PMI CAPM Exam Dumps, Practice Test Questions

100% Latest & Updated PMI CAPM Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!

PMI CAPM Premium Bundle
$79.97
$59.98

CAPM Premium Bundle

  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates

CAPM Premium Bundle

PMI CAPM Premium Bundle
  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates
$79.97
$59.98

PMI CAPM Practice Test 11

Question 100

Which observed result supports acceptance of the Integrated-plan-cost-schedule-link corrective decision ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Decisions occur within required response windows and routine information remains appropriately batched. The decision can be traced to the review evidence.
  2. Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls.
  3. Benefit realization can be credibly evaluated instead of inferred from activity or opinions. The result is recorded in the project controls.
  4. Setting cost limits independently of scheduled work hides when project cash and resources are needed.

Explanation

Correct Answer

B:

The stated result demonstrates the case acceptance condition: Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls. It depends on the decision Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Record the rationale before the next commitment.

Incorrect Answers

A:

This option concerns a different Project management planning situation: A remote project team sends status slides weekly but keeps missing decisions that require urgent escalation. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.

C:

This option concerns a different Project management planning situation: A sponsor claims productivity increased after rollout but no pre-rollout baseline exists to compare. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.

D:

This is a tempting but unsupported shortcut in this case: Setting cost limits independently of scheduled work hides when project cash and resources are needed. It does not show that Cost and schedule views reconcile to the same authorized work and delivery sequence. The result is recorded in the project controls. [R158 R158-Q0100; case R158-C025; CAPM domain 1, task 1.2; source ECO.]

Question 101

Which project-management decision best addresses the Integrated-plan-cost-schedule-link situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Distinguish evolving product direction from the project management plan's execution, governance and control components. Record the rationale before the next commitment.
  2. Identify the stakeholders, document influence and interests, and tailor engagement to each group's legitimate concerns. Document impacted stakeholders and the decision owner at the review.
  3. Setting cost limits independently of scheduled work hides when project cash and resources are needed.
  4. Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

D:

The case evidence identifies A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. The specified decision directly addresses it: Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Document impacted stakeholders and the decision owner at the review. This can be checked using Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline. [R158 R158-Q0101; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

A:

The proposed action (Distinguish evolving product direction from the project management plan's execution, governance and control components. Record the rationale before the next commitment.) comes from a different Project management planning situation: An application team treats the long-term feature roadmap as if it specified the project's staffing, risks, procurement and change controls. It does not resolve or independently test the stated issue: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Here, the relevant check is Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline. [R158 R158-Q0101; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

B:

This option concerns a different Project management planning situation: A regulator and end users receive the same generic project updates despite having different decisions and information needs. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.

C:

This is a tempting but unsupported shortcut in this case: Setting cost limits independently of scheduled work hides when project cash and resources are needed. It does not show that Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence. [R158 R158-Q0101; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

Question 102

After a corrective decision on Integrated-plan-cost-schedule-link, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Setting cost limits independently of scheduled work hides when project cash and resources are needed.
  2. Review whether the entry has a clear event and actionable response with a defined owner. Reconcile the result with the current approved decision baseline.
  3. Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.
  4. Inspect which artifact owns product outcomes and which governs the authorized project delivery. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

C:

This checks the actual mechanism rather than merely declaring success: Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline. The desired observed result is Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence. [R158 R158-Q0102; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Setting cost limits independently of scheduled work hides when project cash and resources are needed. It does not show that Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence. [R158 R158-Q0102; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

B:

This option concerns a different Project management planning situation: A flood exposure is listed only as high risk, with no specific event description, owner or response. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.

D:

The proposed verify (Inspect which artifact owns product outcomes and which governs the authorized project delivery. Reconcile the result with the current approved decision baseline.) comes from a different Project management planning situation: An application team treats the long-term feature roadmap as if it specified the project's staffing, risks, procurement and change controls. It does not resolve or independently test the stated issue: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Here, the relevant check is Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline. [R158 R158-Q0102; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

Question 103

Which statement most accurately flags a misleading shortcut to avoid in this Integrated-plan-cost-schedule-link case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Document impacted stakeholders and the decision owner at the review.
  2. Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence.
  3. Setting cost limits independently of scheduled work hides when project cash and resources are needed.
  4. Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

C:

The shortcut is mistaken: Setting cost limits independently of scheduled work hides when project cash and resources are needed. The appropriate response is to integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a supported decision, not the unsupported claim: Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs.

B:

This is a relevant outcome to seek after the decision: Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence. It is not an unsupported assumption.

D:

This is an appropriate independent test of the proposed decision: Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.

