PMI CAPM Exam Dumps, Practice Test Questions

100% Latest & Updated PMI CAPM Practice Test Questions, Exam Dumps & Verified Answers!
30 Days Free Updates, Instant Download!

PMI CAPM Premium Bundle
$79.97
$59.98

CAPM Premium Bundle

  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates

CAPM Premium Bundle

PMI CAPM Premium Bundle
  • Premium File: 688 Questions & Answers. Last update: Nov 2, 2026
  • Training Course: 123 Video Lectures
  • Study Guide: 719 Pages
  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates
$79.97
$59.98

PMI CAPM Practice Test 38

Question 370

After a corrective decision on Quality-control-threshold, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance.
  2. Inspect the WBS for bounded packages and the network for appropriately sized activities tied to them. Reconcile the result with the current approved decision baseline.
  3. Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit.
  4. Trace work packages to scoped audit deliverables and identify the accountable control or acceptance point. Retain the initiating evidence for audit.

Explanation

Correct Answer

C:

This checks the actual mechanism rather than merely declaring success: Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. The desired observed result is Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls. [R158 R158-Q0370; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance. It does not show that Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls. [R158 R158-Q0370; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

B:

The proposed verify (Inspect the WBS for bounded packages and the network for appropriately sized activities tied to them. Reconcile the result with the current approved decision baseline.) comes from a different Predictive project schedule and methods situation: A project team schedules the whole data-center migration as one eight-month activity without decomposing its scoped work package into executable tasks. It does not resolve or independently test the stated issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Here, the relevant check is Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. [R158 R158-Q0370; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

D:

The proposed verify (Trace work packages to scoped audit deliverables and identify the accountable control or acceptance point. Retain the initiating evidence for audit.) comes from a different Predictive project schedule and methods situation: A project WBS has vague headings such as weekly calls and team morale but lacks identifiable deliverables for the security audit. It does not resolve or independently test the stated issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Here, the relevant check is Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. [R158 R158-Q0370; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

Question 371

Which statement most accurately flags a misleading shortcut to avoid in this Quality-control-threshold case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Record the rationale before the next commitment.
  2. A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance.
  3. Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit.
  4. Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls.

Explanation

Correct Answer

B:

The shortcut is mistaken: A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance. The appropriate response is to apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Record the rationale before the next commitment.

Incorrect Answers

A:

This is a supported decision, not the unsupported claim: Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Record the rationale before the next commitment. It responds to the actual project issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork.

C:

This is an appropriate independent test of the proposed decision: Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. It is not the invalid shortcut.

D:

This is a relevant outcome to seek after the decision: Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls. It is not an unsupported assumption.

Question 372

Select THREE consistent elements of the Quality-control-threshold case: appropriate decision, verification, and observable success condition. During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance.
  2. The WBS covers authorized outputs without mistaking recurring meetings for the deliverables themselves. The decision can be traced to the review evidence.
  3. Compute total float as late start minus early start, giving four days under the stated unconstrained network. Document impacted stakeholders and the decision owner at the review.
  4. Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls.
  5. Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit.
  6. Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Record the rationale before the next commitment.

Explanation

Correct Answer

D:

The stated result demonstrates the case acceptance condition: Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls. It depends on the decision Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Record the rationale before the next commitment.

E:

This checks the actual mechanism rather than merely declaring success: Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. The desired observed result is Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls. [R158 R158-Q0372; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

F:

The case evidence identifies A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. The specified decision directly addresses it: Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Record the rationale before the next commitment. This can be checked using Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. [R158 R158-Q0372; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance. It does not show that Quality evidence demonstrates whether delivered units meet the defined requirement. The result is recorded in the project controls. [R158 R158-Q0372; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

B:

The proposed outcome (The WBS covers authorized outputs without mistaking recurring meetings for the deliverables themselves. The decision can be traced to the review evidence.) comes from a different Predictive project schedule and methods situation: A project WBS has vague headings such as weekly calls and team morale but lacks identifiable deliverables for the security audit. It does not resolve or independently test the stated issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Here, the relevant check is Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. [R158 R158-Q0372; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

C:

The proposed action (Compute total float as late start minus early start, giving four days under the stated unconstrained network. Document impacted stakeholders and the decision owner at the review.) comes from a different Predictive project schedule and methods situation: An activity can start no earlier than project day 5 but can start as late as day 9 without delaying the current network completion. It does not resolve or independently test the stated issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Here, the relevant check is Review sample size, critical defect count and the agreed acceptance limit. Retain the initiating evidence for audit. [R158 R158-Q0372; case R158-C093; CAPM domain 2, task 2.2; source ECO.]

