PMI CAPM Exam Dumps, Practice Test Questions

100% Latest & Updated PMI CAPM Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!

PMI CAPM Premium Bundle
$79.97
$59.98

CAPM Premium Bundle

  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates

CAPM Premium Bundle

PMI CAPM Premium Bundle
  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates
$79.97
$59.98

PMI CAPM Practice Test 9

Question 80

Which observed result supports acceptance of the Risk-response-matching corrective decision ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A supplier may miss a future delivery date; the team has named a backup supplier but has not set a trigger or response owner. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Leaders receive accurate status and can choose a response based on real progress. The decision can be traced to the review evidence.
  2. The team can activate the contingency before the potential delay causes avoidable downstream impact. The decision can be traced to the review evidence.
  3. Waiting for a missed shipment and then calling it mitigation loses the opportunity to respond to a future risk.
  4. The team adjusts the product on evidence without treating every learning cycle as an uncontrolled baseline breach. The result is recorded in the project controls.

Explanation

Correct Answer

B:

The stated result demonstrates the case acceptance condition: The team can activate the contingency before the potential delay causes avoidable downstream impact. The decision can be traced to the review evidence. It depends on the decision Record the uncertain event with probability, impact, early trigger, owner and contingent sourcing response. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This option concerns a different Project life cycles and processes situation: An integration milestone is late, but a lead asks for a green status to prevent executive scrutiny. For the reported case, use this verification: Verify the risk register links the delivery trigger to a named response and procurement lead time. Reconcile the result with the current approved decision baseline.

C:

This is a tempting but unsupported shortcut in this case: Waiting for a missed shipment and then calling it mitigation loses the opportunity to respond to a future risk. It does not show that The team can activate the contingency before the potential delay causes avoidable downstream impact. The decision can be traced to the review evidence. [R158 R158-Q0080; case R158-C020; CAPM domain 1, task 1.1; source ECO.]

D:

The proposed outcome (The team adjusts the product on evidence without treating every learning cycle as an uncontrolled baseline breach. The result is recorded in the project controls.) comes from a different Project life cycles and processes situation: A benefits portal team has disputed eligibility rules and expects monthly feedback that will change interface behavior. It does not resolve or independently test the stated issue: A supplier may miss a future delivery date; the team has named a backup supplier but has not set a trigger or response owner. Here, the relevant check is Verify the risk register links the delivery trigger to a named response and procurement lead time. Reconcile the result with the current approved decision baseline. [R158 R158-Q0080; case R158-C020; CAPM domain 1, task 1.1; source ECO.]

Question 81

Which project-management decision best addresses the Value-delivery-boundary situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  2. Report the actual milestone variance with evidence, root cause and a credible recovery proposal. Document impacted stakeholders and the decision owner at the review.
  3. Clarify intended outcomes and benefits separately from the individual solution outputs. Record the rationale before the next commitment.
  4. Clarify the documented product boundary and route the proposed payroll addition through the agreed change evaluation. Record the rationale before the next commitment.

Explanation

Correct Answer

C:

The case evidence identifies A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. The specified decision directly addresses it: Clarify intended outcomes and benefits separately from the individual solution outputs. Record the rationale before the next commitment. This can be checked using Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit. [R158 R158-Q0081; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Counting screens completed as an automatic financial benefit confuses output volume with realized value. It does not show that Delivered functionality is linked to a measurable organizational improvement. The result is recorded in the project controls. [R158 R158-Q0081; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

B:

This option concerns a different Project life cycles and processes situation: An integration milestone is late, but a lead asks for a green status to prevent executive scrutiny. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit.

D:

This option concerns a different Project life cycles and processes situation: A school scheduling rollout includes student enrollment but excludes payroll integration; a manager requests payroll features without a change decision. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit.

