PMI PMP Shared Vision and Project Outcomes Practice Test

 

Topic 01 covers shared vision and project outcomes for the PMI Project Management Professional (PMP) certification. These original scenarios apply the July 2026 exam objectives across predictive, agile and hybrid projects. Use the stated constraints to select one answer unless the question specifies otherwise. For broader preparation, visit the PMP Exam Dumps page. Each option has an explanation of its role in the decision.

Question 1

A service redesign is described as making customer support faster. Operations interprets this as shorter calls, while customer experience wants fewer repeat contacts. Both teams are meeting their local targets, but complaints are increasing. What should the project manager do first?

  1. Agree jointly on the customer outcome and compatible success measures.
  2. Treat the complaint trend as an operational issue outside the redesign project.
  3. Combine both departmental targets into the status report and continue the existing work.
  4. Ask operations to increase its call-duration target until complaints return to the previous level.
  5. Use the sponsor’s preferred departmental measure as the sole project success criterion.

Correct Answer: A

 

Correct Answer

Answer A is correct because the teams are optimizing different interpretations of the same goal. Agreeing on the intended customer result gives them a basis for deciding which measures can coexist.

Incorrect Answers

Answer B is incorrect because the complaints are evidence that the project’s competing success definitions may be harming the intended result. Dismissing them prevents the team from testing its shared purpose.

Answer C is incorrect because reporting both measures makes the conflict visible but does not resolve whether their incentives support the intended customer outcome.

Answer D is incorrect because changing one target before understanding the competing outcomes assumes that call duration caused the complaints. The underlying disagreement about success would remain.

Answer E is incorrect because a sponsor can resolve priorities, but choosing a departmental measure without examining customer outcomes preserves the local optimization that caused the problem.

 

Question 2

A Scrum Team has four unrelated improvement proposals. Each stakeholder wants a different proposal to become the team’s immediate long-term objective. The Product Owner asks how to retain a coherent direction while considering all four proposals. Which approach best fits Scrum?

  1. Let each Developer choose a preferred proposal and report progress separately.
  2. Ask the Scrum Master to rank the proposals and take ownership of the Product Goal.
  3. Select one Product Goal and order the Product Backlog in support of it.
  4. Create one Product Goal for each stakeholder and require equal progress on all four.
  5. Make the Sprint Backlog a permanent list containing all four long-term objectives.

Correct Answer: C

 

Correct Answer

Answer C is correct because a Product Goal gives the team a common future state. Other proposals can remain visible without becoming simultaneous competing Product Goals.

Incorrect Answers

Answer A is incorrect because individual preferences cannot replace the team’s shared product direction and the Product Owner’s responsibility for backlog ordering.

Answer B is incorrect because the Scrum Master can help the process, but accountability for developing and communicating the Product Goal belongs to the Product Owner.

Answer D is incorrect because simultaneous independent Product Goals divide the team’s direction. Equal stakeholder representation does not establish a coherent product objective.

Answer E is incorrect because the Sprint Backlog supports the current Sprint Goal. It is not the artifact for maintaining several competing long-term product objectives.

 

Question 3

A predictive project was authorized to prepare a product for a market that has now closed to new entrants. The sponsor has not reviewed this development, and the team can still finish the approved deliverables on time. What is the most appropriate next action?

  1. Assess the change in the project’s business rationale and bring options to the sponsor for a decision.
  2. Complete the approved deliverables because the original authorization remains in force.
  3. Replace the target market and rewrite the objectives without involving the sponsor.
  4. Close the project immediately and notify the sponsor after resources have been released.
  5. Ask sales to select a replacement market before raising the loss of the original market with the sponsor.

Correct Answer: A

 

Correct Answer

Answer A is correct because the delivery plan may still be achievable while the original purpose is no longer viable. An evidence-based review lets the authorized decision maker reconsider the project’s direction.

Incorrect Answers

Answer B is incorrect because following the original plan without surfacing the lost market opportunity ignores new evidence about why the project exists.

Answer C is incorrect because a different market may change value, scope and investment assumptions. The project manager should present alternatives rather than unilaterally redefine the authorization.

