Question 410
After a corrective decision on Baseline-control-audit-trail, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Verify the subtractive calculation and distinguish AC from the planned-value baseline. Reconcile the result with the current approved decision baseline.
- Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Reconcile the result with the current approved decision baseline.
- Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit.
- Replacing the baseline after every adverse variance makes the report look favorable but destroys control history.
Explanation
Correct Answer
C:This checks the actual mechanism rather than merely declaring success: Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit. The desired observed result is Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls. [R158 R158-Q0410; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
Incorrect Answers
A:The proposed verify (Verify the subtractive calculation and distinguish AC from the planned-value baseline. Reconcile the result with the current approved decision baseline.) comes from a different Predictive project controls situation: A construction update reports EV=$64,000 and AC=$72,000. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit. [R158 R158-Q0410; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
B:The proposed verify (Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Reconcile the result with the current approved decision baseline.) comes from a different Predictive project controls situation: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit. [R158 R158-Q0410; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
D:This is a tempting but unsupported shortcut in this case: Replacing the baseline after every adverse variance makes the report look favorable but destroys control history. It does not show that Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls. [R158 R158-Q0410; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
Question 411
Which statement most accurately flags a misleading shortcut to avoid in this Baseline-control-audit-trail case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit.
- Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls.
- Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Record the rationale before the next commitment.
- Replacing the baseline after every adverse variance makes the report look favorable but destroys control history.
Explanation
Correct Answer
D:The shortcut is mistaken: Replacing the baseline after every adverse variance makes the report look favorable but destroys control history. The appropriate response is to maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Record the rationale before the next commitment.
Incorrect Answers
A:This is an appropriate independent test of the proposed decision: Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit. It is not the invalid shortcut.
B:This is a relevant outcome to seek after the decision: Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls. It is not an unsupported assumption.
C:This is a supported decision, not the unsupported claim: Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Record the rationale before the next commitment. It responds to the actual project issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent.
Question 412
Select THREE consistent elements of the Baseline-control-audit-trail case: appropriate decision, verification, and observable success condition. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- The cost dashboard shows 80 cents of earned value per dollar of actual cost. The decision can be traced to the review evidence.
- Calculate cost variance CV=EV−AC=−$8,000 and identify an unfavorable cost position. Record the rationale before the next commitment.
- Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Record the rationale before the next commitment.
- Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls.
- Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit.
- Replacing the baseline after every adverse variance makes the report look favorable but destroys control history.
Explanation
Correct Answer
C:The case evidence identifies A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. The specified decision directly addresses it: Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Record the rationale before the next commitment. This can be checked using Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit. [R158 R158-Q0412; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
D:The stated result demonstrates the case acceptance condition: Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls. It depends on the decision Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Record the rationale before the next commitment.
E:This checks the actual mechanism rather than merely declaring success: Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit. The desired observed result is Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls. [R158 R158-Q0412; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
Incorrect Answers
A:This option concerns a different Predictive project controls situation: A controlled work package has EV=$120,000 and AC=$150,000 at review. For the reported case, use this verification: Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit.
B:The proposed action (Calculate cost variance CV=EV−AC=−$8,000 and identify an unfavorable cost position. Record the rationale before the next commitment.) comes from a different Predictive project controls situation: A construction update reports EV=$64,000 and AC=$72,000. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Retain the initiating evidence for audit. [R158 R158-Q0412; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
F:This is a tempting but unsupported shortcut in this case: Replacing the baseline after every adverse variance makes the report look favorable but destroys control history. It does not show that Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls. [R158 R158-Q0412; case R158-C103; CAPM domain 2, task 2.3; source ECO.]
Question 413
Which project-management decision best addresses the Baseline-control-audit-trail situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Replacing the baseline after every adverse variance makes the report look favorable but destroys control history.
- Calculate cost variance CV=EV−AC=−$8,000 and identify an unfavorable cost position. Record the rationale before the next commitment.
- Compute SPI=EV/PV=0.80 and recognize an unfavorable planned-versus-earned progress ratio. Record the rationale before the next commitment.
- Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review.
Explanation
Correct Answer
D:The case evidence identifies A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. The specified decision directly addresses it: Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. [R158 R158-Q0413; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: Replacing the baseline after every adverse variance makes the report look favorable but destroys control history. It does not show that Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence. [R158 R158-Q0413; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
B:The proposed action (Calculate cost variance CV=EV−AC=−$8,000 and identify an unfavorable cost position. Record the rationale before the next commitment.) comes from a different Predictive project controls situation: A construction update reports EV=$64,000 and AC=$72,000. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. [R158 R158-Q0413; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
C:The proposed action (Compute SPI=EV/PV=0.80 and recognize an unfavorable planned-versus-earned progress ratio. Record the rationale before the next commitment.) comes from a different Predictive project controls situation: A supplier-installation stream has EV=$56,000 and PV=$70,000 for the same status date. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. [R158 R158-Q0413; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
Question 414
After a corrective decision on Baseline-control-audit-trail, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Replacing the baseline after every adverse variance makes the report look favorable but destroys control history.