Question 82

After a corrective decision on Value-delivery-boundary, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit.
  2. Check transition ownership, staff readiness criteria and post-rollout benefit measurements. Retain the initiating evidence for audit.
  3. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  4. Inspect conflict declarations and the documented impartial scoring or substitution process. Retain the initiating evidence for audit.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit. The desired observed result is Delivered functionality is linked to a measurable organizational improvement. The result is recorded in the project controls. [R158 R158-Q0082; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

B:

The proposed verify (Check transition ownership, staff readiness criteria and post-rollout benefit measurements. Retain the initiating evidence for audit.) comes from a different Project life cycles and processes situation: A health system installs a new triage tool but does not assign anyone to transition daily workflows or support staff adoption. It does not resolve or independently test the stated issue: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Here, the relevant check is Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit. [R158 R158-Q0082; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

C:

This is a tempting but unsupported shortcut in this case: Counting screens completed as an automatic financial benefit confuses output volume with realized value. It does not show that Delivered functionality is linked to a measurable organizational improvement. The result is recorded in the project controls. [R158 R158-Q0082; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

D:

This option concerns a different Project life cycles and processes situation: A project evaluator has a close financial interest in a vendor under consideration but plans to score proposals without telling the review panel. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit.

Question 83

Which statement most accurately flags a misleading shortcut to avoid in this Value-delivery-boundary case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Delivered functionality is linked to a measurable organizational improvement. The result is recorded in the project controls.
  2. Clarify intended outcomes and benefits separately from the individual solution outputs. Record the rationale before the next commitment.
  3. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  4. Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit.

Explanation

Correct Answer

C:

The shortcut is mistaken: Counting screens completed as an automatic financial benefit confuses output volume with realized value. The appropriate response is to clarify intended outcomes and benefits separately from the individual solution outputs. Record the rationale before the next commitment.

Incorrect Answers

A:

This is a relevant outcome to seek after the decision: Delivered functionality is linked to a measurable organizational improvement. The result is recorded in the project controls. It is not an unsupported assumption.

B:

This is a supported decision, not the unsupported claim: Clarify intended outcomes and benefits separately from the individual solution outputs. Record the rationale before the next commitment. It responds to the actual project issue: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time.

D:

This is an appropriate independent test of the proposed decision: Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit. It is not the invalid shortcut.

Question 84

Select TWO case-specific elements of a justified Value-delivery-boundary resolution : the decision and its direct evidence. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  2. Check transition ownership, staff readiness criteria and post-rollout benefit measurements. Reconcile the result with the current approved decision baseline.
  3. Clarify intended outcomes and benefits separately from the individual solution outputs. Record the rationale before the next commitment.
  4. Use an adaptive discovery and delivery approach with frequent validation of changing rules instead of freezing all details at initiation. Document impacted stakeholders and the decision owner at the review.
  5. Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit.

Explanation

Correct Answer

C:

The case evidence identifies A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. The specified decision directly addresses it: Clarify intended outcomes and benefits separately from the individual solution outputs. Record the rationale before the next commitment. This can be checked using Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit. [R158 R158-Q0084; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

E:

This checks the actual mechanism rather than merely declaring success: Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit. The desired observed result is Delivered functionality is linked to a measurable organizational improvement. The result is recorded in the project controls. [R158 R158-Q0084; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Counting screens completed as an automatic financial benefit confuses output volume with realized value. It does not show that Delivered functionality is linked to a measurable organizational improvement. The result is recorded in the project controls. [R158 R158-Q0084; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

B:

The proposed verify (Check transition ownership, staff readiness criteria and post-rollout benefit measurements. Reconcile the result with the current approved decision baseline.) comes from a different Project life cycles and processes situation: A health system installs a new triage tool but does not assign anyone to transition daily workflows or support staff adoption. It does not resolve or independently test the stated issue: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Here, the relevant check is Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit. [R158 R158-Q0084; case R158-C021; CAPM domain 1, task 1.1; source CHARTER.]

D:

This option concerns a different Project life cycles and processes situation: A benefits portal team has disputed eligibility rules and expects monthly feedback that will change interface behavior. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Retain the initiating evidence for audit.