Answer D is incorrect because the facts warrant reassessment, but they do not give the project manager authority to make the investment or closure decision alone.

Answer E is incorrect because sales input could inform alternatives, but selecting a replacement before the sponsor reviews the changed rationale presumes a new direction. The authorized decision maker needs the evidence and options promptly.

 

Question 4

The agreed vision is to reduce customer onboarding time without reducing identity-check accuracy. Before the team compares solution designs, which TWO additions would make this vision usable as a decision standard? Choose TWO.

  1. Define the onboarding-time baseline, target and measurement interval.
  2. Require every department to use its existing definition of onboarding completion.
  3. Agree on the minimum identity-check accuracy that designs must preserve.
  4. Replace the outcome statement with a list of screens to be delivered.
  5. Select the lowest-price vendor before measuring current performance.

Correct Answers: A, C

 

Correct Answers

Answer A is correct because a quantified baseline and target let the team distinguish meaningful improvement from a vague claim of greater speed.

Answer C is correct because the accuracy boundary expresses the explicit condition attached to faster onboarding. Designs can then be evaluated against both parts of the vision.

Incorrect Answers

Answer B is incorrect because inconsistent definitions make timing comparisons unreliable. A common measure is needed to judge the shared outcome.

Answer D is incorrect because a screen list describes outputs. It does not specify whether customers finish onboarding faster while identity checks remain accurate.

Answer E is incorrect because price alone does not establish either the speed target or the required accuracy. It would prematurely select a solution without a decision standard.

 

Question 5

A new sponsor joins a project halfway through delivery. She asks why the team excluded a feature that appears commercially attractive. The exclusion supported a documented goal of reducing complexity for first-time users, and there is no new market evidence yet. What should the project manager do first?

  1. Prepare a feature change request before discussing the original exclusion with the new sponsor.
  2. Reject the question because the previous sponsor already approved the exclusion.
  3. Add the feature to demonstrate responsiveness to the new sponsor’s preferences.
  4. Explain the agreed outcome, evidence and recorded tradeoff to the sponsor.
  5. Ask the development team to vote on whether the feature should be restored.

Correct Answer: D

 

Correct Answer

Answer D is correct because the immediate gap is the sponsor’s understanding of an existing decision. Reviewing its rationale allows an informed discussion before assuming the direction should change.

Incorrect Answers

Answer A is incorrect because a change request may become appropriate after an informed discussion. The sponsor has asked why the exclusion occurred, so its documented rationale should be understood before assuming that a reversal is requested.

Answer B is incorrect because earlier approval does not remove the need to establish shared understanding with a new sponsor or reconsider decisions if new evidence emerges.

Answer C is incorrect because the question does not establish that the sponsor requested or approved a scope change. Immediate addition could reverse a deliberate outcome-based tradeoff.

Answer E is incorrect because a team preference vote does not address the sponsor’s missing business context or explain why the exclusion supported the agreed outcome.

 

Question 6

After a vision workshop, distributed teams all repeat the phrase reliable self-service. One team interprets reliability as system availability; another interprets it as resolving requests without staff intervention. Which action most directly tests whether the teams actually share the same understanding?

  1. Compare each team’s existing reliability trend from the previous quarter.
  2. Publish a detailed glossary and ask both teams to acknowledge the definitions.
  3. Send the workshop slides again and ask everyone to confirm receipt.
  4. Compare the teams’ decisions on identical sample customer cases.
  5. Ask each team to define reliability locally and use its preferred measure.

Correct Answer: D

 

Correct Answer

Answer D is correct because applying the phrase to concrete cases exposes differences that repetition can hide. The teams can then agree on what successful self-service means in practice.

Incorrect Answers

Answer A is incorrect because the historical trends use the competing interpretations already identified. Comparing them cannot establish common understanding until the teams agree what successful self-service means.

Answer B is incorrect because a glossary can support clarification, but acknowledgment still does not test how teams apply the definitions. Comparing decisions on identical cases exposes whether the same words lead to different choices.

Answer C is incorrect because receipt confirms distribution, not a consistent interpretation of reliability or the resulting design choices.

Answer E is incorrect because local definitions may be useful inputs, but proceeding with different meanings does not test or establish agreement on the common outcome.

