PMI CAPM Exam Dumps, Practice Test Questions

100% Latest & Updated PMI CAPM Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!

PMI CAPM Premium Bundle
$79.97
$59.98

CAPM Premium Bundle

  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates

CAPM Premium Bundle

PMI CAPM Premium Bundle
  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates
$79.97
$59.98

PMI CAPM Practice Test 29

Question 280

Which observed result supports acceptance of the Effective-meeting-outcomes corrective decision ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Using attendee count as the sole indicator of meeting effectiveness ignores the needed decisions.
  2. The session produces traceable progress rather than only attendance and elapsed time. The decision can be traced to the review evidence.
  3. Design decisions reflect real segment concerns with appropriate limits on generalization. The result is recorded in the project controls.
  4. The team explores alternatives before converging on a justified approach. The decision can be traced to the review evidence.

Explanation

Correct Answer

B:

The stated result demonstrates the case acceptance condition: The session produces traceable progress rather than only attendance and elapsed time. The decision can be traced to the review evidence. It depends on the decision Set a decision-oriented agenda, timebox discussion, capture decisions, action owners and due dates. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Using attendee count as the sole indicator of meeting effectiveness ignores the needed decisions. It does not show that The session produces traceable progress rather than only attendance and elapsed time. The decision can be traced to the review evidence. [R158 R158-Q0280; case R158-C070; CAPM domain 1, task 1.5; source ECO.]

C:

The proposed outcome (Design decisions reflect real segment concerns with appropriate limits on generalization. The result is recorded in the project controls.) comes from a different Problem-solving tools and techniques situation: A public transit service wants detailed reactions from a targeted rider segment before finalizing kiosk behavior. It does not resolve or independently test the stated issue: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. Here, the relevant check is Review meeting outputs and whether promised follow-ups were completed. Reconcile the result with the current approved decision baseline. [R158 R158-Q0280; case R158-C070; CAPM domain 1, task 1.5; source ECO.]

D:

The proposed outcome (The team explores alternatives before converging on a justified approach. The decision can be traced to the review evidence.) comes from a different Problem-solving tools and techniques situation: A team needs multiple ideas for reducing defects but begins voting before quieter members can contribute. It does not resolve or independently test the stated issue: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. Here, the relevant check is Review meeting outputs and whether promised follow-ups were completed. Reconcile the result with the current approved decision baseline. [R158 R158-Q0280; case R158-C070; CAPM domain 1, task 1.5; source ECO.]

Question 281

Which project-management decision best addresses the Daily-standup-purpose situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Facilitate divergent idea generation first, record options without premature judgment, and evaluate them using agreed criteria afterward. Record the rationale before the next commitment.
  2. Set a decision-oriented agenda, timebox discussion, capture decisions, action owners and due dates. Document impacted stakeholders and the decision owner at the review.
  3. Extending the standup into a daily performance appraisal discourages surfacing impediments.
  4. Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Record the rationale before the next commitment.

Explanation

Correct Answer

D:

The case evidence identifies An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. The specified decision directly addresses it: Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Record the rationale before the next commitment. This can be checked using Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0281; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

Incorrect Answers

A:

The proposed action (Facilitate divergent idea generation first, record options without premature judgment, and evaluate them using agreed criteria afterward. Record the rationale before the next commitment.) comes from a different Problem-solving tools and techniques situation: A team needs multiple ideas for reducing defects but begins voting before quieter members can contribute. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0281; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

B:

The proposed action (Set a decision-oriented agenda, timebox discussion, capture decisions, action owners and due dates. Document impacted stakeholders and the decision owner at the review.) comes from a different Problem-solving tools and techniques situation: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0281; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

C:

This is a tempting but unsupported shortcut in this case: Extending the standup into a daily performance appraisal discourages surfacing impediments. It does not show that The daily coordination supports delivery and collaboration instead of executive reporting theater. The result is recorded in the project controls. [R158 R158-Q0281; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

Question 282

After a corrective decision on Daily-standup-purpose, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit.
  2. Inspect the idea log and decision criteria for breadth of proposals and rationale for selection. Reconcile the result with the current approved decision baseline.
  3. Extending the standup into a daily performance appraisal discourages surfacing impediments.
  4. Review meeting outputs and whether promised follow-ups were completed. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. The desired observed result is The daily coordination supports delivery and collaboration instead of executive reporting theater. The result is recorded in the project controls. [R158 R158-Q0282; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

Incorrect Answers

B:

The proposed verify (Inspect the idea log and decision criteria for breadth of proposals and rationale for selection. Reconcile the result with the current approved decision baseline.) comes from a different Problem-solving tools and techniques situation: A team needs multiple ideas for reducing defects but begins voting before quieter members can contribute. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0282; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

C:

This is a tempting but unsupported shortcut in this case: Extending the standup into a daily performance appraisal discourages surfacing impediments. It does not show that The daily coordination supports delivery and collaboration instead of executive reporting theater. The result is recorded in the project controls. [R158 R158-Q0282; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

D:

The proposed verify (Review meeting outputs and whether promised follow-ups were completed. Reconcile the result with the current approved decision baseline.) comes from a different Problem-solving tools and techniques situation: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0282; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

Question 283

Which statement most accurately flags a misleading shortcut to avoid in this Daily-standup-purpose case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. The daily coordination supports delivery and collaboration instead of executive reporting theater. The result is recorded in the project controls.
  2. Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Record the rationale before the next commitment.
  3. Extending the standup into a daily performance appraisal discourages surfacing impediments.
  4. Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit.

Explanation

Correct Answer

C:

The shortcut is mistaken: Extending the standup into a daily performance appraisal discourages surfacing impediments. The appropriate response is to refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Record the rationale before the next commitment.

Incorrect Answers

A:

This is a relevant outcome to seek after the decision: The daily coordination supports delivery and collaboration instead of executive reporting theater. The result is recorded in the project controls. It is not an unsupported assumption.

B:

This is a supported decision, not the unsupported claim: Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Record the rationale before the next commitment. It responds to the actual project issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved.

D:

This is an appropriate independent test of the proposed decision: Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. It is not the invalid shortcut.

Question 284

Select TWO case-specific elements of a justified Daily-standup-purpose resolution : the decision and its direct evidence. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit.
  2. Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Record the rationale before the next commitment.
  3. Review meeting outputs and whether promised follow-ups were completed. Reconcile the result with the current approved decision baseline.
  4. Set a decision-oriented agenda, timebox discussion, capture decisions, action owners and due dates. Document impacted stakeholders and the decision owner at the review.
  5. Extending the standup into a daily performance appraisal discourages surfacing impediments.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. The desired observed result is The daily coordination supports delivery and collaboration instead of executive reporting theater. The result is recorded in the project controls. [R158 R158-Q0284; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

B:

The case evidence identifies An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. The specified decision directly addresses it: Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Record the rationale before the next commitment. This can be checked using Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0284; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

Incorrect Answers

C:

The proposed verify (Review meeting outputs and whether promised follow-ups were completed. Reconcile the result with the current approved decision baseline.) comes from a different Problem-solving tools and techniques situation: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0284; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

D:

The proposed action (Set a decision-oriented agenda, timebox discussion, capture decisions, action owners and due dates. Document impacted stakeholders and the decision owner at the review.) comes from a different Problem-solving tools and techniques situation: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Retain the initiating evidence for audit. [R158 R158-Q0284; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

E:

This is a tempting but unsupported shortcut in this case: Extending the standup into a daily performance appraisal discourages surfacing impediments. It does not show that The daily coordination supports delivery and collaboration instead of executive reporting theater. The result is recorded in the project controls. [R158 R158-Q0284; case R158-C071; CAPM domain 1, task 1.5; source SCRUM.]

Question 285

Which project-management decision best addresses the Daily-standup-purpose situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Document impacted stakeholders and the decision owner at the review.
  2. Extending the standup into a daily performance appraisal discourages surfacing impediments.
  3. Set a decision-oriented agenda, timebox discussion, capture decisions, action owners and due dates. Document impacted stakeholders and the decision owner at the review.
  4. Facilitate divergent idea generation first, record options without premature judgment, and evaluate them using agreed criteria afterward. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

A:

The case evidence identifies An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. The specified decision directly addresses it: Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. [R158 R158-Q0285; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

Incorrect Answers

B:

This is a tempting but unsupported shortcut in this case: Extending the standup into a daily performance appraisal discourages surfacing impediments. It does not show that The daily coordination supports delivery and collaboration instead of executive reporting theater. The decision can be traced to the review evidence. [R158 R158-Q0285; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

C:

The proposed action (Set a decision-oriented agenda, timebox discussion, capture decisions, action owners and due dates. Document impacted stakeholders and the decision owner at the review.) comes from a different Problem-solving tools and techniques situation: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. [R158 R158-Q0285; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

D:

The proposed action (Facilitate divergent idea generation first, record options without premature judgment, and evaluate them using agreed criteria afterward. Document impacted stakeholders and the decision owner at the review.) comes from a different Problem-solving tools and techniques situation: A team needs multiple ideas for reducing defects but begins voting before quieter members can contribute. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. [R158 R158-Q0285; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

Question 286

After a corrective decision on Daily-standup-purpose, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline.
  2. Inspect the idea log and decision criteria for breadth of proposals and rationale for selection. Retain the initiating evidence for audit.
  3. Extending the standup into a daily performance appraisal discourages surfacing impediments.
  4. Review meeting outputs and whether promised follow-ups were completed. Retain the initiating evidence for audit.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. The desired observed result is The daily coordination supports delivery and collaboration instead of executive reporting theater. The decision can be traced to the review evidence. [R158 R158-Q0286; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

Incorrect Answers

B:

The proposed verify (Inspect the idea log and decision criteria for breadth of proposals and rationale for selection. Retain the initiating evidence for audit.) comes from a different Problem-solving tools and techniques situation: A team needs multiple ideas for reducing defects but begins voting before quieter members can contribute. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. [R158 R158-Q0286; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

C:

This is a tempting but unsupported shortcut in this case: Extending the standup into a daily performance appraisal discourages surfacing impediments. It does not show that The daily coordination supports delivery and collaboration instead of executive reporting theater. The decision can be traced to the review evidence. [R158 R158-Q0286; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

D:

The proposed verify (Review meeting outputs and whether promised follow-ups were completed. Retain the initiating evidence for audit.) comes from a different Problem-solving tools and techniques situation: A requirements meeting runs for two hours but produces no decisions, actions or responsible owners. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. [R158 R158-Q0286; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

Question 287

Which statement most accurately flags a misleading shortcut to avoid in this Daily-standup-purpose case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Document impacted stakeholders and the decision owner at the review.
  2. The daily coordination supports delivery and collaboration instead of executive reporting theater. The decision can be traced to the review evidence.
  3. Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline.
  4. Extending the standup into a daily performance appraisal discourages surfacing impediments.

Explanation

Correct Answer

D:

The shortcut is mistaken: Extending the standup into a daily performance appraisal discourages surfacing impediments. The appropriate response is to refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a supported decision, not the unsupported claim: Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved.

B:

This is a relevant outcome to seek after the decision: The daily coordination supports delivery and collaboration instead of executive reporting theater. The decision can be traced to the review evidence. It is not an unsupported assumption.

C:

This is an appropriate independent test of the proposed decision: Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.

Question 288

Select TWO case-specific elements of a justified Daily-standup-purpose resolution : the decision and its direct evidence. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect the idea log and decision criteria for breadth of proposals and rationale for selection. Reconcile the result with the current approved decision baseline.
  2. Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline.
  3. Extending the standup into a daily performance appraisal discourages surfacing impediments.
  4. Use a moderated focus group to explore attitudes and pain points, then validate findings with broader evidence when needed. Document impacted stakeholders and the decision owner at the review.
  5. Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

B:

This checks the actual mechanism rather than merely declaring success: Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. The desired observed result is The daily coordination supports delivery and collaboration instead of executive reporting theater. The decision can be traced to the review evidence. [R158 R158-Q0288; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

E:

The case evidence identifies An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. The specified decision directly addresses it: Refocus the short coordination meeting on progress toward the team goal, immediate impediments and useful follow-up conversations. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. [R158 R158-Q0288; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

Incorrect Answers

A:

The proposed verify (Inspect the idea log and decision criteria for breadth of proposals and rationale for selection. Reconcile the result with the current approved decision baseline.) comes from a different Problem-solving tools and techniques situation: A team needs multiple ideas for reducing defects but begins voting before quieter members can contribute. It does not resolve or independently test the stated issue: An agile team's standup has become a lengthy status presentation to an executive, leaving blockers unresolved. Here, the relevant check is Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline. [R158 R158-Q0288; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

C:

This is a tempting but unsupported shortcut in this case: Extending the standup into a daily performance appraisal discourages surfacing impediments. It does not show that The daily coordination supports delivery and collaboration instead of executive reporting theater. The decision can be traced to the review evidence. [R158 R158-Q0288; case R158-C072; CAPM domain 1, task 1.5; source SCRUM.]

D:

This option concerns a different Problem-solving tools and techniques situation: A public transit service wants detailed reactions from a targeted rider segment before finalizing kiosk behavior. For the reported case, use this verification: Inspect whether the team adapts its daily plan and blockers receive timely owner follow-up. Reconcile the result with the current approved decision baseline.

Question 289

Which project-management decision best addresses the Stable-specification-predictive-choice situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A municipal bridge rehabilitation uses approved engineering drawings, fixed inspection criteria and a contract requiring sequential design and construction sign-offs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Model the logical predecessor relationships and required approval milestone before establishing the integrated sequence. Record the rationale before the next commitment.
  2. Identify matrix decision rights and negotiate resource availability, escalation routes and responsibility assignments in the predictive plan. Document impacted stakeholders and the decision owner at the review.
  3. Choosing short experimental iterations solely because they are fashionable can ignore fixed regulatory and contractual gates.
  4. Choose a predictive approach with planned baselines, ordered work packages and controlled changes for the stable deliverables. Record the rationale before the next commitment.

