PMI CAPM Exam Dumps, Practice Test Questions

100% Latest & Updated PMI CAPM Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!

PMI CAPM Premium Bundle
$79.97
$59.98

CAPM Premium Bundle

  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates

CAPM Premium Bundle

PMI CAPM Premium Bundle
  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates
$79.97
$59.98

PMI CAPM Practice Test 24

Question 230

After a corrective decision on Risk-trigger-response-execution, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.
  2. Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit.
  3. Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.
  4. Inventing a new response during the outage while ignoring a valid trigger defeats contingency planning.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline. The desired observed result is Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence. [R158 R158-Q0230; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

Incorrect Answers

B:

This option concerns a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. For the reported case, use this verification: Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.

C:

The proposed verify (Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.) comes from a different Planned strategies and frameworks situation: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. It does not resolve or independently test the stated issue: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. Here, the relevant check is Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline. [R158 R158-Q0230; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Inventing a new response during the outage while ignoring a valid trigger defeats contingency planning. It does not show that Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence. [R158 R158-Q0230; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

Question 231

Which statement most accurately flags a misleading shortcut to avoid in this Risk-trigger-response-execution case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence.
  2. Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.
  3. Inventing a new response during the outage while ignoring a valid trigger defeats contingency planning.
  4. Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

C:

The shortcut is mistaken: Inventing a new response during the outage while ignoring a valid trigger defeats contingency planning. The appropriate response is to follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a relevant outcome to seek after the decision: Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence. It is not an unsupported assumption.

B:

This is a supported decision, not the unsupported claim: Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage.

D:

This is an appropriate independent test of the proposed decision: Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.

Question 232

Select THREE consistent elements of the Risk-trigger-response-execution case: appropriate decision, verification, and observable success condition. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inventing a new response during the outage while ignoring a valid trigger defeats contingency planning.
  2. Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.
  3. Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.
  4. Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence.
  5. Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment.
  6. The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls.

Explanation

Correct Answer

B:

This checks the actual mechanism rather than merely declaring success: Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline. The desired observed result is Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence. [R158 R158-Q0232; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

C:

The case evidence identifies A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. The specified decision directly addresses it: Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review. This can be checked using Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline. [R158 R158-Q0232; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

D:

The stated result demonstrates the case acceptance condition: Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence. It depends on the decision Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Inventing a new response during the outage while ignoring a valid trigger defeats contingency planning. It does not show that Response is timely and traceable to the previously agreed strategy. The decision can be traced to the review evidence. [R158 R158-Q0232; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

E:

The proposed action (Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment.) comes from a different Planned strategies and frameworks situation: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. It does not resolve or independently test the stated issue: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. Here, the relevant check is Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline. [R158 R158-Q0232; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

F:

The proposed outcome (The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls.) comes from a different Planned strategies and frameworks situation: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. It does not resolve or independently test the stated issue: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. Here, the relevant check is Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline. [R158 R158-Q0232; case R158-C058; CAPM domain 1, task 1.4; source ECO.]

Question 233

Which project-management decision best addresses the Communication-plan-breach situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment.
  2. Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.
  3. Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment.
  4. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.

Explanation

Correct Answer

C:

The case evidence identifies A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. The specified decision directly addresses it: Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment. This can be checked using Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0233; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

Incorrect Answers

A:

The proposed action (Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0233; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

B:

The proposed action (Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0233; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. It does not show that Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls. [R158 R158-Q0233; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

Question 234

After a corrective decision on Communication-plan-breach, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit.
  2. Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit.
  3. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.
  4. Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. The desired observed result is Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls. [R158 R158-Q0234; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

Incorrect Answers

B:

The proposed verify (Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0234; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

C:

This is a tempting but unsupported shortcut in this case: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. It does not show that Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls. [R158 R158-Q0234; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

D:

The proposed verify (Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0234; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

Question 235

Which statement most accurately flags a misleading shortcut to avoid in this Communication-plan-breach case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment.
  2. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.
  3. Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls.
  4. Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit.

Explanation

Correct Answer

B:

The shortcut is mistaken: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. The appropriate response is to use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment.

