Question 180
A ballroom hosts 1,200 simultaneous conference attendees, and an initial AP quote is based only on square footage. Which process improvement fits the identified design exposure?
- Reassess management fit when the customer adds identity or segmentation requirements.
- Keep guest trust boundaries in security-design review, not only in cabling diagrams.
- Keep capacity assumptions tied to event type and room reconfiguration.
- Require facilities sign-off on rack elevation and electrical requirements with the final BoM.
Explanation
Correct Answer
C:This safeguard makes the control repeatable when the installation or requirements change. Keep capacity assumptions tied to event type and room reconfiguration.
Incorrect Answers
A:That option addresses small business management boundary, not this design gap. The needed safeguard is: Keep capacity assumptions tied to event type and room reconfiguration.
B:That is relevant to guest-to-internet trust boundary, but this case is about ap count based on occupancy. Capacity, airtime and client distribution can be more restrictive than simple coverage area.
D:That alternative addresses a campus facing idf rack and power constraints. The stated requirement instead calls for: Develop an RF and client-density plan using expected devices, applications, antenna placement and measured interference.
Question 181
One IDF must power 24 APs rated for a 25 W planning budget each and 12 sensors budgeted at 10 W each; the proposed PoE supply offers only 600 W usable. What should the architect infer before selecting products?
- The operational design must account for management-plane reachability, allowed destinations and disconnected behavior.
- The diagram hides guest isolation and any portal and firewall enforcement components.
- The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom.
- Nominal cluster capacity may look adequate while surviving-node headroom under a peer failure is insufficient.
Explanation
Correct Answer
C:The decisive issue is the planned 720 w demand exceeds the stated 600 w usable supply before additional headroom. The scenario’s concrete constraint is: One IDF must power 24 APs rated for a 25 W planning budget each and 12 sensors budgeted at 10 W each; the proposed PoE supply offers only 600 W usable.
Incorrect Answers
A:That is relevant to cloud management connectivity, but this case is about poe wattage arithmetic. The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom.
B:That alternative addresses a campus facing guest-to-internet trust boundary. The stated requirement instead calls for: Revise the PoE supply or access-switch mix to cover at least the 720 W modeled load plus approved margin.
D:That alternative addresses a campus facing gateway cluster capacity after failure. The stated requirement instead calls for: Revise the PoE supply or access-switch mix to cover at least the 720 W modeled load plus approved margin.
Question 182
One IDF must power 24 APs rated for a 25 W planning budget each and 12 sensors budgeted at 10 W each; the proposed PoE supply offers only 600 W usable. Which next design step best resolves the identified problem?
- Reconcile transceiver counts per physical port, patch assemblies, optics support and required spares.
- Revise the PoE supply or access-switch mix to cover at least the 720 W modeled load plus approved margin.
- Select supported VSF access stacking and appropriate VSX-capable core or aggregation redundancy where required.
- Add supplicant, authenticator, RADIUS/NAC, role assignment and enforcement points to a functional diagram.
Explanation
Correct Answer
B:The intervention addresses: The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom. Check effectiveness by: Calculate 24 times 25 plus 12 times 10 and compare with usable supply and failover state.
Incorrect Answers
A:It targets optic and cable quantity reconciliation rather than the missing control in this design. The relevant safeguard is: Require per-closet worst-case PoE sums rather than installed switch nameplate assumptions.
C:That option addresses access stacking versus core pairing, not this design gap. The needed safeguard is: Require per-closet worst-case PoE sums rather than installed switch nameplate assumptions.
D:That is relevant to role assignment path diagram, but this case is about poe wattage arithmetic. The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom.
Question 183
One IDF must power 24 APs rated for a 25 W planning budget each and 12 sensors budgeted at 10 W each; the proposed PoE supply offers only 600 W usable. What verification would most directly confirm the design decision?
- Validate that the simplified design meets failure tolerance, port and routed-service requirements.
- Test busy-room client throughput and retry rates against the accepted occupancy profile.
- Disconnect one provider in a planned test and record which applications recover within their target windows.
- Calculate 24 times 25 plus 12 times 10 and compare with usable supply and failover state.
Explanation
Correct Answer
D:It examines whether the key risk has been controlled: The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom. A pass requires the specific behavior in this option, not a general health indicator.
Incorrect Answers
A:That is relevant to small-office campus topology, but this case is about poe wattage arithmetic. The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom.
B:It would address the different situation in ap count based on occupancy; it does not resolve the stated design evidence. Here, the planned 720 W demand exceeds the stated 600 W usable supply before additional headroom.
