Question 90
After a corrective decision on Change-authorization-separation, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Verify the risk register links the delivery trigger to a named response and procurement lead time. Reconcile the result with the current approved decision baseline.
- Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
- Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit.
- Inspect the benefits map and inter-project dependencies, distinguishing program integration from portfolio prioritization. Retain the initiating evidence for audit.
Explanation
Correct Answer
C:This checks the actual mechanism rather than merely declaring success: Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. The desired observed result is The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. [R158 R158-Q0090; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]
Incorrect Answers
A:The proposed verify (Verify the risk register links the delivery trigger to a named response and procurement lead time. Reconcile the result with the current approved decision baseline.) comes from a different Project life cycles and processes situation: A supplier may miss a future delivery date; the team has named a backup supplier but has not set a trigger or response owner. It does not resolve or independently test the stated issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Here, the relevant check is Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. [R158 R158-Q0090; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]
B:This is a tempting but unsupported shortcut in this case: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. It does not show that The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. [R158 R158-Q0090; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]
D:This option concerns a different Project life cycles and processes situation: A hospital groups linked clinical record, identity, and data-migration projects under one coordinated benefit but reports them as unrelated portfolio investments. For the reported case, use this verification: Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit.
Question 91
Which statement most accurately flags a misleading shortcut to avoid in this Change-authorization-separation case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls.
- Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
- Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit.
- Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment.
Explanation
Correct Answer
B:The shortcut is mistaken: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. The appropriate response is to assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment.
Incorrect Answers
A:This is a relevant outcome to seek after the decision: The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. It is not an unsupported assumption.
C:This is an appropriate independent test of the proposed decision: Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. It is not the invalid shortcut.
D:This is a supported decision, not the unsupported claim: Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment. It responds to the actual project issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance.
Question 92
Select THREE consistent elements of the Change-authorization-separation case: appropriate decision, verification, and observable success condition. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
- Use an adaptive discovery and delivery approach with frequent validation of changing rules instead of freezing all details at initiation. Record the rationale before the next commitment.
- Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit.
- The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls.
- Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment.
- The scope statement and authorized work remain aligned instead of growing through informal requests. The result is recorded in the project controls.
Explanation
Correct Answer
C:This checks the actual mechanism rather than merely declaring success: Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. The desired observed result is The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. [R158 R158-Q0092; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]
D:The stated result demonstrates the case acceptance condition: The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. It depends on the decision Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment.
E:The case evidence identifies During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. The specified decision directly addresses it: Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Record the rationale before the next commitment. This can be checked using Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. [R158 R158-Q0092; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. It does not show that The team implements only changes authorized against objectives, resources and affected commitments. The result is recorded in the project controls. [R158 R158-Q0092; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]
B:This option concerns a different Project life cycles and processes situation: A benefits portal team has disputed eligibility rules and expects monthly feedback that will change interface behavior. For the reported case, use this verification: Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit.
F:The proposed outcome (The scope statement and authorized work remain aligned instead of growing through informal requests. The result is recorded in the project controls.) comes from a different Project life cycles and processes situation: A school scheduling rollout includes student enrollment but excludes payroll integration; a manager requests payroll features without a change decision. It does not resolve or independently test the stated issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Here, the relevant check is Inspect documented approval, impact assessment and updated authorized baseline. Retain the initiating evidence for audit. [R158 R158-Q0092; case R158-C023; CAPM domain 1, task 1.1; source CHARTER.]
Question 93
Which project-management decision best addresses the Change-authorization-separation situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
- Document permit approval as an assumption to validate and the funding ceiling as a constraint to plan within. Record the rationale before the next commitment.
- Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review.
- Clarify the documented product boundary and route the proposed payroll addition through the agreed change evaluation. Document impacted stakeholders and the decision owner at the review.