 

Question 7

A project’s approved vision is to improve access to public services. A team member argues that the vision authorizes adding a new service channel even though the channel is outside the approved scope and budget. How should the project manager respond?

  1. Authorize the channel because any improvement in access is already covered by the vision.
  2. Deliver the channel using contingency resources and seek approval after launch.
  3. Defer the proposal until closure because the current baseline already supports the original vision.
  4. Evaluate vision alignment, then use the scope and funding decision process.
  5. Ask the sponsor to add the new channel to the vision statement before assessing its delivery impact.

Correct Answer: D

 

Correct Answer

Answer D is correct because the vision explains why a change may be valuable, but it does not itself grant scope or spending authority. The proposal still needs the appropriate evaluation and authorization.

Incorrect Answers

Answer A is incorrect because a broad intended outcome cannot authorize every possible implementation. Scope and funding commitments remain relevant.

Answer B is incorrect because contingency resources do not create blanket authority for an out-of-scope addition. Retrospective approval exposes the project to an unauthorized commitment.

Answer C is incorrect because a fixed end-of-project review can miss a worthwhile change during delivery. The proposal should be evaluated through the applicable process rather than excluded solely by timing.

Answer E is incorrect because a vision revision alone does not evaluate the channel’s scope, resources or funding. Its contribution to access and its delivery implications belong in the relevant decision process.

 

Question 8

A laboratory project aims to reduce annual energy use while preserving operating hours. After a pilot, comparable records show total energy use fell by 12%, but operating hours fell by 15%. Which TWO conclusions follow from these figures? Choose TWO.

  1. The 12% fall in total energy use demonstrates that both project outcomes were achieved.
  2. Energy use per operating hour increased by approximately 3.5%.
  3. Energy use per operating hour decreased by 12%.
  4. The pilot has not met the requirement to preserve laboratory operating hours.
  5. The figures prove that the equipment itself became less energy efficient.
  6. Energy use per operating hour decreased by exactly 3%.

Correct Answers: B, D

 

Correct Answers

Answer B is correct because the normalized ratio is 0.88 divided by 0.85, or about 1.035. Each operating hour therefore used approximately 3.5% more energy than before.

Answer D is correct because operating hours fell by 15%, while the vision requires them to be preserved. Lower total energy use does not compensate for that unmet condition.

Incorrect Answers

Answer A is incorrect because the total-energy measure improved, but operating hours were not preserved. The joint vision requires both outcomes.

Answer C is incorrect because that percentage describes total energy use. It cannot also represent energy per hour when the number of operating hours changed.

Answer E is incorrect because the ratio increased, but these aggregate figures do not isolate equipment performance from workload mix, fixed consumption or other influences. They cannot establish that specific cause.

Answer F is incorrect because subtracting the two percentage changes does not calculate the new ratio. Dividing the energy ratio by the hours ratio shows an increase instead.

 

Question 9

An AI pilot can generate draft responses quickly, but staff spend substantial time correcting them. The team proposes a vision of deploying a leading AI assistant. Which replacement statement most clearly expresses the business outcome the project should validate?

  1. Install the assistant in every support location before the next quarter.
  2. Reduce the time needed to produce an accurate, approved customer response.
  3. Reduce the assistant’s generation latency while retaining the existing correction and approval workflow.
  4. Use the model with the highest public benchmark score available.
  5. Generate the largest possible number of drafts per employee each day.

Correct Answer: B

 

Correct Answer

Answer B is correct because the statement focuses on the useful end result, including correction and approval effort. It allows the pilot to be judged on service improvement rather than technology deployment.

Incorrect Answers

Answer A is incorrect because deployment coverage and timing describe delivery outputs. They do not show whether corrected, approved responses become faster.

Answer C is incorrect because generation latency is only one part of the customer-response process. The observed correction effort may dominate elapsed time, so this narrower target does not establish the useful end-to-end outcome.

Answer D is incorrect because a general benchmark does not establish performance on the organization’s customer cases or the staff effort required for approval.

Answer E is incorrect because draft volume can rise while correction work increases. It does not capture the full response process described in the scenario.

