Question 240
Which observed result supports acceptance of the Communication-plan-breach corrective decision ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- The organization can track whether the intended outcome continues after the project team disbands. The result is recorded in the project controls.
- The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence.
- Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence.
- Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy.
Explanation
Correct Answer
C:The stated result demonstrates the case acceptance condition: Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence. It depends on the decision Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:The proposed outcome (The organization can track whether the intended outcome continues after the project team disbands. The result is recorded in the project controls.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. [R158 R158-Q0240; case R158-C060; CAPM domain 1, task 1.4; source ECO.]
B:The proposed outcome (The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence.) comes from a different Planned strategies and frameworks situation: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. It does not resolve or independently test the stated issue: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. Here, the relevant check is Inspect the escalation record and authority approval before work resumes. Reconcile the result with the current approved decision baseline. [R158 R158-Q0240; case R158-C060; CAPM domain 1, task 1.4; source ECO.]
D:This is a tempting but unsupported shortcut in this case: Treating an unrecorded chat acknowledgment as formal safety approval bypasses the planned strategy. It does not show that Safety deviations receive visible, accountable decisions rather than disappearing into chat history. The decision can be traced to the review evidence. [R158 R158-Q0240; case R158-C060; CAPM domain 1, task 1.4; source ECO.]
Question 241
Which project-management decision best addresses the Initiation-gate-business-case situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- A polished Gantt chart by itself does not authorize work or validate the business need.
- Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Document impacted stakeholders and the decision owner at the review.
- Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment.
- Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment.
Explanation
Correct Answer
C:The case evidence identifies A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. The specified decision directly addresses it: Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment. This can be checked using Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. [R158 R158-Q0241; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: A polished Gantt chart by itself does not authorize work or validate the business need. It does not show that The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls. [R158 R158-Q0241; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
B:The proposed action (Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Document impacted stakeholders and the decision owner at the review.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. [R158 R158-Q0241; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
D:The proposed action (Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. [R158 R158-Q0241; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
Question 242
After a corrective decision on Initiation-gate-business-case, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.
- Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.
- A polished Gantt chart by itself does not authorize work or validate the business need.
- Review the accepted benefits plan and handover responsibilities for the post-project period. Reconcile the result with the current approved decision baseline.
Explanation
Correct Answer
B:This checks the actual mechanism rather than merely declaring success: Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. The desired observed result is The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls. [R158 R158-Q0242; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
A:The proposed verify (Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. [R158 R158-Q0242; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
C:This is a tempting but unsupported shortcut in this case: A polished Gantt chart by itself does not authorize work or validate the business need. It does not show that The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls. [R158 R158-Q0242; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
D:The proposed verify (Review the accepted benefits plan and handover responsibilities for the post-project period. Reconcile the result with the current approved decision baseline.) comes from a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. [R158 R158-Q0242; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
Question 243
Which statement most accurately flags a misleading shortcut to avoid in this Initiation-gate-business-case case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.
- Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment.
- The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls.
- A polished Gantt chart by itself does not authorize work or validate the business need.
Explanation
Correct Answer
D:The shortcut is mistaken: A polished Gantt chart by itself does not authorize work or validate the business need. The appropriate response is to establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment.
Incorrect Answers
A:This is an appropriate independent test of the proposed decision: Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. It is not the invalid shortcut.
B:This is a supported decision, not the unsupported claim: Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment. It responds to the actual project issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization.
C:This is a relevant outcome to seek after the decision: The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls. It is not an unsupported assumption.
Question 244
Select TWO case-specific elements of a justified Initiation-gate-business-case resolution : the decision and its direct evidence. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.
- Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.
- A polished Gantt chart by itself does not authorize work or validate the business need.
- Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment.
- Compare outage telemetry with the trigger and the execution log for the approved contingency. Retain the initiating evidence for audit.
Explanation
Correct Answer
A:This checks the actual mechanism rather than merely declaring success: Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. The desired observed result is The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls. [R158 R158-Q0244; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
D:The case evidence identifies A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. The specified decision directly addresses it: Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Record the rationale before the next commitment. This can be checked using Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. [R158 R158-Q0244; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
B:This option concerns a different Planned strategies and frameworks situation: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. For the reported case, use this verification: Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit.