Question 85

Which project-management decision best addresses the Value-delivery-boundary situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Clarify intended outcomes and benefits separately from the individual solution outputs. Document impacted stakeholders and the decision owner at the review.
  2. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  3. Manage interdependent projects as a program for coordinated benefits while the portfolio still selects investments against strategy. Record the rationale before the next commitment.
  4. Manage interdependent projects as a program for coordinated benefits while the portfolio still selects investments against strategy. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

A:

The case evidence identifies A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. The specified decision directly addresses it: Clarify intended outcomes and benefits separately from the individual solution outputs. Document impacted stakeholders and the decision owner at the review. This can be checked using Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline. [R158 R158-Q0085; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

B:

This is a tempting but unsupported shortcut in this case: Counting screens completed as an automatic financial benefit confuses output volume with realized value. It does not show that Delivered functionality is linked to a measurable organizational improvement. The decision can be traced to the review evidence. [R158 R158-Q0085; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

C:

The proposed action (Manage interdependent projects as a program for coordinated benefits while the portfolio still selects investments against strategy. Record the rationale before the next commitment.) comes from a different Project life cycles and processes situation: A hospital groups linked clinical record, identity, and data-migration projects under one coordinated benefit but reports them as unrelated portfolio investments. It does not resolve or independently test the stated issue: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Here, the relevant check is Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline. [R158 R158-Q0085; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

D:

The proposed action (Manage interdependent projects as a program for coordinated benefits while the portfolio still selects investments against strategy. Document impacted stakeholders and the decision owner at the review.) comes from a different Project life cycles and processes situation: A hospital groups linked clinical record, identity, and data-migration projects under one coordinated benefit but reports them as unrelated portfolio investments. It does not resolve or independently test the stated issue: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Here, the relevant check is Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline. [R158 R158-Q0085; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

Question 86

After a corrective decision on Value-delivery-boundary, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline.
  2. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  3. Check that the redesign charter has an end condition and deliverable while ordinary order processing continues without a project end date. Reconcile the result with the current approved decision baseline.
  4. Inspect conflict declarations and the documented impartial scoring or substitution process. Retain the initiating evidence for audit.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline. The desired observed result is Delivered functionality is linked to a measurable organizational improvement. The decision can be traced to the review evidence. [R158 R158-Q0086; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

B:

This is a tempting but unsupported shortcut in this case: Counting screens completed as an automatic financial benefit confuses output volume with realized value. It does not show that Delivered functionality is linked to a measurable organizational improvement. The decision can be traced to the review evidence. [R158 R158-Q0086; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

C:

This option concerns a different Project life cycles and processes situation: A retail chain is commissioning a one-time warehouse routing redesign but the team wants to fund it as routine monthly order processing. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline.

D:

This option concerns a different Project life cycles and processes situation: A project evaluator has a close financial interest in a vendor under consideration but plans to score proposals without telling the review panel. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline.

Question 87

Which statement most accurately flags a misleading shortcut to avoid in this Value-delivery-boundary case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  2. Clarify intended outcomes and benefits separately from the individual solution outputs. Document impacted stakeholders and the decision owner at the review.
  3. Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline.
  4. Delivered functionality is linked to a measurable organizational improvement. The decision can be traced to the review evidence.

Explanation

Correct Answer

A:

The shortcut is mistaken: Counting screens completed as an automatic financial benefit confuses output volume with realized value. The appropriate response is to clarify intended outcomes and benefits separately from the individual solution outputs. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

B:

This is a supported decision, not the unsupported claim: Clarify intended outcomes and benefits separately from the individual solution outputs. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time.

C:

This is an appropriate independent test of the proposed decision: Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.

D:

This is a relevant outcome to seek after the decision: Delivered functionality is linked to a measurable organizational improvement. The decision can be traced to the review evidence. It is not an unsupported assumption.

Question 88

Select TWO case-specific elements of a justified Value-delivery-boundary resolution : the decision and its direct evidence. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Clarify intended outcomes and benefits separately from the individual solution outputs. Document impacted stakeholders and the decision owner at the review.
  2. Counting screens completed as an automatic financial benefit confuses output volume with realized value.
  3. Report the actual milestone variance with evidence, root cause and a credible recovery proposal. Document impacted stakeholders and the decision owner at the review.
  4. Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline.
  5. Check the issue log for actual date, impact, owner and resolution, and separately inspect future-risk descriptions. Retain the initiating evidence for audit.