Question 104

Select TWO case-specific elements of a justified Integrated-plan-cost-schedule-link resolution : the decision and its direct evidence. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Document impacted stakeholders and the decision owner at the review.
  2. Review delayed decisions and confirm owners receive time-critical requests through the agreed route. Reconcile the result with the current approved decision baseline.
  3. Plan measurable quality criteria and associated assurance and control activities before final acceptance. Document impacted stakeholders and the decision owner at the review.
  4. Setting cost limits independently of scheduled work hides when project cash and resources are needed.
  5. Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

A:

The case evidence identifies A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. The specified decision directly addresses it: Integrate scope, schedule, resource and cost planning so budgets relate to time-phased work and dependencies. Document impacted stakeholders and the decision owner at the review. This can be checked using Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline. [R158 R158-Q0104; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

E:

This checks the actual mechanism rather than merely declaring success: Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline. The desired observed result is Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence. [R158 R158-Q0104; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

B:

This option concerns a different Project management planning situation: A remote project team sends status slides weekly but keeps missing decisions that require urgent escalation. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.

C:

This option concerns a different Project management planning situation: A new supplier onboarding flow has an acceptance deadline but no defined accuracy, reliability or performance thresholds. For the reported case, use this verification: Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.

D:

This is a tempting but unsupported shortcut in this case: Setting cost limits independently of scheduled work hides when project cash and resources are needed. It does not show that Cost and schedule views reconcile to the same authorized work and delivery sequence. The decision can be traced to the review evidence. [R158 R158-Q0104; case R158-C026; CAPM domain 1, task 1.2; source ECO.]

Question 105

Which project-management decision best addresses the Milestone-versus-duration situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Define audience, decisions, escalation triggers, communication channel, cadence and response expectations in the communication plan. Document impacted stakeholders and the decision owner at the review.
  2. Assigning the entire review duration to the sign-off event obscures the tasks that drive the date.
  3. Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Record the rationale before the next commitment.
  4. Plan measurable quality criteria and associated assurance and control activities before final acceptance. Record the rationale before the next commitment.

Explanation

Correct Answer

C:

The case evidence identifies A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. The specified decision directly addresses it: Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Record the rationale before the next commitment. This can be checked using Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit. [R158 R158-Q0105; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

A:

This option concerns a different Project management planning situation: A remote project team sends status slides weekly but keeps missing decisions that require urgent escalation. For the reported case, use this verification: Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit.

B:

This is a tempting but unsupported shortcut in this case: Assigning the entire review duration to the sign-off event obscures the tasks that drive the date. It does not show that The schedule distinguishes work effort from the decision point marking its completion. The result is recorded in the project controls. [R158 R158-Q0105; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

D:

This option concerns a different Project management planning situation: A new supplier onboarding flow has an acceptance deadline but no defined accuracy, reliability or performance thresholds. For the reported case, use this verification: Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit.

Question 106

After a corrective decision on Milestone-versus-duration, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Assigning the entire review duration to the sign-off event obscures the tasks that drive the date.
  2. Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
  3. Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.
  4. Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit.

Explanation

Correct Answer

D:

This checks the actual mechanism rather than merely declaring success: Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit. The desired observed result is The schedule distinguishes work effort from the decision point marking its completion. The result is recorded in the project controls. [R158 R158-Q0106; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Assigning the entire review duration to the sign-off event obscures the tasks that drive the date. It does not show that The schedule distinguishes work effort from the decision point marking its completion. The result is recorded in the project controls. [R158 R158-Q0106; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

B:

The proposed verify (Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.) comes from a different Project management planning situation: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. It does not resolve or independently test the stated issue: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Here, the relevant check is Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit. [R158 R158-Q0106; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

C:

The proposed verify (Compare the integrated baseline's spending profile with the scheduled procurement packages. Reconcile the result with the current approved decision baseline.) comes from a different Project management planning situation: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. It does not resolve or independently test the stated issue: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Here, the relevant check is Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit. [R158 R158-Q0106; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

Question 107

Which statement most accurately flags a misleading shortcut to avoid in this Milestone-versus-duration case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Assigning the entire review duration to the sign-off event obscures the tasks that drive the date.
  2. Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit.
  3. The schedule distinguishes work effort from the decision point marking its completion. The result is recorded in the project controls.
  4. Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Record the rationale before the next commitment.

Explanation

Correct Answer

A:

The shortcut is mistaken: Assigning the entire review duration to the sign-off event obscures the tasks that drive the date. The appropriate response is to represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Record the rationale before the next commitment.

Incorrect Answers

B:

This is an appropriate independent test of the proposed decision: Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit. It is not the invalid shortcut.

C:

This is a relevant outcome to seek after the decision: The schedule distinguishes work effort from the decision point marking its completion. The result is recorded in the project controls. It is not an unsupported assumption.

D:

This is a supported decision, not the unsupported claim: Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Record the rationale before the next commitment. It responds to the actual project issue: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event.

Question 108

Select TWO case-specific elements of a justified Milestone-versus-duration resolution : the decision and its direct evidence. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Assess resource availability and level or resequence the conflicting assignments before committing schedule dates. Record the rationale before the next commitment.
  2. Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Record the rationale before the next commitment.
  3. Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit.
  4. Assigning the entire review duration to the sign-off event obscures the tasks that drive the date.
  5. Inspect the stakeholder register and communication mapping for the regulator's approvals and users' feedback channels. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

B:

The case evidence identifies A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. The specified decision directly addresses it: Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Record the rationale before the next commitment. This can be checked using Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit. [R158 R158-Q0108; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

C:

This checks the actual mechanism rather than merely declaring success: Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit. The desired observed result is The schedule distinguishes work effort from the decision point marking its completion. The result is recorded in the project controls. [R158 R158-Q0108; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

A:

This option concerns a different Project management planning situation: A rollout assigns the same specialist simultaneously to two full-time integrations although the plan assumes no resource bottleneck. For the reported case, use this verification: Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit.

