PMI CAPM Exam Dumps, Practice Test Questions

100% Latest & Updated PMI CAPM Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!

PMI CAPM Premium Bundle
$79.97
$59.98

CAPM Premium Bundle

  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates

CAPM Premium Bundle

PMI CAPM Premium Bundle
  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates
$79.97
$59.98

PMI CAPM Practice Test 14

Question 130

After a corrective decision on Stakeholder-register-segmentation, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit.
  2. Check agreed thresholds and test evidence against the actual delivered workflow. Retain the initiating evidence for audit.
  3. Compare agreed baseline and post-rollout metrics using consistent population and measurement periods. Reconcile the result with the current approved decision baseline.
  4. Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit. The desired observed result is Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls. [R158 R158-Q0130; case R158-C033; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

B:

This option concerns a different Project management planning situation: A new supplier onboarding flow has an acceptance deadline but no defined accuracy, reliability or performance thresholds. For the reported case, use this verification: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit.

C:

This option concerns a different Project management planning situation: A sponsor claims productivity increased after rollout but no pre-rollout baseline exists to compare. For the reported case, use this verification: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit.

D:

This is a tempting but unsupported shortcut in this case: Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning. It does not show that Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls. [R158 R158-Q0130; case R158-C033; CAPM domain 1, task 1.2; source ECO.]

Question 131

Which statement most accurately flags a misleading shortcut to avoid in this Stakeholder-register-segmentation case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls.
  2. Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning.
  3. Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Record the rationale before the next commitment.
  4. Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit.

Explanation

Correct Answer

B:

The shortcut is mistaken: Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning. The appropriate response is to identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Record the rationale before the next commitment.

Incorrect Answers

A:

This is a relevant outcome to seek after the decision: Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls. It is not an unsupported assumption.

C:

This is a supported decision, not the unsupported claim: Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Record the rationale before the next commitment. It responds to the actual project issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs.

D:

This is an appropriate independent test of the proposed decision: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit. It is not the invalid shortcut.

Question 132

Select THREE consistent elements of the Stakeholder-register-segmentation case: appropriate decision, verification, and observable success condition. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls.
  2. Assess resource availability and level or resequence the conflicting assignments before committing schedule dates. Record the rationale before the next commitment.
  3. Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit.
  4. Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Record the rationale before the next commitment.
  5. Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls.
  6. Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning.

Explanation

Correct Answer

A:

The stated result demonstrates the case acceptance condition: Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls. It depends on the decision Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Record the rationale before the next commitment.

C:

This checks the actual mechanism rather than merely declaring success: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit. The desired observed result is Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls. [R158 R158-Q0132; case R158-C033; CAPM domain 1, task 1.2; source ECO.]

D:

The case evidence identifies A regulator and end users receive the same generic project updates despite having different decisions and information needs. The specified decision directly addresses it: Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Record the rationale before the next commitment. This can be checked using Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit. [R158 R158-Q0132; case R158-C033; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

B:

The proposed action (Assess resource availability and level or resequence the conflicting assignments before committing schedule dates. Record the rationale before the next commitment.) comes from a different Project management planning situation: A rollout assigns the same specialist simultaneously to two full-time integrations although the plan assumes no resource bottleneck. It does not resolve or independently test the stated issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Here, the relevant check is Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit. [R158 R158-Q0132; case R158-C033; CAPM domain 1, task 1.2; source ECO.]

E:

The proposed outcome (Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls.) comes from a different Project management planning situation: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. It does not resolve or independently test the stated issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Here, the relevant check is Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Retain the initiating evidence for audit. [R158 R158-Q0132; case R158-C033; CAPM domain 1, task 1.2; source ECO.]

F:

This is a tempting but unsupported shortcut in this case: Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning. It does not show that Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The result is recorded in the project controls. [R158 R158-Q0132; case R158-C033; CAPM domain 1, task 1.2; source ECO.]

Question 133

Which project-management decision best addresses the Stakeholder-register-segmentation situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Distinguish evolving product direction from the project management plan's execution, governance and control components. Document impacted stakeholders and the decision owner at the review.
  2. Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review.
  3. Define audience, decisions, escalation triggers, communication channel, cadence and response expectations in the communication plan. Document impacted stakeholders and the decision owner at the review.
  4. Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning.

Explanation

Correct Answer

B:

The case evidence identifies A regulator and end users receive the same generic project updates despite having different decisions and information needs. The specified decision directly addresses it: Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. [R158 R158-Q0133; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

A:

This option concerns a different Project management planning situation: An application team treats the long-term feature roadmap as if it specified the project's staffing, risks, procurement and change controls. For the reported case, use this verification: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline.