- Verify the subtractive calculation and distinguish AC from the planned-value baseline. Retain the initiating evidence for audit.
- Verify 56,000÷70,000=0.80 using matched status dates and budgeted values. Retain the initiating evidence for audit.
- Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline.
Explanation
Correct Answer
D:This checks the actual mechanism rather than merely declaring success: Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. The desired observed result is Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence. [R158 R158-Q0414; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: Replacing the baseline after every adverse variance makes the report look favorable but destroys control history. It does not show that Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence. [R158 R158-Q0414; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
B:The proposed verify (Verify the subtractive calculation and distinguish AC from the planned-value baseline. Retain the initiating evidence for audit.) comes from a different Predictive project controls situation: A construction update reports EV=$64,000 and AC=$72,000. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. [R158 R158-Q0414; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
C:The proposed verify (Verify 56,000÷70,000=0.80 using matched status dates and budgeted values. Retain the initiating evidence for audit.) comes from a different Predictive project controls situation: A supplier-installation stream has EV=$56,000 and PV=$70,000 for the same status date. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. [R158 R158-Q0414; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
Question 415
Which statement most accurately flags a misleading shortcut to avoid in this Baseline-control-audit-trail case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline.
- Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review.
- Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence.
- Replacing the baseline after every adverse variance makes the report look favorable but destroys control history.
Explanation
Correct Answer
D:The shortcut is mistaken: Replacing the baseline after every adverse variance makes the report look favorable but destroys control history. The appropriate response is to maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:This is an appropriate independent test of the proposed decision: Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.
B:This is a supported decision, not the unsupported claim: Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent.
C:This is a relevant outcome to seek after the decision: Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence. It is not an unsupported assumption.
Question 416
Select THREE consistent elements of the Baseline-control-audit-trail case: appropriate decision, verification, and observable success condition. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Replacing the baseline after every adverse variance makes the report look favorable but destroys control history.
- Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review.
- Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline.
- The cost dashboard shows 80 cents of earned value per dollar of actual cost. The result is recorded in the project controls.
- Compute SPI=EV/PV=0.80 and recognize an unfavorable planned-versus-earned progress ratio. Document impacted stakeholders and the decision owner at the review.
- Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence.
Explanation
Correct Answer
B:The case evidence identifies A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. The specified decision directly addresses it: Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. [R158 R158-Q0416; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
C:This checks the actual mechanism rather than merely declaring success: Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. The desired observed result is Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence. [R158 R158-Q0416; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
F:The stated result demonstrates the case acceptance condition: Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence. It depends on the decision Maintain version-controlled, formally approved baselines and compare performance to the baseline authorized for the reporting period. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: Replacing the baseline after every adverse variance makes the report look favorable but destroys control history. It does not show that Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence. [R158 R158-Q0416; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
D:This option concerns a different Predictive project controls situation: A controlled work package has EV=$120,000 and AC=$150,000 at review. For the reported case, use this verification: Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline.
E:The proposed action (Compute SPI=EV/PV=0.80 and recognize an unfavorable planned-versus-earned progress ratio. Document impacted stakeholders and the decision owner at the review.) comes from a different Predictive project controls situation: A supplier-installation stream has EV=$56,000 and PV=$70,000 for the same status date. It does not resolve or independently test the stated issue: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. Here, the relevant check is Inspect change authorization, baseline effective dates and reconciliation of reported values. Reconcile the result with the current approved decision baseline. [R158 R158-Q0416; case R158-C104; CAPM domain 2, task 2.3; source ECO.]
Question 417
Which project-management decision best addresses the Cost-and-schedule-separation situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Compute SPI=EV/PV=0.80 and recognize an unfavorable planned-versus-earned progress ratio. Document impacted stakeholders and the decision owner at the review.
- Report favorable CV=+$15k and unfavorable SV=−$20k as separate facts requiring different explanations. Record the rationale before the next commitment.
- Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures.
- Compute CPI=EV/AC=0.80 and flag spending inefficiency rather than claiming a 20% calendar slip. Record the rationale before the next commitment.
Explanation
Correct Answer
B:Report favorable CV=+$15k and unfavorable SV=−$20k as separate facts requiring different explanations. Record the rationale before the next commitment. To verify the specified result, calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit.