 

Question 10

A program review finds that a project’s planned deliverable is still technically feasible, but the customer group it was intended to help no longer uses the relevant service. The project has already spent 60% of its budget. What should guide the next recommendation?

  1. Compare the percentage of tasks completed with the percentage of budget consumed.
  2. The remaining investment and the value that credible future outcomes could still provide.
  3. The original vision statement, which should remain fixed once funding is approved.
  4. The need to spend the remaining budget so the earlier expenditure is not wasted.
  5. The team’s confidence that the original deliverable can still be completed.

Correct Answer: B

 

Correct Answer

Answer B is correct because money already spent cannot establish a continuing customer need. The decision should consider prospective costs and benefits under the changed circumstances.

Incorrect Answers

Answer A is incorrect because that comparison can inform delivery performance, but it does not establish whether the disappearing customer need leaves a worthwhile future outcome. The recommendation requires prospective value and remaining investment.

Answer C is incorrect because a vision must be reconsidered when the assumptions supporting its value change. Approval is not evidence that those assumptions remain true.

Answer D is incorrect because additional spending does not recover sunk expenditure. It needs a current justification based on a useful future outcome.

Answer E is incorrect because technical feasibility matters, but it does not restore the missing customer use that justified the deliverable.

 

Question 11

A team agrees that a redesign succeeds only if average completion time falls from 10 minutes to 6 minutes or less and the error rate stays at or below 2%. Tests use the same case mix and measurement method. Which pilot meets both agreed criteria?

  1. Average completion time of 6.0 minutes with a 2.1% error rate.
  2. Average completion time of 5.0 minutes with a 2.4% error rate.
  3. Average completion time of 5.8 minutes with a 1.7% error rate.
  4. Average completion time of 7.0 minutes with a 0.8% error rate.
  5. Average completion time of 6.2 minutes with a 1.0% error rate.

Correct Answer: C

 

Correct Answer

Answer C is correct because 5.8 minutes is within the six-minute ceiling and 1.7% is within the two-percent error ceiling. Both conditions are met using comparable measurements.

Incorrect Answers

Answer A is incorrect because the completion time meets the boundary exactly, but 2.1% still exceeds the error ceiling.

Answer B is incorrect because the pilot is fast enough but exceeds the maximum error rate. The vision requires both results rather than speed alone.

Answer D is incorrect because the low error rate is favorable, but the completion time remains above the agreed limit.

Answer E is incorrect because the error rate meets its limit, but 6.2 minutes exceeds the agreed time ceiling. Strong accuracy does not compensate for the missed time criterion.

 

Question 12

A cross-functional project has a clear goal but no agreed way to resolve design tradeoffs. Its vision workshop is intended to establish direction, not select a supplier or authorize spending. Which THREE outputs best support that purpose? Choose THREE.

  1. A concise description of the users or beneficiaries and the outcome sought.
  2. A supplier shortlist ranked by technical fit with the current architecture.
  3. A recorded method for revisiting the vision when significant assumptions change.
  4. Agreed success measures and important constraints for comparing alternatives.
  5. Detailed departmental delivery plans, developed before common success criteria are agreed.
  6. A frozen list of every task that may be performed for the rest of the project.

Correct Answers: A, C, D

 

Correct Answers

Answer A is correct because identifying who should benefit and how gives the group a shared purpose against which proposals can be judged.

Answer C is correct because the group needs a transparent way to reassess direction as evidence changes, rather than silently allowing each function to redefine it.

Answer D is correct because shared measures and boundaries make the intended outcome usable when the team encounters competing designs.

Incorrect Answers

Answer B is incorrect because a shortlist may help a later procurement decision, but it does not establish the common outcome or criteria needed to resolve design tradeoffs. The workshop is explicitly about direction rather than supplier selection.

Answer E is incorrect because delivery plans can be useful later, but preparing them before agreeing on shared criteria risks optimizing incompatible local objectives.

Answer F is incorrect because a vision workshop establishes direction. Freezing all future tasks would confuse shared purpose with detailed, unchangeable execution planning.

 

Question 13

The project vision is to make appointment booking easier for people with limited digital skills. A proposed design reduces the number of screens but requires users to enter technical codes they do not understand. What evidence would best show whether the design supports the vision?