C:

The proposed action (Define audience, decisions, escalation triggers, communication channel, cadence and response expectations in the communication plan. Document impacted stakeholders and the decision owner at the review.) comes from a different Project management planning situation: A remote project team sends status slides weekly but keeps missing decisions that require urgent escalation. It does not resolve or independently test the stated issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Here, the relevant check is Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. [R158 R158-Q0133; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning. It does not show that Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence. [R158 R158-Q0133; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

Question 134

After a corrective decision on Stakeholder-register-segmentation, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline.
  2. Review whether the entry has a clear event and actionable response with a defined owner. Retain the initiating evidence for audit.
  3. Review delayed decisions and confirm owners receive time-critical requests through the agreed route. Reconcile the result with the current approved decision baseline.
  4. Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. The desired observed result is Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence. [R158 R158-Q0134; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

B:

The proposed verify (Review whether the entry has a clear event and actionable response with a defined owner. Retain the initiating evidence for audit.) comes from a different Project management planning situation: A flood exposure is listed only as high risk, with no specific event description, owner or response. It does not resolve or independently test the stated issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Here, the relevant check is Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. [R158 R158-Q0134; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

C:

The proposed verify (Review delayed decisions and confirm owners receive time-critical requests through the agreed route. Reconcile the result with the current approved decision baseline.) comes from a different Project management planning situation: A remote project team sends status slides weekly but keeps missing decisions that require urgent escalation. It does not resolve or independently test the stated issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Here, the relevant check is Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. [R158 R158-Q0134; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning. It does not show that Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence. [R158 R158-Q0134; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

Question 135

Which statement most accurately flags a misleading shortcut to avoid in this Stakeholder-register-segmentation case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review.
  2. Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline.
  3. Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning.
  4. Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence.

Explanation

Correct Answer

C:

The shortcut is mistaken: Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning. The appropriate response is to identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a supported decision, not the unsupported claim: Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs.

B:

This is an appropriate independent test of the proposed decision: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.

D:

This is a relevant outcome to seek after the decision: Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence. It is not an unsupported assumption.

Question 136

Select THREE consistent elements of the Stakeholder-register-segmentation case: appropriate decision, verification, and observable success condition. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning.
  2. Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review.
  3. Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence.
  4. Record cause, potential event, impact, qualitative assessment, owner and planned response in the risk register. Record the rationale before the next commitment.
  5. The assigned expert's work is feasible without an unacknowledged over-allocation. The decision can be traced to the review evidence.
  6. Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

B:

The case evidence identifies A regulator and end users receive the same generic project updates despite having different decisions and information needs. The specified decision directly addresses it: Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. [R158 R158-Q0136; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

C:

The stated result demonstrates the case acceptance condition: Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence. It depends on the decision Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review.

F:

This checks the actual mechanism rather than merely declaring success: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. The desired observed result is Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence. [R158 R158-Q0136; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Assuming all stakeholders need identical messages because they share one project is ineffective engagement planning. It does not show that Stakeholders receive relevant information and decisions reach the appropriate accountable parties. The decision can be traced to the review evidence. [R158 R158-Q0136; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

D:

The proposed action (Record cause, potential event, impact, qualitative assessment, owner and planned response in the risk register. Record the rationale before the next commitment.) comes from a different Project management planning situation: A flood exposure is listed only as high risk, with no specific event description, owner or response. It does not resolve or independently test the stated issue: A regulator and end users receive the same generic project updates despite having different decisions and information needs. Here, the relevant check is Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline. [R158 R158-Q0136; case R158-C034; CAPM domain 1, task 1.2; source ECO.]

E:

This option concerns a different Project management planning situation: A rollout assigns the same specialist simultaneously to two full-time integrations although the plan assumes no resource bottleneck. For the reported case, use this verification: Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline.

Question 137

Which project-management decision best addresses the Closure-and-operations-handoff situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Conduct formal acceptance, knowledge transfer, contract closure and operations transition according to the agreed closure process. Record the rationale before the next commitment.
  2. Plan measurable quality criteria and associated assurance and control activities before final acceptance. Record the rationale before the next commitment.
  3. Assess resource availability and level or resequence the conflicting assignments before committing schedule dates. Record the rationale before the next commitment.
  4. Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness.

Explanation

Correct Answer

A:

Conduct formal acceptance, knowledge transfer, contract closure and operations transition according to the agreed closure process. Record the rationale before the next commitment. To verify the specified result, review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit.

Incorrect Answers

B:

The proposed action (Plan measurable quality criteria and associated assurance and control activities before final acceptance. Record the rationale before the next commitment.) comes from a different Project management planning situation: A new supplier onboarding flow has an acceptance deadline but no defined accuracy, reliability or performance thresholds. It does not resolve or independently test the stated issue: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Here, the relevant check is Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit. [R158 R158-Q0137; case R158-C035; CAPM domain 1, task 1.2; source ECO.]

