100% Latest & Updated Juniper JN0-364 Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!
Question 190
The receiving LSDB contains an LSP from the originator yet the missing prefix is absent from the expected reachability TLV. Independently, the review flags the potentially unsafe practice “Declare installation guaranteed simply because an LSP packet was received”. Which validation addresses the risk without assuming a particular cause?
- Search only Level 1 data for a prefix advertised solely through Level 2
- Inspect route table entry and protocol install reason
- Inspect IP reachability TLVs in the originator's LSP
- Inspect LSP sequence, checksum and lifetime information
Explanation
Correct Answer
B:Received LSDB content does not alone prove active route. An advertised prefix still needs valid SPF and install conditions.
Incorrect Answers
A:Wrong database level can conceal valid reachability.
C:An LSP identifier alone does not establish that a destination was advertised.
D:Current LSP versions are needed for consistent SPF calculations.
Question 191
A metro ring gains a low-latency link but traffic continues on an older path because operational IS-IS metrics were not updated. The objective is to review per-interface metrics. Which Junos configuration or design action best satisfies the objective?
- Mark tuning complete merely because adjacency stays Up
- Inspect effective IS-IS interface metrics on every candidate segment
- Compare Level 1 metric to a Level 2 path as interchangeable without context
- Select an exit solely because its last-hop metric is smallest
Explanation
Correct Answer
B:SPF uses advertised link costs to select paths.
Incorrect Answers
A:A healthy neighbor does not prove the desired path selection.
C:Different IS-IS scopes have separate routing meanings.
D:Total cost includes all relevant links.
Question 192
A metro ring gains a low-latency link but traffic continues on an older path because operational IS-IS metrics were not updated. The objective is to calculate cumulative cost. Which operational choice should be prioritized in this design?
- Mark tuning complete merely because adjacency stays Up
- Choose the best path solely by the newest physical interface timestamp
- Compare Level 1 metric to a Level 2 path as interchangeable without context
- Compute total IS-IS path cost across each candidate route
Explanation
Correct Answer
D:A single cheap link does not determine whole-path cost.
Incorrect Answers
A:A healthy neighbor does not prove the desired path selection.
B:Creation time is not an SPF cost factor.
C:Different IS-IS scopes have separate routing meanings.
Question 193
A metro ring gains a low-latency link but traffic continues on an older path because operational IS-IS metrics were not updated. The objective is to check level and topology context. Which routing or switching control best fits the requirement?
- Choose the best path solely by the newest physical interface timestamp
- Mark tuning complete merely because adjacency stays Up
- Select an exit solely because its last-hop metric is smallest
- Evaluate the correct IS-IS level and supported topology when comparing routes
Explanation
Correct Answer
D:Level-specific routes can differ across regional boundaries.
Incorrect Answers
A:Creation time is not an SPF cost factor.
B:A healthy neighbor does not prove the desired path selection.
C:Total cost includes all relevant links.
Question 194
A metro ring gains a low-latency link but traffic continues on an older path because operational IS-IS metrics were not updated. The objective is to validate traffic after tuning. Which verification should be performed before approving the change?
- Confirm route choice and egress counters after controlled metric changes
- Select an exit solely because its last-hop metric is smallest
- Compare Level 1 metric to a Level 2 path as interchangeable without context
- Choose the best path solely by the newest physical interface timestamp
Explanation
Correct Answer
A:Effective engineering requires both RIB and forwarding validation.
Incorrect Answers
B:Total cost includes all relevant links.
C:Different IS-IS scopes have separate routing meanings.
D:Creation time is not an SPF cost factor.
Question 195
A metro ring gains a low-latency link but traffic continues on an older path because operational IS-IS metrics were not updated. Two objectives apply: (1) calculate cumulative cost; and (2) validate traffic after tuning. Which TWO controls together satisfy the requirements? Choose TWO.
- Mark tuning complete merely because adjacency stays Up
- Confirm route choice and egress counters after controlled metric changes
- Compare Level 1 metric to a Level 2 path as interchangeable without context
- Compute total IS-IS path cost across each candidate route
- Select an exit solely because its last-hop metric is smallest
Explanation
Correct Answers
B:Effective engineering requires both RIB and forwarding validation.
D:A single cheap link does not determine whole-path cost.