  1. Measure booking completion using experienced support staff as the test participants.
  2. Ask the development team whether the new interface is technically cleaner.
  3. Observe representative users completing realistic bookings and measure their success and difficulty.
  4. Compare the screen count with the count in the previous application.
  5. Verify that the interface uses the latest components in the design library.

Correct Answer: C

 

Correct Answer

Answer C is correct because the intended beneficiaries’ performance directly tests whether booking becomes easier. Fewer screens alone does not establish that result.

Incorrect Answers

Answer A is incorrect because support staff may understand the technical codes that the intended users find difficult. Their performance can test functionality but is not representative evidence that booking is easier for people with limited digital skills.

Answer B is incorrect because internal design quality may matter, but the vision specifically concerns the experience of users with limited digital skills.

Answer D is incorrect because screen count is an implementation characteristic. It can improve while the technical-code requirement makes the user’s task harder.

Answer E is incorrect because component currency does not show that the intended users understand the booking process or can complete it.

 

Question 14

A team’s sprint demonstration is praised because every planned feature works. Usage evidence shows that the target users still abandon the process at the same point as before. Which conclusion is best supported?

  1. The project vision has been achieved because the planned features were delivered.
  2. Prioritize change-adoption training as the explanation for unchanged abandonment.
  3. Recommend replacing the solution before investigating why users still abandon the process.
  4. The team should add more features before collecting further user evidence.
  5. The features work; the intended user outcome remains unproven.

Correct Answer: E

 

Correct Answer

Answer E is correct because functional completion and useful outcomes are different observations. Unchanged abandonment means the team still needs to investigate whether the solution addresses the user problem.

Incorrect Answers

Answer A is incorrect because delivery establishes an output, while the vision concerns the user result. The abandonment evidence does not support that broader conclusion.

Answer B is incorrect because adoption support may help if knowledge or behavior is the barrier, but the evidence does not yet identify that cause. A working feature can still be difficult, irrelevant or poorly integrated into the user’s task.

Answer C is incorrect because unchanged abandonment warrants investigation, but it does not establish that replacement is required. A design, access or adoption issue may be correctable within the working capabilities.

Answer D is incorrect because additional output is not a justified response until the cause of abandonment is understood.

 

Question 15

A partner organization joins a project after the vision has been agreed. Its representatives will make important design recommendations. Which TWO actions best help integrate them into the common direction? Choose TWO.

  1. Explain the outcome and the reasoning behind major existing tradeoffs.
  2. Explain the vision at the first design review after the partner has prepared its recommendations.
  3. Send the approved vision minutes and obtain sign-off before inviting questions about prior decisions.
  4. Ask them to identify assumptions or constraints that their organization sees differently.
  5. Let the partner define a separate project outcome for its own workstream.

Correct Answers: A, D

 

Correct Answers

Answer A is correct because new participants need the rationale as well as the final wording so that their recommendations can support the same intended result.

Answer D is correct because checking their perspective can expose a material mismatch early, allowing the group to address it explicitly instead of assuming agreement.

Incorrect Answers

Answer B is incorrect because waiting until recommendations exist makes avoidable rework more likely. The partner needs the outcome and tradeoff rationale while forming those recommendations, not only when presenting them.

Answer C is incorrect because records and sign-off provide a useful reference, but postponing questions can conceal differences in assumptions. Early explanation and an opportunity to challenge understanding are needed before the partner recommends designs.

Answer E is incorrect because an independent outcome can create competing design decisions. Local responsibilities should remain connected to the shared purpose.

 

Question 16

A project vision says improve access for all eligible users. Early research included only urban customers, and a rural-user group now reports unreliable connectivity. No scope change has been authorized. What should the project manager do next?

  1. Record unreliable connectivity as a risk and continue until the rural group submits a formal change request.
  2. Change the vision to urban users so the current design remains aligned.
  3. Promise an offline capability before assessing feasibility or requirements.
  4. Assume that successful urban testing proves the solution works for all eligible users.
  5. Examine the access assumption with the affected users and assess implications for the agreed outcome.

