Question 190
After a corrective decision on Team-delivery-versus-sponsor-benefits, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Check for a jointly recorded estimating basis and a professional working agreement after the conversation. Retain the initiating evidence for audit.
- Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit.
- Holding a developer solely accountable for corporate investment authorization confuses team and sponsor responsibilities.
- Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline.
Explanation
Correct Answer
D:This checks the actual mechanism rather than merely declaring success: Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline. The desired observed result is Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence. [R158 R158-Q0190; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
Incorrect Answers
A:The proposed verify (Check for a jointly recorded estimating basis and a professional working agreement after the conversation. Retain the initiating evidence for audit.) comes from a different Project roles and responsibilities situation: Two analysts disagree about effort estimates; a manager publicly labels one as incompetent and the conflict intensifies. It does not resolve or independently test the stated issue: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. Here, the relevant check is Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline. [R158 R158-Q0190; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
B:The proposed verify (Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit.) comes from a different Project roles and responsibilities situation: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. It does not resolve or independently test the stated issue: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. Here, the relevant check is Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline. [R158 R158-Q0190; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
C:This is a tempting but unsupported shortcut in this case: Holding a developer solely accountable for corporate investment authorization confuses team and sponsor responsibilities. It does not show that Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence. [R158 R158-Q0190; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
Question 191
Which statement most accurately flags a misleading shortcut to avoid in this Team-delivery-versus-sponsor-benefits case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review.
- Holding a developer solely accountable for corporate investment authorization confuses team and sponsor responsibilities.
- Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline.
- Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence.
Explanation
Correct Answer
B:The shortcut is mistaken: Holding a developer solely accountable for corporate investment authorization confuses team and sponsor responsibilities. The appropriate response is to assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:This is a supported decision, not the unsupported claim: Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment.
C:This is an appropriate independent test of the proposed decision: Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.
D:This is a relevant outcome to seek after the decision: Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence. It is not an unsupported assumption.
Question 192
Select THREE consistent elements of the Team-delivery-versus-sponsor-benefits case: appropriate decision, verification, and observable success condition. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence.
- Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review.
- Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline.
- Budget changes have legitimate sponsorship and the PM coordinates within delegated authority. The decision can be traced to the review evidence.
- Holding a developer solely accountable for corporate investment authorization confuses team and sponsor responsibilities.
- Use self-regulation, empathy and private constructive discussion to understand assumptions and reconcile the estimates. Record the rationale before the next commitment.
Explanation
Correct Answer
A:The stated result demonstrates the case acceptance condition: Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence. It depends on the decision Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review.
B:The case evidence identifies A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. The specified decision directly addresses it: Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review. This can be checked using Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline. [R158 R158-Q0192; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
C:This checks the actual mechanism rather than merely declaring success: Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline. The desired observed result is Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence. [R158 R158-Q0192; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
Incorrect Answers
D:This option concerns a different Project roles and responsibilities situation: A sponsor expects the project manager to approve a funding increase outside the manager's delegated authority. For the reported case, use this verification: Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline.
E:This is a tempting but unsupported shortcut in this case: Holding a developer solely accountable for corporate investment authorization confuses team and sponsor responsibilities. It does not show that Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence. [R158 R158-Q0192; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
F:The proposed action (Use self-regulation, empathy and private constructive discussion to understand assumptions and reconcile the estimates. Record the rationale before the next commitment.) comes from a different Project roles and responsibilities situation: Two analysts disagree about effort estimates; a manager publicly labels one as incompetent and the conflict intensifies. It does not resolve or independently test the stated issue: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. Here, the relevant check is Review accountability mapping for delivery acceptance and benefit sponsorship. Reconcile the result with the current approved decision baseline. [R158 R158-Q0192; case R158-C048; CAPM domain 1, task 1.3; source ECO.]
Question 193
Which project-management decision best addresses the Servant-facilitation situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Negotiate feasible allocation and priorities with the functional manager and escalate unresolved trade-offs appropriately. Record the rationale before the next commitment.
- Using positional authority to silence dissent is not a substitute for facilitation.
- Use self-regulation, empathy and private constructive discussion to understand assumptions and reconcile the estimates. Document impacted stakeholders and the decision owner at the review.
- Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment.