C:This is a tempting but unsupported shortcut in this case: A polished Gantt chart by itself does not authorize work or validate the business need. It does not show that The project starts with legitimate purpose, decision rights and a benefits basis. The result is recorded in the project controls. [R158 R158-Q0244; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
E:The proposed verify (Compare outage telemetry with the trigger and the execution log for the approved contingency. Retain the initiating evidence for audit.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Retain the initiating evidence for audit. [R158 R158-Q0244; case R158-C061; CAPM domain 1, task 1.4; source CHARTER.]
Question 245
Which project-management decision best addresses the Initiation-gate-business-case situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Document impacted stakeholders and the decision owner at the review.
- Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.
- Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.
- A polished Gantt chart by itself does not authorize work or validate the business need.
Explanation
Correct Answer
A:The case evidence identifies A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. The specified decision directly addresses it: Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Document impacted stakeholders and the decision owner at the review. This can be checked using Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. [R158 R158-Q0245; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
B:The proposed action (Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.) comes from a different Planned strategies and frameworks situation: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. [R158 R158-Q0245; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
C:The proposed action (Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. [R158 R158-Q0245; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
D:This is a tempting but unsupported shortcut in this case: A polished Gantt chart by itself does not authorize work or validate the business need. It does not show that The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence. [R158 R158-Q0245; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
Question 246
After a corrective decision on Initiation-gate-business-case, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit.
- A polished Gantt chart by itself does not authorize work or validate the business need.
- Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline.
- Compare outage telemetry with the trigger and the execution log for the approved contingency. Retain the initiating evidence for audit.
Explanation
Correct Answer
C:This checks the actual mechanism rather than merely declaring success: Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. The desired observed result is The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence. [R158 R158-Q0246; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
A:This option concerns a different Planned strategies and frameworks situation: A process-improvement project closes after training but nobody owns post-closure benefit measurement. For the reported case, use this verification: Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline.
B:This is a tempting but unsupported shortcut in this case: A polished Gantt chart by itself does not authorize work or validate the business need. It does not show that The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence. [R158 R158-Q0246; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
D:The proposed verify (Compare outage telemetry with the trigger and the execution log for the approved contingency. Retain the initiating evidence for audit.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. [R158 R158-Q0246; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
Question 247
Which statement most accurately flags a misleading shortcut to avoid in this Initiation-gate-business-case case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline.
- A polished Gantt chart by itself does not authorize work or validate the business need.
- The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence.
- Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Document impacted stakeholders and the decision owner at the review.
Explanation
Correct Answer
B:The shortcut is mistaken: A polished Gantt chart by itself does not authorize work or validate the business need. The appropriate response is to establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:This is an appropriate independent test of the proposed decision: Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.
C:This is a relevant outcome to seek after the decision: The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence. It is not an unsupported assumption.
D:This is a supported decision, not the unsupported claim: Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization.
Question 248
Select TWO case-specific elements of a justified Initiation-gate-business-case resolution : the decision and its direct evidence. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Document impacted stakeholders and the decision owner at the review.
- Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit.
- A polished Gantt chart by itself does not authorize work or validate the business need.
- Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline.
- Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.
Explanation
Correct Answer
A:The case evidence identifies A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. The specified decision directly addresses it: Establish the rationale and obtain charter or investment approval before treating the proposal as an authorized project. Document impacted stakeholders and the decision owner at the review. This can be checked using Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. [R158 R158-Q0248; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
D:This checks the actual mechanism rather than merely declaring success: Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. The desired observed result is The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence. [R158 R158-Q0248; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
B:The proposed verify (Inspect the escalation record and authority approval before work resumes. Retain the initiating evidence for audit.) comes from a different Planned strategies and frameworks situation: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. [R158 R158-Q0248; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
C:This is a tempting but unsupported shortcut in this case: A polished Gantt chart by itself does not authorize work or validate the business need. It does not show that The project starts with legitimate purpose, decision rights and a benefits basis. The decision can be traced to the review evidence. [R158 R158-Q0248; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
E:The proposed action (Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.) comes from a different Planned strategies and frameworks situation: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. It does not resolve or independently test the stated issue: A proposed reporting tool has a delivery plan but no validated business need, expected benefit or investment authorization. Here, the relevant check is Check sponsor authorization and measurable objectives before releasing major commitments. Reconcile the result with the current approved decision baseline. [R158 R158-Q0248; case R158-C062; CAPM domain 1, task 1.4; source CHARTER.]