Correct Answer: E

 

Correct Answer

Answer E is correct because the new evidence may reveal that the current design excludes part of the intended audience. Assessing the gap allows any needed proposal to be made through the proper decision process.

Incorrect Answers

Answer A is incorrect because a risk entry may preserve the observation, but waiting for a change request leaves a known gap in the evidence about eligible users. Examining the access assumption is necessary before deciding whether a scope change is needed.

Answer B is incorrect because narrowing the beneficiaries to fit the solution would redefine success without examining or authorizing the tradeoff.

Answer C is incorrect because a solution commitment is premature. The group first needs to understand the access problem and evaluate alternatives.

Answer D is incorrect because the unreliable-connectivity condition was not tested in the original sample, so that conclusion would exceed the evidence.

 

Question 17

Two project workstreams agree that reducing handoff delays is the priority. One starts measuring delay when it submits work; the other starts when it accepts work into its queue. Their reports show different improvement levels. What should happen before the reports are used to judge the shared vision?

  1. Average the two percentages to produce one project-level improvement figure.
  2. Agree on the handoff boundary and recalculate the measures using the same definition.
  3. Let the sponsor choose a preferred workstream’s result without explaining the difference.
  4. Use the metric from the workstream with the larger sample without adjusting its definition.
  5. Publish both percentages with a note and postpone a common definition until the next project phase.

Correct Answer: B

 

Correct Answer

Answer B is correct because different start points can describe different delays. Comparable definitions are necessary before the team can infer whether the common outcome improved.

Incorrect Answers

Answer A is incorrect because averaging incompatible measures does not correct their different boundaries and may produce a misleading result.

Answer C is incorrect because the sponsor needs the measurement limitation to make an informed judgment. Preference cannot establish comparability.

Answer D is incorrect because a larger sample can reduce random variation, but it does not make different start and end boundaries measure the same outcome.

Answer E is incorrect because disclosure is useful but does not make incompatible boundaries comparable. The measures need reconciliation before they are used to judge the shared outcome, rather than deferring that prerequisite.

 

Question 18

A team is delivering a safety-reporting system. A stakeholder suggests that the project vision should promise zero incidents across the company, although the project controls reporting capability rather than every operational activity. Which revision gives the team the clearest accountable direction?

  1. Make each operational unit solely responsible for interpreting what success means.
  2. Improve timely reporting and follow-up of incidents, with agreed measures of reporting and response.
  3. Use the company-wide incident rate as the sole measure of project success.
  4. Reduce all company incidents by the same percentage as faster incident reporting.
  5. Define success only as completion of the software installation checklist.

Correct Answer: B

 

Correct Answer

Answer B is correct because the direction links the project’s capability to an intended improvement it can influence and measure. It avoids implying control over every cause of an operational incident.

Incorrect Answers

Answer A is incorrect because separate interpretations would prevent the team from measuring progress toward a common reporting outcome.

Answer C is incorrect because company-wide incident frequency depends on operational activities beyond the project’s control. It can provide context, but it should not replace accountable measures of reporting and follow-up capability.

Answer D is incorrect because reporting speed may support a better response, but it does not establish a proportional reduction in incidents across operations. The vision should identify reporting and follow-up results the project can influence and measure.

Answer E is incorrect because installation is an output. It omits the reporting and follow-up behavior that should make the capability useful.

 

Question 19

At the start of a hybrid project, the sponsor and delivery team agree on the vision. Which TWO practices most directly keep that direction useful during delivery? Choose TWO.

  1. Keep the vision separate from backlog and design discussions to avoid bias.
  2. Refer to the agreed outcome when reviewing significant design tradeoffs.
  3. Review vision alignment only when the final deliverables are submitted for acceptance.
  4. Revisit key assumptions at agreed review points and when material evidence changes.
  5. Reopen the entire vision at every iteration even when its supporting assumptions remain unchanged.

Correct Answers: B, D

 

Correct Answers

Answer B is correct because using the vision in actual decisions keeps it connected to delivery rather than leaving it as an unused initiation statement.

Answer D is correct because a useful direction must remain connected to the conditions that justify it. Explicit review supports adaptation without arbitrary changes.