Explanation
Correct Answer
D:The case evidence identifies A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. The specified decision directly addresses it: Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment. This can be checked using Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. [R158 R158-Q0193; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
Incorrect Answers
A:The proposed action (Negotiate feasible allocation and priorities with the functional manager and escalate unresolved trade-offs appropriately. Record the rationale before the next commitment.) comes from a different Project roles and responsibilities situation: A specialist resource is required for deployment, but the functional manager has competing operational commitments. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. [R158 R158-Q0193; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
B:This is a tempting but unsupported shortcut in this case: Using positional authority to silence dissent is not a substitute for facilitation. It does not show that The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls. [R158 R158-Q0193; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
C:This option concerns a different Project roles and responsibilities situation: Two analysts disagree about effort estimates; a manager publicly labels one as incompetent and the conflict intensifies. For the reported case, use this verification: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit.
Question 194
After a corrective decision on Servant-facilitation, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Review the confirmed allocation, dependency dates and resource commitments from both managers. Retain the initiating evidence for audit.
- Using positional authority to silence dissent is not a substitute for facilitation.
- Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit.
- Inspect charter authority limits and approval signatures for the requested funding change. Reconcile the result with the current approved decision baseline.
Explanation
Correct Answer
C:This checks the actual mechanism rather than merely declaring success: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. The desired observed result is The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls. [R158 R158-Q0194; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
Incorrect Answers
A:The proposed verify (Review the confirmed allocation, dependency dates and resource commitments from both managers. Retain the initiating evidence for audit.) comes from a different Project roles and responsibilities situation: A specialist resource is required for deployment, but the functional manager has competing operational commitments. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. [R158 R158-Q0194; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
B:This is a tempting but unsupported shortcut in this case: Using positional authority to silence dissent is not a substitute for facilitation. It does not show that The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls. [R158 R158-Q0194; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
D:The proposed verify (Inspect charter authority limits and approval signatures for the requested funding change. Reconcile the result with the current approved decision baseline.) comes from a different Project roles and responsibilities situation: A sponsor expects the project manager to approve a funding increase outside the manager's delegated authority. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. [R158 R158-Q0194; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
Question 195
Which statement most accurately flags a misleading shortcut to avoid in this Servant-facilitation case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment.
- Using positional authority to silence dissent is not a substitute for facilitation.
- The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls.
- Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit.
Explanation
Correct Answer
B:The shortcut is mistaken: Using positional authority to silence dissent is not a substitute for facilitation. The appropriate response is to facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment.
Incorrect Answers
A:This is a supported decision, not the unsupported claim: Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment. It responds to the actual project issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution.
C:This is a relevant outcome to seek after the decision: The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls. It is not an unsupported assumption.
D:This is an appropriate independent test of the proposed decision: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. It is not the invalid shortcut.
Question 196
Select THREE consistent elements of the Servant-facilitation case: appropriate decision, verification, and observable success condition. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Record the rationale before the next commitment.
- The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls.
- Using positional authority to silence dissent is not a substitute for facilitation.
- Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit.
- Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment.
- Budget changes have legitimate sponsorship and the PM coordinates within delegated authority. The decision can be traced to the review evidence.
Explanation
Correct Answer
B:The stated result demonstrates the case acceptance condition: The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls. It depends on the decision Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment.
D:This checks the actual mechanism rather than merely declaring success: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. The desired observed result is The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls. [R158 R158-Q0196; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
E:The case evidence identifies A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. The specified decision directly addresses it: Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Record the rationale before the next commitment. This can be checked using Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. [R158 R158-Q0196; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
Incorrect Answers
A:This option concerns a different Project roles and responsibilities situation: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. For the reported case, use this verification: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit.
C:This is a tempting but unsupported shortcut in this case: Using positional authority to silence dissent is not a substitute for facilitation. It does not show that The meeting yields an actionable decision supported by the responsible stakeholders. The result is recorded in the project controls. [R158 R158-Q0196; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
F:The proposed outcome (Budget changes have legitimate sponsorship and the PM coordinates within delegated authority. The decision can be traced to the review evidence.) comes from a different Project roles and responsibilities situation: A sponsor expects the project manager to approve a funding increase outside the manager's delegated authority. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Retain the initiating evidence for audit. [R158 R158-Q0196; case R158-C049; CAPM domain 1, task 1.3; source ECO.]
Question 197
Which project-management decision best addresses the Servant-facilitation situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Document impacted stakeholders and the decision owner at the review.
- Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review.
- Using positional authority to silence dissent is not a substitute for facilitation.
- Negotiate feasible allocation and priorities with the functional manager and escalate unresolved trade-offs appropriately. Document impacted stakeholders and the decision owner at the review.