C:That is relevant to dual-wan failover model, but this case is about poe wattage arithmetic. The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom.
Question 184
One IDF must power 24 APs rated for a 25 W planning budget each and 12 sensors budgeted at 10 W each; the proposed PoE supply offers only 600 W usable. Select TWO elements that together provide a direct architecture response and a confirming acceptance check.
- Calculate 24 times 25 plus 12 times 10 and compare with usable supply and failover state.
- Check connector, fiber type, reach and device compatibility as a matched assembly.
- Revise the PoE supply or access-switch mix to cover at least the 720 W modeled load plus approved margin.
- Simulate one gateway unavailable under busy traffic and confirm load stays within supported capacity.
- Reconcile transceiver counts per physical port, patch assemblies, optics support and required spares.
Explanation
Correct Answers
A:It examines whether the key risk has been controlled: The planned 720 W demand exceeds the stated 600 W usable supply before additional headroom. A pass requires the specific behavior in this option, not a general health indicator.
C:Revise the PoE supply or access-switch mix to cover at least the 720 W modeled load plus approved margin. Acceptance evidence: Calculate 24 times 25 plus 12 times 10 and compare with usable supply and failover state.
Incorrect Answers
B:That alternative addresses a campus facing fiber reach and optic compatibility. The stated requirement instead calls for: Revise the PoE supply or access-switch mix to cover at least the 720 W modeled load plus approved margin.
D:That response could help in a separate gateway cluster capacity after failure project, but it cannot establish the needed result here: Calculate 24 times 25 plus 12 times 10 and compare with usable supply and failover state.
E:It targets optic and cable quantity reconciliation rather than the missing control in this design. The relevant safeguard is: Require per-closet worst-case PoE sums rather than installed switch nameplate assumptions.
Question 185
A customer buys 2.5 GbE-capable APs but every proposed access port and uplink is 1 GbE. Which design issue is most directly shown by these facts?
- Roaming behavior depends on traffic anchoring and subnet boundaries that the current diagram omits.
- The wired edge can bottleneck the radio deployment despite matching the physical RJ45 connector.
- The aggregate demand model and expected burst characteristics are not reconciled to uplink capacity.
- Two circuits do not by themselves document usable service continuity.
Explanation
Correct Answer
B:The decisive issue is the wired edge can bottleneck the radio deployment despite matching the physical rj45 connector. The scenario’s concrete constraint is: A customer buys 2.5 GbE-capable APs but every proposed access port and uplink is 1 GbE.
Incorrect Answers
A:That option addresses roaming domain mapping, not this design gap. The needed safeguard is: Keep AP uplink speeds and switch interface capabilities in the same BOM worksheet.
C:That response could help in a separate uplink oversubscription review project, but it cannot establish the needed result here: Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
D:It would address the different situation in dual-wan failover model; it does not resolve the stated design evidence. Here, the wired edge can bottleneck the radio deployment despite matching the physical RJ45 connector.
Question 186
A customer buys 2.5 GbE-capable APs but every proposed access port and uplink is 1 GbE. What action is most defensible within the stated constraints?
- Compare bridge, tunnel and mixed forwarding modes against each traffic class and enforcement requirement.
- Develop an RF and client-density plan using expected devices, applications, antenna placement and measured interference.
- Select compatible multigigabit access ports and sufficient upstream bandwidth after application analysis.
- Add supplicant, authenticator, RADIUS/NAC, role assignment and enforcement points to a functional diagram.
Explanation
Correct Answer
C:This is proportionate to the customer's actual constraint. Select compatible multigigabit access ports and sufficient upstream bandwidth after application analysis. The decision is not complete without verifying: Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
Incorrect Answers
A:That response could help in a separate wireless forwarding choice project, but it cannot establish the needed result here: Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
B:That response could help in a separate ap count based on occupancy project, but it cannot establish the needed result here: Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
D:That response could help in a separate role assignment path diagram project, but it cannot establish the needed result here: Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
Question 187
A customer buys 2.5 GbE-capable APs but every proposed access port and uplink is 1 GbE. Which test best distinguishes the proposed fix from a cosmetic change?
- Power down one aggregation peer during staging and confirm surviving connectivity.
- Join and leave test streams from two rooms and verify only intended receivers get copies.
- Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
- Model loss of an aggregation uplink and verify that affected traffic follows a viable routed path.
Explanation
Correct Answer
C:Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test. This measures the intended design outcome, not just equipment power.