Explanation
Correct Answer
C:The case evidence identifies During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. The specified decision directly addresses it: Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline. [R158 R158-Q0093; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. It does not show that The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence. [R158 R158-Q0093; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
B:The proposed action (Document permit approval as an assumption to validate and the funding ceiling as a constraint to plan within. Record the rationale before the next commitment.) comes from a different Project life cycles and processes situation: An energy retrofit plan assumes a regulator will approve a permit, while the funding ceiling is a fixed contractual limit. It does not resolve or independently test the stated issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Here, the relevant check is Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline. [R158 R158-Q0093; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
D:This option concerns a different Project life cycles and processes situation: A school scheduling rollout includes student enrollment but excludes payroll integration; a manager requests payroll features without a change decision. For the reported case, use this verification: Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline.
Question 94
After a corrective decision on Change-authorization-separation, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Check transition ownership, staff readiness criteria and post-rollout benefit measurements. Retain the initiating evidence for audit.
- Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline.
- Check the issue log for actual date, impact, owner and resolution, and separately inspect future-risk descriptions. Retain the initiating evidence for audit.
- Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
Explanation
Correct Answer
B:This checks the actual mechanism rather than merely declaring success: Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline. The desired observed result is The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence. [R158 R158-Q0094; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
Incorrect Answers
A:This option concerns a different Project life cycles and processes situation: A health system installs a new triage tool but does not assign anyone to transition daily workflows or support staff adoption. For the reported case, use this verification: Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline.
C:This option concerns a different Project life cycles and processes situation: A conveyor has already failed in system testing but a status report lists the failure as a future possibility with only a probability score. For the reported case, use this verification: Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline.
D:This is a tempting but unsupported shortcut in this case: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. It does not show that The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence. [R158 R158-Q0094; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
Question 95
Which statement most accurately flags a misleading shortcut to avoid in this Change-authorization-separation case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review.
- Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline.
- The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence.
- Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
Explanation
Correct Answer
D:The shortcut is mistaken: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. The appropriate response is to assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review.
Incorrect Answers
A:This is a supported decision, not the unsupported claim: Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance.
B:This is an appropriate independent test of the proposed decision: Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.
C:This is a relevant outcome to seek after the decision: The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence. It is not an unsupported assumption.
Question 96
Select THREE consistent elements of the Change-authorization-separation case: appropriate decision, verification, and observable success condition. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review.
- The temporary redesign is governed as a project and recurring fulfillment remains operations. The decision can be traced to the review evidence.
- Good technical intent alone does not give an engineer the authority to commit additional scope and budget.
- The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence.
- Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline.
- Document permit approval as an assumption to validate and the funding ceiling as a constraint to plan within. Document impacted stakeholders and the decision owner at the review.
Explanation
Correct Answer
A:The case evidence identifies During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. The specified decision directly addresses it: Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline. [R158 R158-Q0096; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
D:The stated result demonstrates the case acceptance condition: The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence. It depends on the decision Assess proposed changes through the project's governance and obtain appropriate authority before adding new scope. Document impacted stakeholders and the decision owner at the review.
E:This checks the actual mechanism rather than merely declaring success: Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline. The desired observed result is The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence. [R158 R158-Q0096; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
Incorrect Answers
B:This option concerns a different Project life cycles and processes situation: A retail chain is commissioning a one-time warehouse routing redesign but the team wants to fund it as routine monthly order processing. For the reported case, use this verification: Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline.
C:This is a tempting but unsupported shortcut in this case: Good technical intent alone does not give an engineer the authority to commit additional scope and budget. It does not show that The team implements only changes authorized against objectives, resources and affected commitments. The decision can be traced to the review evidence. [R158 R158-Q0096; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
F:The proposed action (Document permit approval as an assumption to validate and the funding ceiling as a constraint to plan within. Document impacted stakeholders and the decision owner at the review.) comes from a different Project life cycles and processes situation: An energy retrofit plan assumes a regulator will approve a permit, while the funding ceiling is a fixed contractual limit. It does not resolve or independently test the stated issue: During a factory automation project an engineer begins a new production line without delegated approval because it improves technical performance. Here, the relevant check is Inspect documented approval, impact assessment and updated authorized baseline. Reconcile the result with the current approved decision baseline. [R158 R158-Q0096; case R158-C024; CAPM domain 1, task 1.1; source CHARTER.]