Explanation
Correct Answer
A:Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Document impacted stakeholders and the decision owner at the review. To verify the specified result, check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline.
Incorrect Answers
B:The proposed action (Assign accountable project delivery work to the team and business sponsorship, strategic backing and benefit decisions to the sponsor. Document impacted stakeholders and the decision owner at the review.) comes from a different Project roles and responsibilities situation: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline. [R158 R158-Q0197; case R158-C050; CAPM domain 1, task 1.3; source ECO.]
C:This is a tempting but unsupported shortcut in this case: Using positional authority to silence dissent is not a substitute for facilitation. It does not show that The meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence. [R158 R158-Q0197; case R158-C050; CAPM domain 1, task 1.3; source ECO.]
D:This option concerns a different Project roles and responsibilities situation: A specialist resource is required for deployment, but the functional manager has competing operational commitments. For the reported case, use this verification: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline.
Question 198
After a corrective decision on Servant-facilitation, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Using positional authority to silence dissent is not a substitute for facilitation.
- Compare escalated issue lead times and team feedback after coaching with the initial baseline. Retain the initiating evidence for audit.
- Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline.
- Check for a jointly recorded estimating basis and a professional working agreement after the conversation. Retain the initiating evidence for audit.
Explanation
Correct Answer
C:Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline. The expected result is the meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence.
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: Using positional authority to silence dissent is not a substitute for facilitation. It does not show that The meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence. [R158 R158-Q0198; case R158-C050; CAPM domain 1, task 1.3; source ECO.]
B:This option concerns a different Project roles and responsibilities situation: A cross-functional team meets every reporting requirement but avoids raising emerging design problems because members fear blame. For the reported case, use this verification: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline.
D:The proposed verify (Check for a jointly recorded estimating basis and a professional working agreement after the conversation. Retain the initiating evidence for audit.) comes from a different Project roles and responsibilities situation: Two analysts disagree about effort estimates; a manager publicly labels one as incompetent and the conflict intensifies. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline. [R158 R158-Q0198; case R158-C050; CAPM domain 1, task 1.3; source ECO.]
Question 199
Which statement most accurately flags a misleading shortcut to avoid in this Servant-facilitation case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Document impacted stakeholders and the decision owner at the review.
- Using positional authority to silence dissent is not a substitute for facilitation.
- Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline.
- The meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence.
Explanation
Correct Answer
B:The shortcut is mistaken: Using positional authority to silence dissent is not a substitute for facilitation. The appropriate response is to facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:This is a supported decision, not the unsupported claim: Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution.
C:This is an appropriate independent test of the proposed decision: Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.
D:This is a relevant outcome to seek after the decision: The meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence. It is not an unsupported assumption.
Question 200
Which observed result supports acceptance of the Servant-facilitation corrective decision ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Estimates improve without humiliating staff or hiding competing evidence. The decision can be traced to the review evidence.
- Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence.
- Using positional authority to silence dissent is not a substitute for facilitation.
- The meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence.
Explanation
Correct Answer
D:The stated result demonstrates the case acceptance condition: The meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence. It depends on the decision Facilitate evidence-based discussion, actively listen and make decision criteria visible rather than dictate untested requirements. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:The proposed outcome (Estimates improve without humiliating staff or hiding competing evidence. The decision can be traced to the review evidence.) comes from a different Project roles and responsibilities situation: Two analysts disagree about effort estimates; a manager publicly labels one as incompetent and the conflict intensifies. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline. [R158 R158-Q0200; case R158-C050; CAPM domain 1, task 1.3; source ECO.]
B:The proposed outcome (Deliverable ownership and business justification are assigned to the appropriate roles. The decision can be traced to the review evidence.) comes from a different Project roles and responsibilities situation: A technical team can create the approved reporting interface, while the sponsor controls the business case and organizational benefit commitment. It does not resolve or independently test the stated issue: A workshop contains competing user requirements, and the project manager dominates the discussion with a preselected solution. Here, the relevant check is Check that competing stakeholder concerns were recorded and resolved through agreed decision rules. Reconcile the result with the current approved decision baseline. [R158 R158-Q0200; case R158-C050; CAPM domain 1, task 1.3; source ECO.]
C:This is a tempting but unsupported shortcut in this case: Using positional authority to silence dissent is not a substitute for facilitation. It does not show that The meeting yields an actionable decision supported by the responsible stakeholders. The decision can be traced to the review evidence. [R158 R158-Q0200; case R158-C050; CAPM domain 1, task 1.3; source ECO.]