Question 373

Which project-management decision best addresses the Quality-control-threshold situation ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Evaluate the integrated impact on scope, schedule, cost, interfaces and approvals before altering baselines. Document impacted stakeholders and the decision owner at the review.
  2. Compute total float as late start minus early start, giving four days under the stated unconstrained network. Record the rationale before the next commitment.
  3. A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance.
  4. Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

D:

The case evidence identifies A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. The specified decision directly addresses it: Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review. This can be checked using Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline. [R158 R158-Q0373; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

Incorrect Answers

A:

This option concerns a different Predictive project schedule and methods situation: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. For the reported case, use this verification: Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline.

B:

The proposed action (Compute total float as late start minus early start, giving four days under the stated unconstrained network. Record the rationale before the next commitment.) comes from a different Predictive project schedule and methods situation: An activity can start no earlier than project day 5 but can start as late as day 9 without delaying the current network completion. It does not resolve or independently test the stated issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Here, the relevant check is Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline. [R158 R158-Q0373; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

C:

This is a tempting but unsupported shortcut in this case: A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance. It does not show that Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence. [R158 R158-Q0373; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

Question 374

After a corrective decision on Quality-control-threshold, which independent evidence most directly verifies the result ? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline.
  2. A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance.
  3. Trace work packages to scoped audit deliverables and identify the accountable control or acceptance point. Retain the initiating evidence for audit.
  4. Check 75,000−90,000=−15,000 and distinguish this cost-denominated metric from calendar days. Retain the initiating evidence for audit.

Explanation

Correct Answer

A:

This checks the actual mechanism rather than merely declaring success: Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline. The desired observed result is Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence. [R158 R158-Q0374; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

Incorrect Answers

B:

This is a tempting but unsupported shortcut in this case: A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance. It does not show that Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence. [R158 R158-Q0374; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

C:

This option concerns a different Predictive project schedule and methods situation: A project WBS has vague headings such as weekly calls and team morale but lacks identifiable deliverables for the security audit. For the reported case, use this verification: Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline.

D:

This option concerns a different Predictive project schedule and methods situation: A predictive project has PV=$90,000 and EV=$75,000 at the review date. For the reported case, use this verification: Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline.

Question 375

Which statement most accurately flags a misleading shortcut to avoid in this Quality-control-threshold case? At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review.
  2. A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance.
  3. Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence.
  4. Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline.

Explanation

Correct Answer

B:

The shortcut is mistaken: A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance. The appropriate response is to apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a supported decision, not the unsupported claim: Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review. It responds to the actual project issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork.

C:

This is a relevant outcome to seek after the decision: Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence. It is not an unsupported assumption.

D:

This is an appropriate independent test of the proposed decision: Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline. It is not the invalid shortcut.

Question 376

Select THREE consistent elements of the Quality-control-threshold case: appropriate decision, verification, and observable success condition. At a later governance checkpoint, conflicting stakeholder pressure makes a second, evidence-based decision necessary. Scenario: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance.
  2. Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review.
  3. Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline.
  4. Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence.
  5. Scope control and schedule execution operate at appropriate levels of detail. The result is recorded in the project controls.
  6. Compute total float as late start minus early start, giving four days under the stated unconstrained network. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

B:

The case evidence identifies A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. The specified decision directly addresses it: Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review. This can be checked using Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline. [R158 R158-Q0376; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

C:

This checks the actual mechanism rather than merely declaring success: Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline. The desired observed result is Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence. [R158 R158-Q0376; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

D:

The stated result demonstrates the case acceptance condition: Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence. It depends on the decision Apply the approved quality plan's sampling and defect criteria and escalate nonconforming test results. Document impacted stakeholders and the decision owner at the review.