D:

This is a tempting but unsupported shortcut in this case: Assigning the entire review duration to the sign-off event obscures the tasks that drive the date. It does not show that The schedule distinguishes work effort from the decision point marking its completion. The result is recorded in the project controls. [R158 R158-Q0108; case R158-C027; CAPM domain 1, task 1.2; source ECO.]

E:

This option concerns a different Project management planning situation: A regulator and end users receive the same generic project updates despite having different decisions and information needs. For the reported case, use this verification: Inspect the schedule network for a milestone event after its review and remediation activities. Retain the initiating evidence for audit.

Question 109

Which project-management decision best addresses the Milestone-versus-duration situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Document impacted stakeholders and the decision owner at the review.
  2. Assess resource availability and level or resequence the conflicting assignments before committing schedule dates. Record the rationale before the next commitment.
  3. Plan measurable quality criteria and associated assurance and control activities before final acceptance. Document impacted stakeholders and the decision owner at the review.
  4. Assigning the entire review duration to the sign-off event obscures the tasks that drive the date.

Explanation

Correct Answer

A:

The case evidence identifies A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. The specified decision directly addresses it: Represent the approval as a zero-duration milestone and model the review work as predecessor activities with realistic durations. Document impacted stakeholders and the decision owner at the review. This can be checked using Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline. [R158 R158-Q0109; case R158-C028; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

B:

The proposed action (Assess resource availability and level or resequence the conflicting assignments before committing schedule dates. Record the rationale before the next commitment.) comes from a different Project management planning situation: A rollout assigns the same specialist simultaneously to two full-time integrations although the plan assumes no resource bottleneck. It does not resolve or independently test the stated issue: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Here, the relevant check is Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline. [R158 R158-Q0109; case R158-C028; CAPM domain 1, task 1.2; source ECO.]

C:

The proposed action (Plan measurable quality criteria and associated assurance and control activities before final acceptance. Document impacted stakeholders and the decision owner at the review.) comes from a different Project management planning situation: A new supplier onboarding flow has an acceptance deadline but no defined accuracy, reliability or performance thresholds. It does not resolve or independently test the stated issue: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Here, the relevant check is Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline. [R158 R158-Q0109; case R158-C028; CAPM domain 1, task 1.2; source ECO.]

D:

This is a tempting but unsupported shortcut in this case: Assigning the entire review duration to the sign-off event obscures the tasks that drive the date. It does not show that The schedule distinguishes work effort from the decision point marking its completion. The decision can be traced to the review evidence. [R158 R158-Q0109; case R158-C028; CAPM domain 1, task 1.2; source ECO.]

Question 110

After a corrective decision on Milestone-versus-duration, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline.
  2. Compare resource histograms and actual capacity with the revised activity timing. Reconcile the result with the current approved decision baseline.
  3. Compare the integrated baseline's spending profile with the scheduled procurement packages. Retain the initiating evidence for audit.
  4. Assigning the entire review duration to the sign-off event obscures the tasks that drive the date.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline. The desired observed result is The schedule distinguishes work effort from the decision point marking its completion. The decision can be traced to the review evidence. [R158 R158-Q0110; case R158-C028; CAPM domain 1, task 1.2; source ECO.]

Incorrect Answers

B:

The proposed verify (Compare resource histograms and actual capacity with the revised activity timing. Reconcile the result with the current approved decision baseline.) comes from a different Project management planning situation: A rollout assigns the same specialist simultaneously to two full-time integrations although the plan assumes no resource bottleneck. It does not resolve or independently test the stated issue: A sponsor requests a four-week duration for a regulatory sign-off milestone that represents a single approval event. Here, the relevant check is Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline. [R158 R158-Q0110; case R158-C028; CAPM domain 1, task 1.2; source ECO.]

C:

This option concerns a different Project management planning situation: A regional construction plan has a cost forecast but no connection between procurement milestones and when spending occurs. For the reported case, use this verification: Inspect the schedule network for a milestone event after its review and remediation activities. Reconcile the result with the current approved decision baseline.

D:

This is a tempting but unsupported shortcut in this case: Assigning the entire review duration to the sign-off event obscures the tasks that drive the date. It does not show that The schedule distinguishes work effort from the decision point marking its completion. The decision can be traced to the review evidence. [R158 R158-Q0110; case R158-C028; CAPM domain 1, task 1.2; source ECO.]

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

UP

SPECIAL OFFER: GET 10% OFF

This is ONE TIME OFFER

ExamSnap Discount Offer
Enter Your Email Address to Receive Your 10% Off Discount Code

A confirmation link will be sent to this email address to verify your login. *We value your privacy. We will not rent or sell your email address.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.