Question 440
A service has strict short-term rollback needs but cannot retain hourly snapshots indefinitely on primary storage. The integration committee must approve a coherent, supportable implementation rather than unrelated quick fixes. Which 2 recommendations are defensible for the stated requirements? Choose TWO.
- Restore representative points and alert on skipped or unsuccessful snapshot jobs
- Keep independent longer-term backup copies outside the local array failure domain
- Deploy recovery copies without a tested ability for authorized staff to access them
- Assume an off-site replica provides earlier historical versions after every corrupting write
- Keep all recovery copies on the same array and account as production
Explanation
Correct Answers
A:Scheduled copy creation is weaker proof than an actually usable restore.
B:Local rollback and disaster recovery address different events.
Incorrect Answers
C:Air-gap or isolation is useful only if approved recovery can reach the protected data.
D:A continuously updated replica may mirror the corruption into the remote data set.
E:One compromise or enclosure loss may destroy both source and rollback data.
Question 441
A remote replica is current yet the application team's failover exercise has never successfully served a user request. The architect is reviewing recovery and retained-data integrity. Which technical conclusion should be recorded?
- Test the recovered application, not only the remote replica byte stream
- Use a connected replication session as proof the latest copy can boot the database
- Plan cutover solely from byte-copy completion while ignoring application dependencies
- Assume an online replica always contains a recovery point within the required RPO
Explanation
Correct Answer
A:A synchronized LUN may still lack working infrastructure dependencies.
Incorrect Answers
B:The replica may be inconsistent across dependent volumes or logs.
C:Identity, DNS, logs and middleware may still prevent usable recovered services.
D:A peer can be connected yet lag far behind current committed data.
Question 442
A remote replica is current yet the application team's failover exercise has never successfully served a user request. An implementation proposal is being challenged for recovery and retained-data integrity. Which action is most defensible?
- Assume an RPO value alone defines the allowed application downtime
- Call an RTO successful when disk volumes are online but users cannot log in
- Plan cutover solely from byte-copy completion while ignoring application dependencies
- Restore identity, network, database and middleware in documented dependency order
Explanation
Correct Answer
D:Services must be started in a coherent sequence to serve real users.
Incorrect Answers
A:Recovery point limits data age, whereas recovery time limits service restoration delay.
B:Recovery time ends when the agreed business function returns, not just when LUNs mount.
C:Identity, DNS, logs and middleware may still prevent usable recovered services.
Question 443
A remote replica is current yet the application team's failover exercise has never successfully served a user request. An operations engineer must address recovery and retained-data integrity without introducing a new risk. Which decision fits this environment?
- Assume an online replica always contains a recovery point within the required RPO
- Assume an RPO value alone defines the allowed application downtime
- Suppress lag alarms while the replication queue drains after a busy period
- Measure last committed recovery point and elapsed functional service return
Explanation
Correct Answer
D:Both RPO and RTO are end-to-end properties, not just data-copy statistics.
Incorrect Answers
A:A peer can be connected yet lag far behind current committed data.
B:Recovery point limits data age, whereas recovery time limits service restoration delay.
C:Data-loss exposure exists until an acceptable committed recovery point is available.
Question 444
A remote replica is current yet the application team's failover exercise has never successfully served a user request. Before sign-off, the team must collect acceptance evidence relating to multi-site data safety. Which approach is justified?
- Record failure and rollback actions in a repeatable rehearsal log
- Reverse-copy the stale primary over the active failover site without checking lineage
- Test only a clean administrative switchover and omit site-partition fencing
- Assume site-to-site distance has no effect on synchronous write response time
Explanation
Correct Answer
A:Uncaptured assumptions can cause the same recovery failure in production.
Incorrect Answers
B:This can overwrite newer authoritative writes from the promoted secondary.
C:Graceful tests do not exercise split-brain risk during unplanned connectivity loss.
D:Remote acknowledgment requires transport latency that contributes to foreground I/O.
Question 445
A remote replica is current yet the application team's failover exercise has never successfully served a user request. The integration committee must approve a coherent, supportable implementation rather than unrelated quick fixes. Which 2 recommendations are defensible for the stated requirements? Choose TWO.
- Measure last committed recovery point and elapsed functional service return
- Plan cutover solely from byte-copy completion while ignoring application dependencies
- Optimize primary latency by suspending replication without reassessing data-loss tolerance
- Test only a clean administrative switchover and omit site-partition fencing
- Test the recovered application, not only the remote replica byte stream
Explanation
Correct Answers
A:Both RPO and RTO are end-to-end properties, not just data-copy statistics.