Question 97
Which project-management decision best addresses the Integrated-plan-cost-schedule-link situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Record the rationale before the next commitment.
- Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Document impacted stakeholders and the decision owner at the review.
- Distinguish evolving product direction from the project management plan's execution, governance and control components. Record the rationale before the next commitment.
- Setting cost limits independently of scheduled work hides when project cash and resources are needed.
Explanation
Correct Answer
A:Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Record the rationale before the next commitment. To verify the specified result, compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
Incorrect Answers
B:The proposed action (Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Document impacted stakeholders and the decision owner at the review.) comes from a different Project management planning situation: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. It does not resolve or independently test the stated issue: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Here, the relevant check is Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit. [R158 R158-Q0097; case R158-C025; CAPM domain 1, task 1.2; source ECO.]
C:This option concerns a different Project management planning situation: An application team treats the long-term feature roadmap as if it specified the project's staffing, risks, procurement and change controls. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
D:This is a tempting but unsupported shortcut in this case: Setting cost limits independently of scheduled work hides when project cash and resources are needed. It does not show that Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls. [R158 R158-Q0097; case R158-C025; CAPM domain 1, task 1.2; source ECO.]
Question 98
After a corrective decision on Integrated-plan-cost-schedule-link, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Setting cost limits independently of scheduled work hides when project cash and resources are needed.
- Check agreed thresholds and test evidence against the actual delivered workflow. Retain the initiating evidence for audit.
- Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
- Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline.
Explanation
Correct Answer
C:Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit. The expected result is cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls.
Incorrect Answers
A:This is a tempting but unsupported shortcut in this case: Setting cost limits independently of scheduled work hides when project cash and resources are needed. It does not show that Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls. [R158 R158-Q0098; case R158-C025; CAPM domain 1, task 1.2; source ECO.]
B:This option concerns a different Project management planning situation: A new supplier onboarding flow has an acceptance deadline but no defined accuracy, reliability or performance thresholds. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
D:The proposed verify (Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline.) comes from a different Project management planning situation: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. It does not resolve or independently test the stated issue: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Here, the relevant check is Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit. [R158 R158-Q0098; case R158-C025; CAPM domain 1, task 1.2; source ECO.]
Question 99
Which statement most accurately flags a misleading shortcut to avoid in this Integrated-plan-cost-schedule-link case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Setting cost limits independently of scheduled work hides when project cash and resources are needed.
- Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
- Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Record the rationale before the next commitment.
- Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls.
Explanation
Correct Answer
A:The shortcut is mistaken: Setting cost limits independently of scheduled work hides when project cash and resources are needed. The appropriate response is to integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Record the rationale before the next commitment.
Incorrect Answers
B:This is an appropriate independent test of the proposed decision: Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit. It is not the invalid shortcut.
C:This is a supported decision, not the unsupported claim: Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Record the rationale before the next commitment. It responds to the actual project issue: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs.
D:This is a relevant outcome to seek after the decision: Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls. It is not an unsupported assumption.
Question 100
Which observed result supports acceptance of the Integrated-plan-cost-schedule-link corrective decision ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.
- Decisions occur within required response windows and routine information remains appropriately batched. The decision can be traced to the review evidence.
- Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls.
- Benefit realization can be credibly evaluated instead of inferred from activity or opinions. The result is recorded in the project controls.
- Setting cost limits independently of scheduled work hides when project cash and resources are needed.
Explanation
Correct Answer
B:The stated result demonstrates the case acceptance condition: Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls. It depends on the decision Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Record the rationale before the next commitment.
Incorrect Answers
A:This option concerns a different Project management planning situation: A remote project team sends status slides weekly but keeps missing decisions that require urgent escalation. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
C:This option concerns a different Project management planning situation: A sponsor claims productivity increased after rollout but no pre-rollout baseline exists to compare. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
D:This is a tempting but unsupported shortcut in this case: Setting cost limits independently of scheduled work hides when project cash and resources are needed. It does not show that Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls. [R158 R158-Q0100; case R158-C025; CAPM domain 1, task 1.2; source ECO.]
Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests