100% Latest & Updated Cisco 350-901 Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!
Question 320
The team squashes commits but inadvertently drops a security test that was introduced mid-branch. Independently, reviewers flag this potentially unsafe practice for assessment: 'Delete the source change record after the squash succeeds'. Which verification addresses that practice without assuming it caused the incident?
- Review commit and merge-request references
- Hard reset main to an arbitrary feature commit to make history shorter
- Inspect pipeline and approval status
- Diff target tree and merge request change set
Explanation
Correct Answer
A:Lost provenance weakens later diagnosis. The intended behavior is: One commit should remain attributable to the reviewed work.
Incorrect Answers
B:Resetting shared main discards legitimate commits.
C:This checks validate protected branch controls, not the named failure. A compact commit still needs quality gates.
D:This checks preserve final tree content, not the named failure. Commit count differs from code-change completeness.
Question 321
A critical VLAN parser fix exists on a development branch but a stable release branch must avoid unrelated features. The specific implementation objective is to select exact commit. Which configuration best meets the stated requirement?
- Use git cherry-pick for the reviewed fix commit rather than merging the whole branch
- Mark the cherry-pick complete after resolving text without executing tests
- Assume a cherry-picked patch always has all its dependencies
- Copy code manually with no reference to the original fix
Explanation
Correct Answer
A:Selective integration avoids unrelated release changes.
Incorrect Answers
B:Textual resolution does not guarantee functionality.
C:Missing dependencies can break the target branch.
D:Unattributed copies hinder maintenance.
Question 322
A critical VLAN parser fix exists on a development branch but a stable release branch must avoid unrelated features. The specific implementation objective is to check dependent changes. Which design action is most appropriate for this case?
- Copy code manually with no reference to the original fix
- Review whether the patch needs other commits or version changes
- Merge every unfinished development feature to obtain one fix
- Mark the cherry-pick complete after resolving text without executing tests
Explanation
Correct Answer
B:Cherry-pick copies changes, not entire original branch context.
Incorrect Answers
A:Unattributed copies hinder maintenance.
C:Broad merge increases untested release risk.
D:Textual resolution does not guarantee functionality.
Question 323
A critical VLAN parser fix exists on a development branch but a stable release branch must avoid unrelated features. The specific implementation objective is to resolve conflicts with tests. What should the engineer implement for this specific objective?
- Merge every unfinished development feature to obtain one fix
- Assume a cherry-picked patch always has all its dependencies
- Copy code manually with no reference to the original fix
- Resolve cherry-pick conflicts and run target-branch tests
Explanation
Correct Answer
D:The ported patch must work in its destination context.
Incorrect Answers
A:Broad merge increases untested release risk.
B:Missing dependencies can break the target branch.
C:Unattributed copies hinder maintenance.
Question 324
A critical VLAN parser fix exists on a development branch but a stable release branch must avoid unrelated features. The specific implementation objective is to record origin and approval. Which adjustment would satisfy this particular constraint?
- Merge every unfinished development feature to obtain one fix
- Assume a cherry-picked patch always has all its dependencies
- Retain source commit reference and change approval for the backport
- Mark the cherry-pick complete after resolving text without executing tests
Explanation
Correct Answer
C:An isolated fix still needs provenance.
Incorrect Answers
A:Broad merge increases untested release risk.
B:Missing dependencies can break the target branch.
D:Textual resolution does not guarantee functionality.
Question 325
A critical VLAN parser fix exists on a development branch but a stable release branch must avoid unrelated features. The deployment plan must both (1) select exact commit and (2) resolve conflicts with tests. Which TWO actions together satisfy those requirements? Choose TWO.
- Use git cherry-pick for the reviewed fix commit rather than merging the whole branch
- Resolve cherry-pick conflicts and run target-branch tests
- Mark the cherry-pick complete after resolving text without executing tests
- Assume a cherry-picked patch always has all its dependencies
- Merge every unfinished development feature to obtain one fix
Explanation
Correct Answers
A:Selective integration avoids unrelated release changes.
B:The ported patch must work in its destination context.
Incorrect Answers
C:Textual resolution does not guarantee functionality.
D:Missing dependencies can break the target branch.
E:Broad merge increases untested release risk.