Incorrect Answers

A:

This is a supported decision, not the unsupported claim: Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment. It responds to the actual project issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority.

C:

This is a relevant outcome to seek after the decision: Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls. It is not an unsupported assumption.

D:

This is an appropriate independent test of the proposed decision: Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. It is not the invalid shortcut.

Question 236

Select THREE consistent elements of the Communication-plan-breach case: appropriate decision, verification, and observable success condition. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls.
  2. The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls.
  3. Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit.
  4. Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment.
  5. Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment.
  6. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.

Explanation

Correct Answer

A:

The stated result demonstrates the case acceptance condition: Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls. It depends on the decision Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment.

C:

This checks the actual mechanism rather than merely declaring success: Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. The desired observed result is Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls. [R158 R158-Q0236; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

E:

The case evidence identifies A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. The specified decision directly addresses it: Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Record the rationale before the next commitment. This can be checked using Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0236; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

Incorrect Answers

B:

The proposed outcome (The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls.) comes from a different Planned strategies and frameworks situation: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0236; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

D:

The proposed action (Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment.) comes from a different Planned strategies and frameworks situation: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit. [R158 R158-Q0236; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

F:

This is a tempting but unsupported shortcut in this case: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. It does not show that Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The result is recorded in the project controls. [R158 R158-Q0236; case R158-C059; CAPM domain 1, task 1.4; source ECO.]

Question 237

Which project-management decision best addresses the Communication-plan-breach situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.
  2. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.
  3. Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Record the rationale before the next commitment.
  4. Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment.

Explanation

Correct Answer

A:

Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review. To verify the specified result, inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline.

Incorrect Answers

B:

This is a tempting but unsupported shortcut in this case: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. It does not show that Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence. [R158 R158-Q0237; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

C:

This option concerns a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. For the reported case, use this verification: Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline.

D:

The proposed action (Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. [R158 R158-Q0237; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

Question 238

After a corrective decision on Communication-plan-breach, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline.
  2. Review the accepted benefits plan and handover responsibilities for the post-project period. Reconcile the result with the current approved decision baseline.
  3. Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.
  4. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.

Explanation

Correct Answer

A:

Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. The expected result is safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence.

Incorrect Answers

B:

The proposed verify (Review the accepted benefits plan and handover responsibilities for the post-project period. Reconcile the result with the current approved decision baseline.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. [R158 R158-Q0238; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

C:

The proposed verify (Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.) comes from a different Planned strategies and frameworks situation: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. [R158 R158-Q0238; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. It does not show that Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence. [R158 R158-Q0238; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

Question 239

Which statement most accurately flags a misleading shortcut to avoid in this Communication-plan-breach case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.
  2. Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline.
  3. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.
  4. Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence.

Explanation

Correct Answer

C:

The shortcut is mistaken: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. The appropriate response is to use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a supported decision, not the unsupported claim: Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority.

B:

This is an appropriate independent test of the proposed decision: Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.

D:

This is a relevant outcome to seek after the decision: Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence. It is not an unsupported assumption.

Question 240

Which observed result supports acceptance of the Communication-plan-breach corrective decision ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. The organization can track whether the intended outcome continues after the project team disbands. The result is recorded in the project controls.
  2. The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence.
  3. Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence.
  4. Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.

Explanation

Correct Answer

C:

The stated result demonstrates the case acceptance condition: Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence. It depends on the decision Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

The proposed outcome (The organization can track whether the intended outcome continues after the project team disbands. The result is recorded in the project controls.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. [R158 R158-Q0240; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

B:

The proposed outcome (The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence.) comes from a different Planned strategies and frameworks situation: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. [R158 R158-Q0240; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. It does not show that Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence. [R158 R158-Q0240; case R158-C060; CAPM domain 1, task 1.4; source ECO.]

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

UP

SPECIAL OFFER: GET 10% OFF

This is ONE TIME OFFER

ExamSnap Discount Offer
Enter Your Email Address to Receive Your 10% Off Discount Code

A confirmation link will be sent to this email address to verify your login. *We value your privacy. We will not rent or sell your email address.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.