target zoning rather than universal access
- Treat FC switch zoning as a replacement for the storage array's LUN masking
Explanation
Correct Answers
B:FC access policy may still reference the removed adapter's initiator identity.
D:An open zone is an unsafe workaround for a stale WWPN entry.
Incorrect Answers
A:A replacement adapter normally has a different identity that may need zone updates.
C:Host-set mappings, WWIDs and paths can differ across cluster nodes.
E:Zoning controls fabric reachability; masking controls which volumes initiators may see.
HPE Storage Integrator Solutions (HPE0-J83) Practice Tests