Question 249
Which project-management decision best addresses the Benefit-owner-transition situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A process-improvement project closes after training but nobody owns post-closure benefit measurement. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment.
- Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.
- Use the approved communication and decision workflow for safety exceptions, recording the request and outcome. Document impacted stakeholders and the decision owner at the review.
- Closing the project removes neither the need nor the ownership of continuing benefit evaluation.
Explanation
Correct Answer
A:The case evidence identifies A process-improvement project closes after training but nobody owns post-closure benefit measurement. The specified decision directly addresses it: Assign the operational benefit owner and measurement schedule during transition to business-as-usual. Record the rationale before the next commitment. This can be checked using Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit. [R158 R158-Q0249; case R158-C063; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
B:The proposed action (Follow the documented trigger and contingency response, then communicate exceptions through the response chain. Document impacted stakeholders and the decision owner at the review.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A process-improvement project closes after training but nobody owns post-closure benefit measurement. Here, the relevant check is Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit. [R158 R158-Q0249; case R158-C063; CAPM domain 1, task 1.4; source CHARTER.]
C:This option concerns a different Planned strategies and frameworks situation: A vendor requests a critical safety waiver through an informal chat even though the project defines formal escalation and approval authority. For the reported case, use this verification: Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit.
D:This is a tempting but unsupported shortcut in this case: Closing the project removes neither the need nor the ownership of continuing benefit evaluation. It does not show that The organization can track whether the intended outcome continues after the project team disbands. The result is recorded in the project controls. [R158 R158-Q0249; case R158-C063; CAPM domain 1, task 1.4; source CHARTER.]
Question 250
After a corrective decision on Benefit-owner-transition, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A process-improvement project closes after training but nobody owns post-closure benefit measurement. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit.
- Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.
- Compare outage telemetry with the trigger and the execution log for the approved contingency. Retain the initiating evidence for audit.
- Closing the project removes neither the need nor the ownership of continuing benefit evaluation.
Explanation
Correct Answer
A:This checks the actual mechanism rather than merely declaring success: Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit. The desired observed result is The organization can track whether the intended outcome continues after the project team disbands. The result is recorded in the project controls. [R158 R158-Q0250; case R158-C063; CAPM domain 1, task 1.4; source CHARTER.]
Incorrect Answers
B:The proposed verify (Compare outage telemetry with the trigger and the execution log for the approved contingency. Reconcile the result with the current approved decision baseline.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A process-improvement project closes after training but nobody owns post-closure benefit measurement. Here, the relevant check is Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit. [R158 R158-Q0250; case R158-C063; CAPM domain 1, task 1.4; source CHARTER.]
C:The proposed verify (Compare outage telemetry with the trigger and the execution log for the approved contingency. Retain the initiating evidence for audit.) comes from a different Planned strategies and frameworks situation: A preapproved backup data center should activate if connectivity exceeds an agreed outage threshold, but the team debates the action during the outage. It does not resolve or independently test the stated issue: A process-improvement project closes after training but nobody owns post-closure benefit measurement. Here, the relevant check is Review the accepted benefits plan and handover responsibilities for the post-project period. Retain the initiating evidence for audit. [R158 R158-Q0250; case R158-C063; CAPM domain 1, task 1.4; source CHARTER.]
D:This is a tempting but unsupported shortcut in this case: Closing the project removes neither the need nor the ownership of continuing benefit evaluation. It does not show that The organization can track whether the intended outcome continues after the project team disbands. The result is recorded in the project controls. [R158 R158-Q0250; case R158-C063; CAPM domain 1, task 1.4; source CHARTER.]