Incorrect Answers
A:That alternative addresses a campus facing redundant aggregation links. The stated requirement instead calls for: Select compatible multigigabit access ports and sufficient upstream bandwidth after application analysis.
B:That option addresses multicast distribution workflow, not this design gap. The needed safeguard is: Keep AP uplink speeds and switch interface capabilities in the same BOM worksheet.
D:That alternative addresses a campus facing multi-building growth design. The stated requirement instead calls for: Select compatible multigigabit access ports and sufficient upstream bandwidth after application analysis.
Question 188
A customer buys 2.5 GbE-capable APs but every proposed access port and uplink is 1 GbE. Select TWO elements that together provide a direct architecture response and a confirming acceptance check.
- Select compatible multigigabit access ports and sufficient upstream bandwidth after application analysis.
- Use a topology-to-part-number audit for all uplink and redundancy groups.
- Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
- Check actual chassis dimensions, cooling and dual-source availability at the installation site.
- Survey physical and electrical limits and revise switch form factor, rack or power design before procurement.
Explanation
Correct Answers
A:This is proportionate to the customer's actual constraint. Select compatible multigigabit access ports and sufficient upstream bandwidth after application analysis. The decision is not complete without verifying: Measure the negotiated AP Ethernet rate and run a representative end-to-end throughput test.
C:This check tests the specific risk: The wired edge can bottleneck the radio deployment despite matching the physical RJ45 connector. A general health status is insufficient.
Incorrect Answers
B:That alternative addresses a campus facing optic and cable quantity reconciliation. The stated requirement instead calls for: Select compatible multigigabit access ports and sufficient upstream bandwidth after application analysis.
D:It would address the different situation in idf rack and power constraints; it does not resolve the stated design evidence. Here, the wired edge can bottleneck the radio deployment despite matching the physical RJ45 connector.
E:It would address the different situation in idf rack and power constraints; it does not resolve the stated design evidence. Here, the wired edge can bottleneck the radio deployment despite matching the physical RJ45 connector.
Question 189
A 450 m MDF-to-IDF span uses verified OS2 single-mode fiber; the quote specifies an SR optic intended for multimode fiber. Which design issue is most directly shown by these facts?
- Capacity, airtime and client distribution can be more restrictive than simple coverage area.
- The transceiver media specification is incompatible with the installed single-mode path.
- The proposed layering may add cost and operational complexity without a scale or fault-domain need.
- The channel and capacity design depends on band support and RF behavior, not advertised peak PHY rates.
Explanation
Correct Answer
B:The decisive issue is the transceiver media specification is incompatible with the installed single-mode path. The scenario’s concrete constraint is: A 450 m MDF-to-IDF span uses verified OS2 single-mode fiber; the quote specifies an SR optic intended for multimode fiber.
Incorrect Answers
A:That is relevant to ap count based on occupancy, but this case is about fiber reach and optic compatibility. The transceiver media specification is incompatible with the installed single-mode path.
C:That is relevant to small-office campus topology, but this case is about fiber reach and optic compatibility. The transceiver media specification is incompatible with the installed single-mode path.
D:That is relevant to high-density 6 ghz design, but this case is about fiber reach and optic compatibility. The transceiver media specification is incompatible with the installed single-mode path.
Question 190
A 450 m MDF-to-IDF span uses verified OS2 single-mode fiber; the quote specifies an SR optic intended for multimode fiber. What action is most defensible within the stated constraints?
- Compare bridge, tunnel and mixed forwarding modes against each traffic class and enforcement requirement.
- Choose a platform-supported single-mode optic with an adequate optical reach and matched connector requirements.
- Select supported VSF access stacking and appropriate VSX-capable core or aggregation redundancy where required.
- Develop an RF and client-density plan using expected devices, applications, antenna placement and measured interference.
Explanation
Correct Answer
B:The intervention addresses the stated limitation: The transceiver media specification is incompatible with the installed single-mode path. Its effectiveness should then be checked by this observation: Validate optical budget and receive levels on the installed OS2 link before acceptance.
Incorrect Answers
A:That option addresses wireless forwarding choice, not this design gap. The needed safeguard is: Check connector, fiber type, reach and device compatibility as a matched assembly.
C:That is relevant to access stacking versus core pairing, but this case is about fiber reach and optic compatibility. The transceiver media specification is incompatible with the installed single-mode path.
D:That response could help in a separate ap count based on occupancy project, but it cannot establish the needed result here: Validate optical budget and receive levels on the installed OS2 link before acceptance.