Incorrect Answers
A:The proposed action (Compute SPI=EV/PV=0.80 and recognize an unfavorable planned-versus-earned progress ratio. Document impacted stakeholders and the decision owner at the review.) comes from a different Predictive project controls situation: A supplier-installation stream has EV=$56,000 and PV=$70,000 for the same status date. It does not resolve or independently test the stated issue: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Here, the relevant check is Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit. [R158 R158-Q0417; case R158-C105; CAPM domain 2, task 2.3; source EVM.]
C:This is a tempting but unsupported shortcut in this case: Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures. It does not show that Decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls. [R158 R158-Q0417; case R158-C105; CAPM domain 2, task 2.3; source EVM.]
D:This option concerns a different Predictive project controls situation: A controlled work package has EV=$120,000 and AC=$150,000 at review. For the reported case, use this verification: Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit.
Question 418
After a corrective decision on Cost-and-schedule-separation, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Verify the subtractive calculation and distinguish AC from the planned-value baseline. Retain the initiating evidence for audit.
- Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit.
- Verify 56,000÷70,000=0.80 using matched status dates and budgeted values. Reconcile the result with the current approved decision baseline.
- Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures.
Explanation
Correct Answer
B:Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit. The expected result is decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls.
Incorrect Answers
A:This option concerns a different Predictive project controls situation: A construction update reports EV=$64,000 and AC=$72,000. For the reported case, use this verification: Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit.
C:The proposed verify (Verify 56,000÷70,000=0.80 using matched status dates and budgeted values. Reconcile the result with the current approved decision baseline.) comes from a different Predictive project controls situation: A supplier-installation stream has EV=$56,000 and PV=$70,000 for the same status date. It does not resolve or independently test the stated issue: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Here, the relevant check is Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit. [R158 R158-Q0418; case R158-C105; CAPM domain 2, task 2.3; source EVM.]
D:This is a tempting but unsupported shortcut in this case: Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures. It does not show that Decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls. [R158 R158-Q0418; case R158-C105; CAPM domain 2, task 2.3; source EVM.]
Question 419
Which statement most accurately flags a misleading shortcut to avoid in this Cost-and-schedule-separation case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Report favorable CV=+$15k and unfavorable SV=−$20k as separate facts requiring different explanations. Record the rationale before the next commitment.
- Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures.
- Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit.
- Decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls.
Explanation
Correct Answer
B:The shortcut is mistaken: Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures. The appropriate response is to report favorable CV=+$15k and unfavorable SV=−$20k as separate facts requiring different explanations. Record the rationale before the next commitment.
Incorrect Answers
A:This is a supported decision, not the unsupported claim: Report favorable CV=+$15k and unfavorable SV=−$20k as separate facts requiring different explanations. Record the rationale before the next commitment. It responds to the actual project issue: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable.
C:This is an appropriate independent test of the proposed decision: Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit. It is not the invalid shortcut.
D:This is a relevant outcome to seek after the decision: Decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls. It is not an unsupported assumption.
Question 420
Which observed result supports acceptance of the Cost-and-schedule-separation corrective decision ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls.
- Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence.
- Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures.
- Decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls.
Explanation
Correct Answer
D:The stated result demonstrates the case acceptance condition: Decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls. It depends on the decision Report favorable CV=+$15k and unfavorable SV=−$20k as separate facts requiring different explanations. Record the rationale before the next commitment.
Incorrect Answers
A:The proposed outcome (Reviewers can reproduce variances without silently switching the comparison basis. The result is recorded in the project controls.) comes from a different Predictive project controls situation: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. It does not resolve or independently test the stated issue: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Here, the relevant check is Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit. [R158 R158-Q0420; case R158-C105; CAPM domain 2, task 2.3; source EVM.]
B:The proposed outcome (Reviewers can reproduce variances without silently switching the comparison basis. The decision can be traced to the review evidence.) comes from a different Predictive project controls situation: A cost report has three revised target budgets but no approvals or dates, making variance comparisons inconsistent. It does not resolve or independently test the stated issue: A team records EV=$180k, AC=$165k and PV=$200k but announces the project is simply ahead because spending is favorable. Here, the relevant check is Calculate EV−AC=+15 and EV−PV=−20 (thousands) before interpreting performance. Retain the initiating evidence for audit. [R158 R158-Q0420; case R158-C105; CAPM domain 2, task 2.3; source EVM.]
C:This is a tempting but unsupported shortcut in this case: Using a favorable cost variance to declare the project ahead of schedule conflates two independent measures. It does not show that Decision makers see spending efficiency and schedule progress separately instead of a misleading single status. The result is recorded in the project controls. [R158 R158-Q0420; case R158-C105; CAPM domain 2, task 2.3; source EVM.]