Incorrect Answers

Answer A is incorrect because the intended outcome should inform those discussions. Excluding it leaves prioritization disconnected from the project’s purpose.

Answer C is incorrect because a final review may reveal misalignment too late to guide the design and prioritization decisions made during delivery.

Answer E is incorrect because frequent delivery inspection is useful, but routinely reopening stable direction can create arbitrary churn. Vision review should respond to agreed review points and material evidence rather than assume every iteration requires a new purpose.

 

Question 20

A new initiative is described as replacing the legacy platform. Before detailed planning, the sponsor asks whether this is enough to serve as a project vision. Which response is most useful?

  1. Complete platform selection first so the vision can be based on the chosen product’s strongest features.
  2. Accept the statement because any newer platform will necessarily create business value.
  3. Combine the technical leads’ component-replacement milestones into the vision statement.
  4. Define success by migrating every legacy component to the selected platform version.
  5. Clarify the business or user improvement that replacement is intended to produce.

Correct Answer: E

 

Correct Answer

Answer E is correct because replacement names a chosen output or approach. Understanding the desired improvement gives the team a basis for evaluating whether that approach and later choices are worthwhile.

Incorrect Answers

Answer A is incorrect because selecting a solution before clarifying its intended improvement can make the vision rationalize a purchase. Purpose is needed beforehand to judge whether those features address a worthwhile business or user outcome.

Answer B is incorrect because newness does not establish a useful outcome. The replacement could leave the underlying user or operational problem unchanged.

Answer C is incorrect because milestones describe the work and outputs to be delivered. Consolidating them does not explain the shared improvement that should justify replacement and guide tradeoffs.

Answer D is incorrect because migration coverage describes delivery completion, but it does not explain the business or user improvement sought. That outcome is needed to judge whether the replacement and its design choices are worthwhile.

 

Question 21

A product has an agreed goal of reducing failed first purchases. A dashboard highlights total account registrations, which are rising, while failed first purchases remain unchanged. Which change would best align the review with the goal?

  1. Keep registrations as the headline measure and discuss purchase failures only after launch.
  2. Replace the purchase goal with registration growth because that trend is easier to measure.
  3. Increase the registration target because rising registrations prove the goal is being achieved.
  4. Replace both measures with the number of completed development tasks.
  5. Make successful first-purchase completion a primary measure and use registrations as supporting context.

Correct Answer: E

 

Correct Answer

Answer E is correct because the goal concerns completion of a purchase, not merely entry into the funnel. The primary measure should track that outcome while retaining useful contextual information.

Incorrect Answers

Answer A is incorrect because the project already has outcome evidence that can guide decisions. Deferring it would keep the main review focused on an incomplete proxy.

Answer B is incorrect because measurement convenience does not justify changing the agreed customer outcome. Registration growth can occur without successful first purchases.

Answer C is incorrect because more registrations do not establish fewer failed first purchases. The observed failure measure remains unchanged.

Answer D is incorrect because task counts are further removed from the customer outcome and cannot demonstrate purchase success.

 

Question 22

A vision workshop ends with apparent agreement. Later, anonymous feedback shows that several participants accepted the wording because they believed dissent was unwelcome. Which TWO actions best improve the reliability of the agreement? Choose TWO.

  1. Count the signatures on the workshop minutes as proof that the vision is shared.
  2. Test the proposed direction against realistic tradeoffs and record unresolved differences.
  3. Invite only department heads to confirm that the workshop represented their teams.
  4. Repeat the anonymous approval survey until the wording reaches a preset acceptance percentage.
  5. Resolve the concerns through an immediate majority vote on the existing wording.
  6. Create a facilitated opportunity to surface concerns without personal criticism.

Correct Answers: B, F

 

Correct Answers

Answer B is correct because concrete choices show whether apparent agreement extends to decisions. Recording remaining differences prevents silence from being treated as resolution.

Answer F is correct because the reported barrier is the safety of expressing disagreement. A respectful process helps reveal concerns that the earlier public agreement concealed.

Incorrect Answers

Answer A is incorrect because signatures do not resolve the evidence that participants felt unable to disagree.