Explanation

Correct Answer

D:

The case evidence identifies A municipal bridge rehabilitation uses approved engineering drawings, fixed inspection criteria and a contract requiring sequential design and construction sign-offs. The specified decision directly addresses it: Choose a predictive approach with planned baselines, ordered work packages and controlled changes for the stable deliverables. Record the rationale before the next commitment. This can be checked using Compare work packages and approval gates with contract requirements and inspect approved baseline versions. Retain the initiating evidence for audit. [R158 R158-Q0289; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

Incorrect Answers

A:

The proposed action (Model the logical predecessor relationships and required approval milestone before establishing the integrated sequence. Record the rationale before the next commitment.) comes from a different Predictive approach suitability and activities situation: A museum renovation schedule lists restoration, electrical testing and public opening as parallel tasks even though opening depends on safety acceptance. It does not resolve or independently test the stated issue: A municipal bridge rehabilitation uses approved engineering drawings, fixed inspection criteria and a contract requiring sequential design and construction sign-offs. Here, the relevant check is Compare work packages and approval gates with contract requirements and inspect approved baseline versions. Retain the initiating evidence for audit. [R158 R158-Q0289; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

B:

The proposed action (Identify matrix decision rights and negotiate resource availability, escalation routes and responsibility assignments in the predictive plan. Document impacted stakeholders and the decision owner at the review.) comes from a different Predictive approach suitability and activities situation: A plant modernization uses technicians assigned by functional managers and the PM assumes the specialists are fully dedicated. It does not resolve or independently test the stated issue: A municipal bridge rehabilitation uses approved engineering drawings, fixed inspection criteria and a contract requiring sequential design and construction sign-offs. Here, the relevant check is Compare work packages and approval gates with contract requirements and inspect approved baseline versions. Retain the initiating evidence for audit. [R158 R158-Q0289; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

C:

This is a tempting but unsupported shortcut in this case: Choosing short experimental iterations solely because they are fashionable can ignore fixed regulatory and contractual gates. It does not show that The plan provides traceable milestone and scope control for work whose acceptance criteria are sufficiently stable. The result is recorded in the project controls. [R158 R158-Q0289; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

Question 290

After a corrective decision on Stable-specification-predictive-choice, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A municipal bridge rehabilitation uses approved engineering drawings, fixed inspection criteria and a contract requiring sequential design and construction sign-offs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Compare work packages and approval gates with contract requirements and inspect approved baseline versions. Retain the initiating evidence for audit.
  2. Check resource commitments and responsibility assignments with the functional supervisors. Reconcile the result with the current approved decision baseline.
  3. Inspect the activity network and safety-approval predecessor to the opening milestone. Reconcile the result with the current approved decision baseline.
  4. Choosing short experimental iterations solely because they are fashionable can ignore fixed regulatory and contractual gates.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Compare work packages and approval gates with contract requirements and inspect approved baseline versions. Retain the initiating evidence for audit. The desired observed result is The plan provides traceable milestone and scope control for work whose acceptance criteria are sufficiently stable. The result is recorded in the project controls. [R158 R158-Q0290; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

Incorrect Answers

B:

The proposed verify (Check resource commitments and responsibility assignments with the functional supervisors. Reconcile the result with the current approved decision baseline.) comes from a different Predictive approach suitability and activities situation: A plant modernization uses technicians assigned by functional managers and the PM assumes the specialists are fully dedicated. It does not resolve or independently test the stated issue: A municipal bridge rehabilitation uses approved engineering drawings, fixed inspection criteria and a contract requiring sequential design and construction sign-offs. Here, the relevant check is Compare work packages and approval gates with contract requirements and inspect approved baseline versions. Retain the initiating evidence for audit. [R158 R158-Q0290; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

C:

The proposed verify (Inspect the activity network and safety-approval predecessor to the opening milestone. Reconcile the result with the current approved decision baseline.) comes from a different Predictive approach suitability and activities situation: A museum renovation schedule lists restoration, electrical testing and public opening as parallel tasks even though opening depends on safety acceptance. It does not resolve or independently test the stated issue: A municipal bridge rehabilitation uses approved engineering drawings, fixed inspection criteria and a contract requiring sequential design and construction sign-offs. Here, the relevant check is Compare work packages and approval gates with contract requirements and inspect approved baseline versions. Retain the initiating evidence for audit. [R158 R158-Q0290; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Choosing short experimental iterations solely because they are fashionable can ignore fixed regulatory and contractual gates. It does not show that The plan provides traceable milestone and scope control for work whose acceptance criteria are sufficiently stable. The result is recorded in the project controls. [R158 R158-Q0290; case R158-C073; CAPM domain 2, task 2.1; source ECO.]

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

UP

SPECIAL OFFER: GET 10% OFF

This is ONE TIME OFFER

ExamSnap Discount Offer
Enter Your Email Address to Receive Your 10% Off Discount Code

A confirmation link will be sent to this email address to verify your login. *We value your privacy. We will not rent or sell your email address.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.