E:A synchronized LUN may still lack working infrastructure dependencies.
Incorrect Answers
B:Identity, DNS, logs and middleware may still prevent usable recovered services.
C:Paused copies may breach the agreed RPO and weaken disaster readiness.
D:Graceful tests do not exercise split-brain risk during unplanned connectivity loss.
Question 446
After an outage, the secondary becomes active while original primary storage comes back with stale data. The architect is reviewing multi-site data safety. Which technical conclusion should be recorded?
- Reverse-copy the stale primary over the active failover site without checking lineage
- Assume site-to-site distance has no effect on synchronous write response time
- Leave old primary writable while performing failback resynchronization
- Identify the secondary as the authoritative writer after its valid promotion
Explanation
Correct Answer
D:The recovered old primary contains stale commits until properly synchronized.
Incorrect Answers
A:This can overwrite newer authoritative writes from the promoted secondary.
B:Remote acknowledgment requires transport latency that contributes to foreground I/O.
C:Two write authorities can diverge and invalidate a clean reverse-copy operation.
Question 447
After an outage, the secondary becomes active while original primary storage comes back with stale data. An implementation proposal is being challenged for multi-site data safety. Which action is most defensible?
- Leave old primary writable while performing failback resynchronization
- Fence the old primary from serving writes during reverse replication
- Permit both isolated sites to serve independent writes after losing quorum communication
- Reverse-copy the stale primary over the active failover site without checking lineage
Explanation
Correct Answer
B:Two writable sites can produce divergent updates while data is resynced.
Incorrect Answers
A:Two write authorities can diverge and invalidate a clean reverse-copy operation.
C:Concurrent active writers risk irreconcilable split-brain histories.
D:This can overwrite newer authoritative writes from the promoted secondary.
Question 448
After an outage, the secondary becomes active while original primary storage comes back with stale data. An operations engineer must address recovery and retained-data integrity without introducing a new risk. Which decision fits this environment?
- Plan cutover solely from byte-copy completion while ignoring application dependencies
- Reverse-copy the stale primary over the active failover site without checking lineage
- Optimize primary latency by suspending replication without reassessing data-loss tolerance
- Plan reverse-copy, consistency checks and controlled traffic cutback
Explanation
Correct Answer
D:Failback is a coordinated data authority change, not a DNS-only switch.
Incorrect Answers
A:Identity, DNS, logs and middleware may still prevent usable recovered services.
B:This can overwrite newer authoritative writes from the promoted secondary.
C:Paused copies may breach the agreed RPO and weaken disaster readiness.
Question 449
After an outage, the secondary becomes active while original primary storage comes back with stale data. Before sign-off, the team must collect acceptance evidence relating to recovery and retained-data integrity. Which approach is justified?
- Ignore bandwidth contention because daily average changed data fits the WAN
- Validate transaction consistency and restored RPO alerting after returning service
- Assume an online replica always contains a recovery point within the required RPO
- Assume an RPO value alone defines the allowed application downtime
Explanation
Correct Answer
B:A green replication status is insufficient without application correctness.
Incorrect Answers
A:Peak change bursts can exceed available transport and age the restore point.
C:A peer can be connected yet lag far behind current committed data.
D:Recovery point limits data age, whereas recovery time limits service restoration delay.
Question 450
After an outage, the secondary becomes active while original primary storage comes back with stale data. The integration committee must approve a coherent, supportable implementation rather than unrelated quick fixes. Which 2 recommendations are defensible for the stated requirements? Choose TWO.
- Test only a clean administrative switchover and omit site-partition fencing
- Suppress lag alarms while the replication queue drains after a busy period
- Fence the old primary from serving writes during reverse replication
- Reverse-copy the stale primary over the active failover site without checking lineage
- Validate transaction consistency and restored RPO alerting after returning service
Explanation
Correct Answers
C:Two writable sites can produce divergent updates while data is resynced.
E:A green replication status is insufficient without application correctness.
Incorrect Answers
A:Graceful tests do not exercise split-brain risk during unplanned connectivity loss.
B:Data-loss exposure exists until an acceptable committed recovery point is available.
D:This can overwrite newer authoritative writes from the promoted secondary.