Question 326
A critical VLAN parser fix exists on a development branch but a stable release branch must avoid unrelated features. Three conditions must be met: (1) check dependent changes; (2) resolve conflicts with tests; and (3) record origin and approval. Which THREE actions form the narrowest complete plan? Choose THREE.
- Mark the cherry-pick complete after resolving text without executing tests
- Retain source commit reference and change approval for the backport
- Resolve cherry-pick conflicts and run target-branch tests
- Merge every unfinished development feature to obtain one fix
- Review whether the patch needs other commits or version changes
- Assume a cherry-picked patch always has all its dependencies
Explanation
Correct Answers
B:An isolated fix still needs provenance.
C:The ported patch must work in its destination context.
E:Cherry-pick copies changes, not entire original branch context.
Incorrect Answers
A:Textual resolution does not guarantee functionality.
D:Broad merge increases untested release risk.
F:Missing dependencies can break the target branch.
Question 327
Cherry-picking a dependency change causes a unit test failure because the target branch lacks a required helper. Independently, reviewers flag this potentially unsafe practice for assessment: 'Merge every unfinished development feature to obtain one fix'. Which inspection most directly evaluates that practice?
- Inspect chosen commit ID and patch content
- Copy code manually with no reference to the original fix
- Compare dependency graph and target branch content
- Inspect target-branch CI results
Explanation
Correct Answer
A:Broad merge increases untested release risk. The intended behavior is: Selective integration avoids unrelated release changes.
Incorrect Answers
B:Unattributed copies hinder maintenance.
C:This checks check dependent changes, not the named failure. Cherry-pick copies changes, not entire original branch context.
D:This checks resolve conflicts with tests, not the named failure. The ported patch must work in its destination context.
Question 328
Cherry-picking a dependency change causes a unit test failure because the target branch lacks a required helper. Independently, reviewers flag this potentially unsafe practice for assessment: 'Assume a cherry-picked patch always has all its dependencies'. What diagnostic evidence should first be collected to assess that practice?
- Mark the cherry-pick complete after resolving text without executing tests
- Compare dependency graph and target branch content
- Inspect chosen commit ID and patch content
- Check backport commit message and review link
Explanation
Correct Answer
B:Missing dependencies can break the target branch. The intended behavior is: Cherry-pick copies changes, not entire original branch context.
Incorrect Answers
A:Textual resolution does not guarantee functionality.
C:This checks select exact commit, not the named failure. Selective integration avoids unrelated release changes.
D:This checks record origin and approval, not the named failure. An isolated fix still needs provenance.
Question 329
Cherry-picking a dependency change causes a unit test failure because the target branch lacks a required helper. Independently, reviewers flag this potentially unsafe practice for assessment: 'Mark the cherry-pick complete after resolving text without executing tests'. Which focused check best tests this specific assumption?
- Inspect target-branch CI results
- Compare dependency graph and target branch content
- Merge every unfinished development feature to obtain one fix
- Check backport commit message and review link
Explanation
Correct Answer
A:Textual resolution does not guarantee functionality. The intended behavior is: The ported patch must work in its destination context.
Incorrect Answers
B:This checks check dependent changes, not the named failure. Cherry-pick copies changes, not entire original branch context.
C:Broad merge increases untested release risk.
D:This checks record origin and approval, not the named failure. An isolated fix still needs provenance.
Question 330
Cherry-picking a dependency change causes a unit test failure because the target branch lacks a required helper. Independently, reviewers flag this potentially unsafe practice for assessment: 'Copy code manually with no reference to the original fix'. Which verification addresses that practice without assuming it caused the incident?
- Merge every unfinished development feature to obtain one fix
- Compare dependency graph and target branch content
- Inspect target-branch CI results
- Check backport commit message and review link
Explanation
Correct Answer
D:Unattributed copies hinder maintenance. The intended behavior is: An isolated fix still needs provenance.
Incorrect Answers
A:Broad merge increases untested release risk.
B:This checks check dependent changes, not the named failure. Cherry-pick copies changes, not entire original branch context.
C:This checks resolve conflicts with tests, not the named failure. The ported patch must work in its destination context.
Designing, Deploying, and Managing Network Automation Systems (350-901) Practice Tests