Explanation

Correct Answer

A:

The case evidence identifies A sponsor measures the upgrade only by the number of screens delivered even though the business case concerns reduced claims processing time. The specified decision directly addresses it: Clarify intended outcomes and benefits separately from the individual solution outputs. Document impacted stakeholders and the decision owner at the review. This can be checked using Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline. [R158 R158-Q0088; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

D:

This checks the actual mechanism rather than merely declaring success: Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline. The desired observed result is Delivered functionality is linked to a measurable organizational improvement. The decision can be traced to the review evidence. [R158 R158-Q0088; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

B:

This is a tempting but unsupported shortcut in this case: Counting screens completed as an automatic financial benefit confuses output volume with realized value. It does not show that Delivered functionality is linked to a measurable organizational improvement. The decision can be traced to the review evidence. [R158 R158-Q0088; case R158-C022; CAPM domain 1, task 1.1; source CHARTER.]

C:

This option concerns a different Project life cycles and processes situation: An integration milestone is late, but a lead asks for a green status to prevent executive scrutiny. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline.

E:

This option concerns a different Project life cycles and processes situation: A conveyor has already failed in system testing but a status report lists the failure as a future possibility with only a probability score. For the reported case, use this verification: Compare approved benefit measures with baseline and after-release processing times. Reconcile the result with the current approved decision baseline.

Question 89

Which project-management decision best addresses the Change-authorization-separation situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment.
  2. Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
  3. Record the uncertain event with probability, impact, early trigger, owner and contingent sourcing response. Document impacted stakeholders and the decision owner at the review.
  4. Clarify the documented product boundary and route the proposed payroll addition through the agreed change evaluation. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

A:

The case evidence identifies During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. The specified decision directly addresses it: Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment. This can be checked using Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. [R158 R158-Q0089; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

B:

This is a tempting but unsupported shortcut in this case: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. It does not show that The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. [R158 R158-Q0089; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]

C:

The proposed action (Record the uncertain event with probability, impact, early trigger, owner and contingent sourcing response. Document impacted stakeholders and the decision owner at the review.) comes from a different Project life cycles and processes situation: A supplier may miss a future delivery date; the team has named a backup supplier but has not set a trigger or response owner. It does not resolve or independently test the stated issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Here, the relevant check is Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. [R158 R158-Q0089; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]

D:

The proposed action (Clarify the documented product boundary and route the proposed payroll addition through the agreed change evaluation. Document impacted stakeholders and the decision owner at the review.) comes from a different Project life cycles and processes situation: A school scheduling rollout includes student enrollment but excludes payroll integration; a manager requests payroll features without a change decision. It does not resolve or independently test the stated issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Here, the relevant check is Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. [R158 R158-Q0089; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]

Question 90

After a corrective decision on Change-authorization-separation, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Verify the risk register links the delivery trigger to a named response and procurement lead time. Reconcile the result with the current approved decision baseline.
  2. Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
  3. Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit.
  4. Inspect the benefits map and inter-project dependencies, distinguishing program integration from portfolio prioritization. Retain the initiating evidence for audit.

Explanation

Correct Answer

C:

This checks the actual mechanism rather than merely declaring success: Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. The desired observed result is The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. [R158 R158-Q0090; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]

Incorrect Answers

A:

The proposed verify (Verify the risk register links the delivery trigger to a named response and procurement lead time. Reconcile the result with the current approved decision baseline.) comes from a different Project life cycles and processes situation: A supplier may miss a future delivery date; the team has named a backup supplier but has not set a trigger or response owner. It does not resolve or independently test the stated issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Here, the relevant check is Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. [R158 R158-Q0090; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]

B:

This is a tempting but unsupported shortcut in this case: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. It does not show that The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. [R158 R158-Q0090; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]

D:

This option concerns a different Project life cycles and processes situation: A hospital groups linked clinical record, identity, and data-migration projects under one coordinated benefit but reports them as unrelated portfolio investments. For the reported case, use this verification: Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit.

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

UP

SPECIAL OFFER: GET 10% OFF

This is ONE TIME OFFER

ExamSnap Discount Offer
Enter Your Email Address to Receive Your 10% Off Discount Code

A confirmation link will be sent to this email address to verify your login. *We value your privacy. We will not rent or sell your email address.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.