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: A signed inspection checklist without measured defect results cannot establish compliance with the numerical tolerance. It does not show that Quality evidence demonstrates whether delivered units meet the defined requirement. The decision can be traced to the review evidence. [R158 R158-Q0376; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

E:

This option concerns a different Predictive project schedule and methods situation: A project team schedules the whole data-center migration as one eight-month activity without decomposing its scoped work package into executable tasks. For the reported case, use this verification: Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline.

F:

The proposed action (Compute total float as late start minus early start, giving four days under the stated unconstrained network. Document impacted stakeholders and the decision owner at the review.) comes from a different Predictive project schedule and methods situation: An activity can start no earlier than project day 5 but can start as late as day 9 without delaying the current network completion. It does not resolve or independently test the stated issue: A manufacturing project must verify at most two critical defects per 1,000 units, but the team reports only completion of inspection paperwork. Here, the relevant check is Review sample size, critical defect count and the agreed acceptance limit. Reconcile the result with the current approved decision baseline. [R158 R158-Q0376; case R158-C094; CAPM domain 2, task 2.2; source ECO.]

Question 377

Which project-management decision best addresses the Integration-change-impact situation ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Approving the new unit by engineering preference alone ignores budget, safety and interface effects.
  2. Evaluate the integrated impact on scope, schedule, cost, interfaces and approvals before altering baselines. Record the rationale before the next commitment.
  3. Decompose the approved project scope into deliverable-oriented components and work packages that can be planned and controlled. Record the rationale before the next commitment.
  4. Identify the procurement branch as the controlling longer path and plan the milestone at 17 days, assuming no other constraints. Document impacted stakeholders and the decision owner at the review.

Explanation

Correct Answer

B:

Evaluate the integrated impact on scope, schedule, cost, interfaces and approvals before altering baselines. Record the rationale before the next commitment. To verify the specified result, inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit.

Incorrect Answers

A:

This is a tempting but unsupported shortcut in this case: Approving the new unit by engineering preference alone ignores budget, safety and interface effects. It does not show that The approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls. [R158 R158-Q0377; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

C:

The proposed action (Decompose the approved project scope into deliverable-oriented components and work packages that can be planned and controlled. Record the rationale before the next commitment.) comes from a different Predictive project schedule and methods situation: A project WBS has vague headings such as weekly calls and team morale but lacks identifiable deliverables for the security audit. It does not resolve or independently test the stated issue: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Here, the relevant check is Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit. [R158 R158-Q0377; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

D:

The proposed action (Identify the procurement branch as the controlling longer path and plan the milestone at 17 days, assuming no other constraints. Document impacted stakeholders and the decision owner at the review.) comes from a different Predictive project schedule and methods situation: Two parallel activities lead to the same milestone: engineering takes 8 days, procurement 13 days, followed by a common 4-day commissioning task. It does not resolve or independently test the stated issue: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Here, the relevant check is Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit. [R158 R158-Q0377; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

Question 378

After a corrective decision on Integration-change-impact, which independent evidence most directly verifies the result ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Trace work packages to scoped audit deliverables and identify the accountable control or acceptance point. Retain the initiating evidence for audit.
  2. Calculate both path lengths as 8+4=12 and 13+4=17 days and inspect the dependency network. Reconcile the result with the current approved decision baseline.
  3. Approving the new unit by engineering preference alone ignores budget, safety and interface effects.
  4. Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit.

Explanation

Correct Answer

D:

Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit. The expected result is the approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls.