C:

The proposed action (Assess resource availability and level or resequence the conflicting assignments before committing schedule dates. Record the rationale before the next commitment.) comes from a different Project management planning situation: A rollout assigns the same specialist simultaneously to two full-time integrations although the plan assumes no resource bottleneck. It does not resolve or independently test the stated issue: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Here, the relevant check is Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit. [R158 R158-Q0137; case R158-C035; CAPM domain 1, task 1.2; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness. It does not show that The delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls. [R158 R158-Q0137; case R158-C035; CAPM domain 1, task 1.2; source ECO.]

Question 138

After a corrective decision on Closure-and-operations-handoff, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness.
  2. Compare agreed baseline and post-rollout metrics using consistent population and measurement periods. Reconcile the result with the current approved decision baseline.
  3. Check agreed thresholds and test evidence against the actual delivered workflow. Reconcile the result with the current approved decision baseline.
  4. Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit.

Explanation

Correct Answer

D:

Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit. The expected result is the delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls.

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness. It does not show that The delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls. [R158 R158-Q0138; case R158-C035; CAPM domain 1, task 1.2; source ECO.]

B:

This option concerns a different Project management planning situation: A sponsor claims productivity increased after rollout but no pre-rollout baseline exists to compare. For the reported case, use this verification: Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit.

C:

The proposed verify (Check agreed thresholds and test evidence against the actual delivered workflow. Reconcile the result with the current approved decision baseline.) comes from a different Project management planning situation: A new supplier onboarding flow has an acceptance deadline but no defined accuracy, reliability or performance thresholds. It does not resolve or independently test the stated issue: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Here, the relevant check is Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit. [R158 R158-Q0138; case R158-C035; CAPM domain 1, task 1.2; source ECO.]

Question 139

Which statement most accurately flags a misleading shortcut to avoid in this Closure-and-operations-handoff case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. The delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls.
  2. Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit.
  3. Conduct formal acceptance, knowledge transfer, contract closure and operations transition according to the agreed closure process. Record the rationale before the next commitment.
  4. Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness.

Explanation

Correct Answer

D:

The shortcut is mistaken: Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness. The appropriate response is to conduct formal acceptance, knowledge transfer, contract closure and operations transition according to the agreed closure process. Record the rationale before the next commitment.

Incorrect Answers

A:

This is a relevant outcome to seek after the decision: The delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls. It is not an unsupported assumption.

B:

This is an appropriate independent test of the proposed decision: Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit. It is not the invalid shortcut.

C:

This is a supported decision, not the unsupported claim: Conduct formal acceptance, knowledge transfer, contract closure and operations transition according to the agreed closure process. Record the rationale before the next commitment. It responds to the actual project issue: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing.

Question 140

Which observed result supports acceptance of the Closure-and-operations-handoff corrective decision ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence.
  2. The delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls.
  3. Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness.
  4. The assigned expert's work is feasible without an unacknowledged over-allocation. The result is recorded in the project controls.

Explanation

Correct Answer

B:

The stated result demonstrates the case acceptance condition: The delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls. It depends on the decision Conduct formal acceptance, knowledge transfer, contract closure and operations transition according to the agreed closure process. Record the rationale before the next commitment.

Incorrect Answers

A:

This option concerns a different Project management planning situation: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. For the reported case, use this verification: Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit.

C:

This is a tempting but unsupported shortcut in this case: Declaring closure based only on the engineer's last deployment bypasses acceptance and support readiness. It does not show that The delivered service has an accountable owner and a documented transition into operations. The result is recorded in the project controls. [R158 R158-Q0140; case R158-C035; CAPM domain 1, task 1.2; source ECO.]

D:

The proposed outcome (The assigned expert's work is feasible without an unacknowledged over-allocation. The result is recorded in the project controls.) comes from a different Project management planning situation: A rollout assigns the same specialist simultaneously to two full-time integrations although the plan assumes no resource bottleneck. It does not resolve or independently test the stated issue: A network installation is technically finished, but support ownership, remaining warranties and acceptance records are missing. Here, the relevant check is Review signed acceptance, handover checklist, support contacts and outstanding obligations. Retain the initiating evidence for audit. [R158 R158-Q0140; case R158-C035; CAPM domain 1, task 1.2; source ECO.]

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

UP

SPECIAL OFFER: GET 10% OFF

This is ONE TIME OFFER

ExamSnap Discount Offer
Enter Your Email Address to Receive Your 10% Off Discount Code

A confirmation link will be sent to this email address to verify your login. *We value your privacy. We will not rent or sell your email address.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.