Incorrect Answers
A:A healthy neighbor does not prove the desired path selection.
C:Different IS-IS scopes have separate routing meanings.
E:Total cost includes all relevant links.
Question 196
A metro ring gains a low-latency link but traffic continues on an older path because operational IS-IS metrics were not updated. Three objectives apply: (1) calculate cumulative cost; (2) check level and topology context; and (3) validate traffic after tuning. Which THREE controls together satisfy the requirements? Choose THREE.
- Compute total IS-IS path cost across each candidate route
- Confirm route choice and egress counters after controlled metric changes
- Evaluate the correct IS-IS level and supported topology when comparing routes
- Select an exit solely because its last-hop metric is smallest
- Compare Level 1 metric to a Level 2 path as interchangeable without context
- Choose the best path solely by the newest physical interface timestamp
Explanation
Correct Answers
A:A single cheap link does not determine whole-path cost.
B:Effective engineering requires both RIB and forwarding validation.
C:Level-specific routes can differ across regional boundaries.
Incorrect Answers
D:Total cost includes all relevant links.
E:Different IS-IS scopes have separate routing meanings.
F:Creation time is not an SPF cost factor.
Question 197
The link is healthy and adjacency is Up, yet selected paths do not match the engineered design after metric migration. Independently, the review flags the potentially unsafe practice “Choose the best path solely by the newest physical interface timestamp”. Which inspection best evaluates that practice?
- Compare interface metrics in the LSDB
- Compare summed SPF costs for each path
- Compare Level 1 metric to a Level 2 path as interchangeable without context
- Check active route next hop and egress flow after tuning
Explanation
Correct Answer
A:Creation time is not an SPF cost factor. SPF uses advertised link costs to select paths.
Incorrect Answers
B:A single cheap link does not determine whole-path cost.
C:Different IS-IS scopes have separate routing meanings.
D:Effective engineering requires both RIB and forwarding validation.
Question 198
The link is healthy and adjacency is Up, yet selected paths do not match the engineered design after metric migration. Independently, the review flags the potentially unsafe practice “Select an exit solely because its last-hop metric is smallest”. Which evidence most directly tests the flagged assumption?
- Compare interface metrics in the LSDB
- Compare Level 1 metric to a Level 2 path as interchangeable without context
- Check active route next hop and egress flow after tuning
- Compare summed SPF costs for each path
Explanation
Correct Answer
D:Total cost includes all relevant links. A single cheap link does not determine whole-path cost.
Incorrect Answers
A:SPF uses advertised link costs to select paths.
B:Different IS-IS scopes have separate routing meanings.
C:Effective engineering requires both RIB and forwarding validation.
Question 199
The link is healthy and adjacency is Up, yet selected paths do not match the engineered design after metric migration. Independently, the review flags the potentially unsafe practice “Compare Level 1 metric to a Level 2 path as interchangeable without context”. Which diagnostic check tests this potentially unsafe choice?
- Select an exit solely because its last-hop metric is smallest
- Inspect per-level selected routes and topology identifiers
- Compare interface metrics in the LSDB
- Check active route next hop and egress flow after tuning
Explanation
Correct Answer
B:Different IS-IS scopes have separate routing meanings. Level-specific routes can differ across regional boundaries.
Incorrect Answers
A:Total cost includes all relevant links.
C:SPF uses advertised link costs to select paths.
D:Effective engineering requires both RIB and forwarding validation.
Question 200
The link is healthy and adjacency is Up, yet selected paths do not match the engineered design after metric migration. Independently, the review flags the potentially unsafe practice “Mark tuning complete merely because adjacency stays Up”. Which validation addresses the risk without assuming a particular cause?
- Select an exit solely because its last-hop metric is smallest
- Check active route next hop and egress flow after tuning
- Inspect per-level selected routes and topology identifiers
- Compare interface metrics in the LSDB
Explanation
Correct Answer
B:A healthy neighbor does not prove the desired path selection. Effective engineering requires both RIB and forwarding validation.
Incorrect Answers
A:Total cost includes all relevant links.
C:Level-specific routes can differ across regional boundaries.
D:SPF uses advertised link costs to select paths.
Service Provider Routing and Switching, Specialist (JNCIS-SP) (JN0-364) Practice Tests