Incorrect Answers

A:

The proposed verify (Trace work packages to scoped audit deliverables and identify the accountable control or acceptance point. Retain the initiating evidence for audit.) comes from a different Predictive project schedule and methods situation: A project WBS has vague headings such as weekly calls and team morale but lacks identifiable deliverables for the security audit. It does not resolve or independently test the stated issue: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Here, the relevant check is Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit. [R158 R158-Q0378; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

B:

The proposed verify (Calculate both path lengths as 8+4=12 and 13+4=17 days and inspect the dependency network. Reconcile the result with the current approved decision baseline.) comes from a different Predictive project schedule and methods situation: Two parallel activities lead to the same milestone: engineering takes 8 days, procurement 13 days, followed by a common 4-day commissioning task. It does not resolve or independently test the stated issue: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Here, the relevant check is Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit. [R158 R158-Q0378; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

C:

This is a tempting but unsupported shortcut in this case: Approving the new unit by engineering preference alone ignores budget, safety and interface effects. It does not show that The approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls. [R158 R158-Q0378; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

Question 379

Which statement most accurately flags a misleading shortcut to avoid in this Integration-change-impact case? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. Approving the new unit by engineering preference alone ignores budget, safety and interface effects.
  2. Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit.
  3. Evaluate the integrated impact on scope, schedule, cost, interfaces and approvals before altering baselines. Record the rationale before the next commitment.
  4. The approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls.

Explanation

Correct Answer

A:

The shortcut is mistaken: Approving the new unit by engineering preference alone ignores budget, safety and interface effects. The appropriate response is to evaluate the integrated impact on scope, schedule, cost, interfaces and approvals before altering baselines. Record the rationale before the next commitment.

Incorrect Answers

B:

This is an appropriate independent test of the proposed decision: Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit. It is not the invalid shortcut.

C:

This is a supported decision, not the unsupported claim: Evaluate the integrated impact on scope, schedule, cost, interfaces and approvals before altering baselines. Record the rationale before the next commitment. It responds to the actual project issue: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost.

D:

This is a relevant outcome to seek after the decision: The approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls. It is not an unsupported assumption.

Question 380

Which observed result supports acceptance of the Integration-change-impact corrective decision ? During scope and delivery planning, the team must make a documented decision before significant work proceeds. Scenario: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Assume the named constraints and approvals are genuine and that no unrelated problem is present.

  1. The approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls.
  2. Scope control and schedule execution operate at appropriate levels of detail. The result is recorded in the project controls.
  3. Approving the new unit by engineering preference alone ignores budget, safety and interface effects.
  4. The WBS covers authorized outputs without mistaking recurring meetings for the deliverables themselves. The decision can be traced to the review evidence.

Explanation

Correct Answer

A:

The stated result demonstrates the case acceptance condition: The approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls. It depends on the decision Evaluate the integrated impact on scope, schedule, cost, interfaces and approvals before altering baselines. Record the rationale before the next commitment.

Incorrect Answers

B:

This option concerns a different Predictive project schedule and methods situation: A project team schedules the whole data-center migration as one eight-month activity without decomposing its scoped work package into executable tasks. For the reported case, use this verification: Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit.

C:

This is a tempting but unsupported shortcut in this case: Approving the new unit by engineering preference alone ignores budget, safety and interface effects. It does not show that The approved plan reflects coherent cross-functional impacts instead of isolated equipment changes. The result is recorded in the project controls. [R158 R158-Q0380; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

D:

The proposed outcome (The WBS covers authorized outputs without mistaking recurring meetings for the deliverables themselves. The decision can be traced to the review evidence.) comes from a different Predictive project schedule and methods situation: A project WBS has vague headings such as weekly calls and team morale but lacks identifiable deliverables for the security audit. It does not resolve or independently test the stated issue: A client requests a larger refrigeration unit that affects power demand, structural loads and installation cost. Here, the relevant check is Inspect change analysis across affected engineering disciplines and the final governance decision. Retain the initiating evidence for audit. [R158 R158-Q0380; case R158-C095; CAPM domain 2, task 2.2; source ECO.]

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests

UP

SPECIAL OFFER: GET 10% OFF

This is ONE TIME OFFER

ExamSnap Discount Offer
Enter Your Email Address to Receive Your 10% Off Discount Code

A confirmation link will be sent to this email address to verify your login. *We value your privacy. We will not rent or sell your email address.

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.