Answer C is incorrect because department heads may provide useful context, but their confirmation does not address the reported pressure that stopped participants from expressing concerns.

Answer D is incorrect because repeated polling can measure stated support but does not address suppressed concerns or test decisions under tradeoffs. A numerical threshold cannot by itself establish that disagreement has been understood and resolved.

Answer E is incorrect because a vote may choose wording without uncovering the underlying assumptions or restoring participants’ ability to challenge them.

 

Question 23

During a predictive project, an approved change introduces a new customer segment. The scope baseline has been updated, but the vision materials still describe only the original users. What should the project manager do?

  1. Publish the approved scope notice and leave the vision materials for the next annual refresh.
  2. Reopen the entire project authorization solely because a communication document is outdated.
  3. Update the vision materials to reflect the approved outcome change.
  4. Leave the vision materials untouched because only the scope baseline is controlled.
  5. Ask each workstream to reinterpret the new customer segment independently.

Correct Answer: C

 

Correct Answer

Answer C is correct because the team needs a consistent account of who benefits and why. Updating the communication connects the authorized scope change to the direction used in daily decisions.

Incorrect Answers

Answer A is incorrect because the notice records the decision, but outdated vision materials would still guide daily design choices toward only the original users. The common description should be aligned with the approved change now.

Answer B is incorrect because the scenario already states that the change is approved. The immediate task is to align the supporting direction and communication with that decision.

Answer D is incorrect because inconsistent descriptions can cause teams to continue making choices for the original audience even after the change has been approved.

Answer E is incorrect because independent interpretation risks different assumptions about the changed outcome and does not restore a common vision.

 

Question 24

The sponsor wants a faster internal approval process. Employees say that unclear decisions, rather than elapsed time alone, cause most rework. The project manager must prepare a vision discussion before any solution is selected. Which question would most directly help identify a shared outcome?

  1. Which existing sponsor metric should become mandatory for every team?
  2. What average approval-time target should each department adopt?
  3. Which workflow product has the shortest advertised implementation time?
  4. What employee outcome should improve, and how should it be measured?
  5. Which approval stage should be automated first?

Correct Answer: D

 

Correct Answer

Answer D is correct because the question moves the discussion from a preferred process characteristic to the result that speed and clarity are intended to support.

Incorrect Answers

Answer A is incorrect because standardization can be useful after selecting an appropriate measure, but choosing an existing metric first may preserve the same narrow focus on speed. The shared outcome should determine the metric.

Answer B is incorrect because this assumes that elapsed time is the defining outcome before exploring the rework caused by unclear decisions. It may help later measurement, but the first discussion should establish which employee result should improve.

Answer C is incorrect because this selects an implementation path before the group has agreed on the problem and desired improvement.

Answer E is incorrect because this moves directly to a solution choice. The team has not yet agreed whether faster processing, clearer decisions or another improvement should determine that choice.

 

Question 25

A shared vision states that the project will reduce avoidable rework. Midway through delivery, the team discovers that most measured rework occurs in an upstream process outside its current scope. The sponsor can approve changes. What is the best recommendation?

  1. Take control of the upstream process immediately so the vision can still be achieved.
  2. Continue promising the original reduction because the project team is meeting its own milestones.
  3. Suspend all remaining project work until a detailed redesign of the upstream process is prepared.
  4. Present the evidence and compare options for addressing the upstream dependency or revising the expected outcome.
  5. Track only rework inside the project’s scope and retain the original benefit forecast.

Correct Answer: D

 

Correct Answer

Answer D is correct because the discovery changes the link between planned work and the intended result. The sponsor needs explicit options and consequences rather than an unchanged promise of benefits.

Incorrect Answers

Answer A is incorrect because the project manager does not have stated authority over that process. A change in ownership or scope requires the relevant decision makers.

Answer B is incorrect because local milestone performance does not establish that the project can influence the newly identified source of rework.

Answer C is incorrect because the finding calls for an informed sponsor decision, not an assumption that all useful work must stop. Alternatives may include limited dependency changes or a revised outcome without requiring a complete upstream redesign.

Answer E is incorrect because a narrower tracking boundary would not establish the promised overall reduction. The forecast must reflect the newly identified upstream limitation.

img